Design of Drilling Contracts – Economic Incentives and Contractor’s Focus on HSE Presented by Anders Toft SPE International Conference on Health, Safety.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

TRADABLE PERMITS IN WATERWAY TRANSPORT JIM FAWCETT ECONOMIST GALVESTON DISTRICT.
A Joint Code of Practice Objectives and Summary Presentation
A contract of employment is a reciprocal contract in terms of which an employee places his services at the disposal of another person or organisation,
Contract Performance, Breach and Remedies Chapter 9.
Occupational Disease and Experience Rating. Overview  Statistics suggest a high prevalence of occupational disease (‘OD’) in New Zealand.  Our no-fault.
Construction Engineering 221 Cost Estimating and Bidding II.
Theme 4 Common Law Contract of Employment
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Virtual Arrival an Initiative by Shipping to reduce GHG emission Singapore 8 may 2012 Senior Manager Research & Projects INTERTANKO.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
Introduction to Derivatives and Risk Management Corporate Finance Dr. A. DeMaskey.
Liabilities and Risk Sharing RA Dirk Hoffmann MBA all rights reserved Best practices – a European perspective Dirk Hoffmann, MBA, Lawyer (Germany)
Bevan Brittan LLP- Highways Maintenance Contracts Nathan Bradberry, Senior Associate Johnathan Adams, Associate 6 November 2014.
Contracts: Third Party Rights, Discharge, Breach and Remedies Chapter 10.
Time for a new standard - AS General Conditions of Contract
1 REGULATION (B) When/Where Government Regulation of Business is Justified (produce benefits in excess of costs) in a Market Economy.
Lecture 5 Contracting and Other Economic Determinants of Financial Reporting.
Fair Premiums, Insurability of Risk and Contractual Provisions
Managing your client risks in difficult times Peter Scott PETER SCOTT CONSULTING.
Chapter 3: Risk Management
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Five Activities Contracting Officers and Government Contractors Should Avoid Presented by: James F. Moseley, Jr. of Moseley, Prichard, Parrish, Knight,
Insurance Fundamentals for Policymakers. Four assignments: Insurance Principles Insurance Coverages: Property and Casualty Insurance Coverages: Life and.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Basis for Compensation fixation
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 20 Strategy, Balanced Scorecards and Incentive Systems.
REGULATORY LEGAL AND CONTRACTUAL ASPECTS OF PPP IN WATER AJAY RAGHAVAN Counsel Training Workshop, Bhopal, February 2009.
Hanne Sofie Logstein, NIFS Petroleum Safety Regulation - the Norwegian Way Research fellow Hanne Sofie Logstein, Scandinavian Institute of maritime Law,
DEVELOPMENTS IN THE LAW RELATING TO ‘CONSEQUENTIAL LOSS’ Anthony Jucha 30 March 2010.
Function of Financial Management and Financial Accounting in the Health and Fitness Sector.
ACCT3003 Issues in Accounting Theory
Richard E. Thompson II, Esq.
LOGO The collective agreement. The labour contract.
Types of stakeholder Internal: internal to the firm Internal: internal to the firm –employees –shareholders /owners Connected: connected by a relationship.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
The project finance termsheet Broad characteristics: 12 mln USD for expansion of power plant. Two year grace (construction) period, reimbursement over.
FAR Part 31 Contract Cost Principles and Procedures.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
Safety in Construction Contracts Presented By: Ramy besaiso Instructor : Eng: Eyad Haddad Chapter 10.
Reporting to Stakeholders. What are Stakeholders? An individual or group with an interest in an organisation An individual or group with an interest in.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Performance Measurement & Management Compensation
Project Procurement Management
UNIT IV - INDUSTRIAL SAFETY
Certified Protection Officer Program. Chapter 1 Unit 1 Concepts and Theories of Asset Protection Pages 3-11.
12/16/ Chapter 1 - Objectives (1.1) When you have completed this section, you will be able to: Define personal financial planning Name the six steps.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 3 Introduction to Risk Management.
ISO Registration Common Areas of Nonconformances.
T4.1 H&N, Ch. 4 Chapter Outline 4.1CONTRACTING COSTS OF RISK POOLING ARRANGEMENTS Types of Contracting Costs Ex Ante Premium Payments vs. Ex Post Assessments.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Introduced some basic knowledge of the contract First, what is the contract? Contract, also known as contract. China's definition of the contract, the.
INTRODUCTION We are exposed to many risks in our day to day life. Nobody can predict what may happen in the next moment. There may be an accident, calamity,
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
Contract Performance In Traditional and E-Contracts; Breach of Contract and Remedies Chapter 18 & 19.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
© Cengage Learning – Purchasing & Supply Chain Management 4 ed ( ) Analysis 3. The purchasing process: the buyer’s role.
Campus Wide Safety Committee Initial Meeting 11/9/16
Chapter 51 Insurance Law Chapter 51: Insurance Law
Accounting (Basics) - Lecture 5 Lease
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
PETROLEUM & NATURAL GAS RULES 1959
(Additional materials)
Quality Management Systems – Requirements
Contractor Liability on
Mitigation.
Contractor management at Sasol Mining
Contractor management at Sasol Mining
Presentation transcript:

