Caltrain Modernization Program CA Passenger Rail Summit April 29, 2015.

Slides:



Advertisements
Similar presentations
Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
Advertisements

The travel solution for our time 1 High-Speed Rail at Amtrak Frank Vacca, Chief Engineer June 24, 2011.
MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Commuter Rail Vehicle Technology September Commuter Rail Vehicle Technologies for FasTracks Diesel & Dual Mode Locomotive Hauled Coaches (LHC) Electric.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
1 Amtrak’s Vision for the Northeast Corridor PRIIA 305 Annual General Meeting – June 14 th, PRIIA305 DMU Approval Meeting Andrew Wood Chief, Next.
High-Speed Rail for California
1 Passenger Rail Solutions – Balanced Approach 2009 Ark-La-Tex Rail Summit May 9, 2009 – Marshall, TX Joe Adams, Vice President – Public Affairs.
CSSC Regional Rail Partners, September 18, 2012 Chesapeake Connector : Freight and Passenger Rail Benefits Study.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE Dan Richard, Chair California Passenger Rail Summit April 29, 2015 Sacramento, CA.
Station Development Update Melissa DuMond, Director of Planning and Integration April 29, 2015.
ACEforward The new regional initiative to improve our connection between the Central Valley and the Bay Area.
North Corridor Commuter Rail The Case For Tax Increment Financing Mecklenburg County May 2007.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Caltrain Modernization Program Update Palo Alto City Council Rail Committee August 10, 2012.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
Caltrain Modernization CMAA September 18, Caltrain Today.
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
1 CALIFORNIA HIGH-SPEED RAIL Silicon Valley Leadership Group February 5, 2014 eBay, San Jose P R E S E N T E D B Y Ben Tripousis Northern California Regional.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
April 29,  Investment in new and improved services, with a strong focus on customer experience  Investment focused on improving efficiency  Shorter.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
1 Passenger Rail Solutions – Balanced Approach 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009 Joe Adams, Vice President – Public.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
VRE SYSTEM PLAN WEBINAR October 9, 2013 Christine Hoeffner, VRE Foster Nichols, Parsons Brinckerhoff.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Capitol Corridor: A Performance-Based Management Model FRA Best Practices - State IPR Corridor Management AASHTO – SCORT Annual Meeting, Washington DC.
“An Iterative Capacity Constrained Parking Methodology for Ridership Forecasts for BART Extension Stations” Mike Aronson May 19, th TRB National.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Transport Update Chris Carter Transport Strategy Manager.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
February 6, 2007 Steve Heminger Executive Director Smart Growth in the Bay Area: Carrots or Sticks Painted Orange? Carrots or Sticks Painted Orange?
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express Minneapolis-Duluth/Superior Passenger.
CHAPTER 17 RAIL PASSENGER SERVICES IN U.S..
Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner.
BART: The Next 40 Years Critical Reinvestment Needs
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Transforming rail travel in the North Sheffield Chamber of Commerce & Industry Mark Barker Stakeholder Manager Northern Franchise.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Northern Transforming Rail Travel in the North Matthew Worman Stakeholder Manager 11 th April 2016.
Metrô Rio & SuperVia March Location BRASIL Rio de Janeiro Rio Rio de Janeiro Metropolitan Region - Population: 11,6 million - Counties: %
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
City Council Study Session March 15, 2010
Capital Programming Committee South Coast Rail Phase 1 Service
Bike+Rail in the Bay Area Andy Thornley San Francisco Bicycle Coalition The Last Green Mile Sustainable ways to complete the rail trip Rail~Volution,
North Suburban Planning Council
AN INVESTMENT IN CALIFORNIA’S FUTURE
Project Update July 2018 through January 2019.
Presentation transcript:

Caltrain Modernization Program CA Passenger Rail Summit April 29, 2015

1 Caltrain System Today

About Caltrain Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations Ridership Today: ~ 61,000+ weekday Projected 2040 Ridership: ~100,000+ weekday Tenants: ACE, CC, Amtrak, freight 2

Over Capacity Northbound Train #Depart SJ Max Load % Seated Capacity 3197:03am796123% 3237:45am746115% 3298:03am738114% 3755: % 2176:57am675104% 2257:50am674104% 2338:40am64199% 3136:45am63297% 3 Southbound Train #Depart SF Max Load % Seated Capacity 3765:33pm813125% 3705:15pm706109% 3664:33pm690106% 2684:56pm670103% 2785:56pm648100% 3248:14am62296% 3227:57am62296% Note: February 2014 counts (lower ridership season)

4 Caltrain Modernization

Caltrain Modernization Program Early Investment Program – Advanced Signal System: CBOSS PTC (2015) – Peninsula Corridor Electrification Project (2020) Caltrain/HSR Blended System 5

Peninsula Corridor Electrification Program 7 AreaProjectService 51+ miles San Francisco to San Jose (Tamien Station) Electrification: Overhead Contact System (OCS) Traction Power Facilities Electric Multiple Units (EMUs) Up to 79 mph Service Increase 6 trains / hour / direction More station stops / reduced travel time Restore Atherton & Broadway service Mixed-fleet service (interim period) Cont. tenant service

Key Regional Benefits (2040) 8 Note: 2013 BAC Report, generates $2.5B economic activity and 9,600 jobs

9 Key PCEP Milestones % Design 2009 FONSI Party Regional Funding Plan 2013 DB Contracting Method Selected RFQ and RFI complete EIR Certification -Update Funding Plan (cost update) -Issue RFPs Design/Manufacture/Build/Test

11 Rail Integration

HSR / Caltrain Blended System 12

Future Incremental Investments 15 CalMod Program CBOSS PTC 2015 Corridor Electrification 2020 Additional HSR Improvements HSR Stations Passing Tracks Maintenance Facility System Upgrades (110mph) Additional Caltrain Improvements Longer Trains / Platforms Level Boarding State of Good Repair & Reliability / Capacity Improvements SF Downtown Extension (led by TJPA) Green – Caltrain lead; Orange– partner agency lead

Shared System (Tracks) Sensitivity to community footprint Share existing 2 track system (primarily) From 79 mph to 110 mph 10 slots peak hour one way -6 for Caltrain -4 for HSR (with passing tracks) Trade-off (for community buy in) -Limit capacity (long term growth) -Limit flexibility / reliability 13

Shared System (Stations) Dedicated or Shared Platforms System Flexibility Caltrain EMU Modification -Double sets of doors -One set of doors with traps Trade-off (for system flexibility) -Seat loss -Operational challenges -Station footprints TBD 13

Food for Thought Sharing / Integration -Is good -Prudent approach -Maximize utility Trade-offs 13

Questions 16 For more information and project updates website: