1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB
2 Contractors Breakdown in communicationBreakdown in communication Paver PridePaver Pride Too much prep work before surfacingToo much prep work before surfacing – time consuming – expensive
3
4
5
6 Today we are going to touch on some basic ideas for steps that we can take to prepare us for hiring and managing a skilled paving contractor.
7 HIRE A COMPETENT CONTRACTOR Interview Process Investigate the company
8 JOB SITE MEETINGS WITH PAVER ► Visit Site ► Ask Questions
9 JOB PLAN & JOB GOALS Manpower Manpower Equipment Equipment Asphalt Plant Asphalt Plant Trucking Requirements Trucking Requirements
10 SUB-GRADE SUB-GRADE Proper aggregate placement / prep SUB-BASE SUB-BASE Issues with wet stone base GRADING GRADING Compaction
11
12
13
14 ASPHALT PAVING Asphalt Materials Paving Machine / Screed set-up Laser / Sonics Asphalt joints Low areas
15
16
17
18
19 ASPHALT ROLLING This can make / break a job Initial rolling / final rolling Asphalt temperatures Roller marks
20
21
22
23 QUESTIONS Questions from your projects?
24 Take the time to prepare our companies and our sub-contractors. There should be no surprises. My advice is not to assume that “anyone can do this”.