Design of Drilling Contracts – Economic Incentives and Contractor’s Focus on HSE Presented by Anders Toft SPE International Conference on Health, Safety & Environment March 2004

Work hours offshore, Norwegian continental shelf

Economic incentives - definition Definition The contractor undertakes a complicated project for the operator. The effort is not observable for the operator To secure a satisfying result the operator makes the compensation dependent on the contractor’s performance Generally, the operator motivates the contractor by transferring economic risk The contractor is made economic responsible for his action High level of risk gives strong incentives

The theory of multi-tasking Usually, the operator wants the contractor to focus on more than one aspect of the product Perform a drilling operation efficiently and to a low cost, but also appreciate the importance of HSE, drill a well with good production characteristics and a long production period Performance can be measured easily for some tasks, but be more difficult for others, for instance HSE When the operator cares about different activities of the contractor, but compensates only based on the observable subset of these activities, the contractor will exert greater effort on these activities while neglecting the unobservable ones It might be better, even, to provide no incentives at all than to provide them for one aspect of a job only

Case: Design of drilling contracts

Economic incentives in drilling contracts Compensation format Maintenance and repair clauses Incentives schemes Allocation of financial liability in the event of accidents Consequences associated with violation of safety regulations Bidding process

Compensation format Day rates that include all costs The contractor covers costs associated with training, maintenance etc. Money saved will accrue to the supplier Compared to turnkey contracts (fixed price), day rates may give stronger focus on safety, but give significantly weaker cost incentives Day rates motivate cost reduction, but do not contain strong tempo incentives (as is the case with a fixed price contract) To keep the rig in operating mode as long as possible the day rates are differentiated

Day rates - example Operating rate per day (OR) Stand-by rate per dayOR*0,90 Moving rate per dayOR*0,80 Suspension rate per dayOR*0,50 Re-drilling rate per dayOR*0,25 Lay-up rate per dayOR*0,50 No payment rate ”If the drilling unit is unable to perform the drilling work (exhibit xx) or the performance of the work is delayed due to repairs, maintenance and/or modifications to the drilling unit, slow progress or other non- compliance with the contract”

Maintenance and repair clauses Differentiated day rates – incentive to keep the rig in operational mode and not stop the drilling operation for maintenance and repair Postpone/omit maintenance and repair Maintenance and repair are conducted while the rig is in operational mode Use of maintenance and repair clauses to curb this incentive Press Release E211: November 2002 ”The report identifies maintenance, drilling and deck operations as the highest risk activities…”

Maintenance and repair clauses Example 1 20 hours of repair and maintenance at the paid operating rate. Accumulation from month to month, max. 120 hours over a period of six months. No transfer between six-month periods. Accumulated time can only be used for planned maintenance (at least 7 days planning perspective) Example 2 Repair rate, estimated at accumulated time during a calendar month (cannot be transferred to the next month). 0-8 hours, operating rate (+ USD 30,000) hours, 80% of the operating rate. 16 hours and above, zero rate Incentive bonus of USD 30,000 per calendar month if the repair time is less than eight hours. Example 3 No maintenance and repair clause

Incentives schemes Compensation in excess of fixed day rates Usually linked to progress Used to a varying extent and with varying force Ex post discussions related to criteria Uncertainty with regard to effect Damaging effects on safety focus Example 1 USD per day (24 hours) or pro rata thereof for the time saved on the well subject to zero Loss Time Accident Example 2 USD 115,000 per day if less time spent than stipulated. Time spent: based on average for the three previous wells

Allocation of financial liability in the event of accidents The greater the share of accident costs the contractor must bear, the greater is the incentive with regard to safety focus Financial liability related to Damage/injury/loss of personnel, property and indirect loss Damage to reservoirs and wells Third party claims, pollution, removal of rig/equipment from seabed Example: damage to wells Who is responsible for damage to wells –Criteria for contractor’s liability – Re-drilling rate

Violation of the safety regulations – financial consequences Operator’s right to terminate the agreement because of violation of safety regulations/company specific safety requirements ”Contractor shall comply with Company's safety requirements at anytime. Failure to comply with the provisions of this Article shall be deemed to be a substantial breach of Contract” Dependent on the operator’s attitude (formalistic versus pragmatic) Economic consequences

Bidding process The principles of bid evaluation constitute the most important incentive format for suppliers What the contractors experiences as the most important bid evaluation criteria and hence focus on – constitute an incentive format Emphasis on safety versus economic factors The effect of using e-auctions

Contractor’s progress considerations Rapid progress Avoid reduced rate/zero rate Achieve bonus Obtain new assignments/options Avoid accidents Termination of agreement Delay Other costs, for example costs related to effects on reputation Market situation Rates and conditions in new assignments

Contractor’s progress considerations Probability analysis Delay means economic loss the for rig owner with a high probability Faster progress means loss with low probability, and the relationship between action and effect may be complex Horizon (discount factor) Weigh certain loss now against possible loss later Considerations will be affected by companies’ liquidity

What determines behaviour? Economic incentives Behaviour Social norms