Caltrain Modernization CMAA September 18, 2014. 2 Caltrain Today.

Slides:



Advertisements
Similar presentations
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011.
Advertisements

CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Commuter Rail Vehicle Technology September Commuter Rail Vehicle Technologies for FasTracks Diesel & Dual Mode Locomotive Hauled Coaches (LHC) Electric.
First Statewide Comprehensive Rail Plan for MN Commissioned by 2008 Legislature Compliant with 2008 PRIIA Federal Rules 6 Months to prepare, 10 Months.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
City of Charlotte Southeastern Rail-Highway Safety Conference Collaborating for Success With Railroads Carolyn Flowers, CATS CEO November 7, 2012.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
CALIFORNIA’S HIGH-SPEED RAIL SYSTEM Society of American Military Engineers S.A.M.E. May 26, 2011.
A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE Dan Richard, Chair California Passenger Rail Summit April 29, 2015 Sacramento, CA.
ACEforward The new regional initiative to improve our connection between the Central Valley and the Bay Area.
SO YOU WANT MORE PASSENGER RAIL… LOOKING AT THE FUNDING LANDSCAPE ERIC PAPETTI FEDERAL TRANSIT ADMINISTRATION 12/10/2014.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
Title Slide California High Speed Rail Authority Board Meeting September 28, 2005.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
SCORT Annual Meeting Jacksonville, Florida September 20, 2010 Passenger Rail in Florida.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
DCTA Project Update Thomas M. LeBeau Vice President Capital Projects.
Caltrain Modernization Program Update Palo Alto City Council Rail Committee August 10, 2012.
Bay Area Bike Sharing Pilot Program April 3, 2013.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
King County Metro Long Range Public Transportation Plan Kirkland Transportation Commission_ April 10, 2015.
Caltrain Modernization Program CA Passenger Rail Summit April 29, 2015.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
Southeast Michigan Council of Governments. Ann Arbor –Detroit Regional Rail Project Update April 27, 2010.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
1 CALIFORNIA HIGH-SPEED RAIL Silicon Valley Leadership Group February 5, 2014 eBay, San Jose P R E S E N T E D B Y Ben Tripousis Northern California Regional.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
FLORIDA HIGH SPEED RAIL Presented by: Nazih K. Haddad Florida Department of Transportation USHSR Conference March 4, 2010.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
A New Regional Vision ASPA Conference April 2010 Steve Heminger, MTC Executive Director.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
Florida High Speed Rail Authority Update for Orange County Board of County Commissioners April 7, 2009.
San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Transport Update Chris Carter Transport Strategy Manager.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
February 6, 2007 Steve Heminger Executive Director Smart Growth in the Bay Area: Carrots or Sticks Painted Orange? Carrots or Sticks Painted Orange?
1 Round One Public Outreach Workshops Fall 2005 Presented to: Women’s Transportation Seminar 2007 Annual Conference May 2, 2007 Presented by: Therese McMillan.
Transportation Planning: A Field in Flux Steve Heminger, Executive Director Metropolitan Transportation Commission April 2004.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Nathan Smith Co-Project Manager California State Rail Plan March 7, 2012.
Water Emergency Transportation Authority 1 San Francisco Bay Area Draft Short Range Transit Plan January 2016.
BART: The Next 40 Years Critical Reinvestment Needs
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
1 Eagle P3 Project Update FasTracks Monitoring Committee May 12, 2015.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
Affordable Housing and Sustainable Communities (AHSC) Program
Get there. Needham Commuter Rail September 2 – November 18, 2017
Positive Train Control
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Tampa Historic Streetcar, Inc. May 16, 2018
Capital Programming Committee South Coast Rail Phase 1 Service
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
Rail Program Management Services
Project Update July 2018 through January 2019.
Integrating High Speed Rail, Regional Rail, and Transit Services in California AASHTO SCORT Meeting Washington, DC February 22, 2017.
Presentation transcript:

Caltrain Modernization CMAA September 18, 2014

2 Caltrain Today

Key Facts Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations 92 trains / weekday Ridership: ~ 55,000+ weekday 3

Caltrain Ridership 4 Note: Bike Ridership 11 % increase (FY14)

2014 Top Ridership Trains 5 Note: February 2014 counts (lower ridership season)

6 Caltrain Modernization

Advanced Signal System (2015) 7

Project Description Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC) Fiber Optic Network Project Requirements ‒ Includes federal mandate (PTC) ‒ Improves Caltrain performance Project Partners ‒ FRA, UP, CHSRA, JPB 8

Description Cost (in millions) Milestones Project Planning and Procurement $ Phase 1 - Critical Design$ – 2013 Phase 2 - Final Design, Data Communications Subsystem & Fiber Backbone Installation $ – 2014 Phase 3/4 - Installation, Testing, Commissioning $ – 2016 (Revenue service Oct. 2015) Total$231 Project Total Cost and Milestones 9

Peninsula Corridor Electrification Project (2019) 10

PCEP Project Description* 8 AreaProjectService 51+ miles San Francisco to San Jose (Tamien Station) Electrification: Overhead Contact System (OCS) Traction Power Facilities Electric Multiple Units (EMUs) Up to 79 mph Service Increase 6 trains / hour / direction More station stops / reduced travel time Restore Atherton & Broadway service Mixed-fleet service (interim period) Cont. tenant service *Proposed project not yet approved, pending environmental clearance

Key Milestones* 12 Activity Stakeholder Outreach Establish Owner’s Team Environmental Clearance Procure/Select Contractor Team Design/Manufacture/Build *Schedule subject to change

Funding Plan 13 Funding SourceElectrificationEMUs JPB Members3194 JPB (prior funding)11 State Prop 1B5 Prop 1A HSR600 FTA (prior funding)16 FTA (future) Bridge Tolls 11 BAAQMD Carl Moyer 20 Total Funding$785M$440M Note: 2009 cost estimate

Key Regional Benefits 14

High-Speed Rail Partnership 15

Blended System Vision 16 *Based on LTK computer model simulation (March 2012)

Incremental Investments 17 CalMod Program CBOSS PTC 2015 Corridor Electrification 2019 Additional HSR Improvements HSR Stations Passing Tracks Maintenance Facility System Upgrades (110mph) Additional Caltrain Improvements Longer Trains/ Platforms Level Boarding State of Good Repair & Reliability/Capacity Improvements Note: Orange has no funding plan; Green has funding plan Downtown Extension (led by TJPA)

Q/A 18