Presentation to the Professional Engineers in Mining Steve Hohmann, Commissioner Kentucky Department for Natural Resources September 6, 2013.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

General Insurance Statistical Agency (GISA) Presentation to Ontario Conference of Casualty Actuaries November 9, 2005.
Certification of Compliance By Evita Lagard
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
WELCOME TO THE INDUSTRIAL COMMISSION SELF-INSURANCE SEMINAR.
AB 86: Adult Education Consortia Planning Grant Management Reporting System Webinar Series
Unified Carrier Registration (UCR) Update August 24, 2006.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Chapter 43 An Act Relative to Improving Accountability and Oversight of Education Collaboratives Presentation to Board of Elementary and Secondary Education.
Deficit District Roles & Responsibilities. MCL A district or intermediate district receiving money under this act shall not adopt or operate.
Northern Michigan SBO March 16, 2011 Jeff Kolb Michigan Department of Education Jeff Kolb Michigan Department of Education.
1 Wetland Regulatory Programs Department of Natural Resources Legislative Audit Bureau July 2007.
Minnesota Agricultural Water Quality Certification Program Senate Environment, Economic Development And Agriculture Finance Committee March 11, 2013.
Columbia University IRB IRB 101 September 21, 2005 George Gasparis, Executive Director, CU IRB Asst. V.P. and Sr. Asst. Dean for Research Ethics.
Districts In Good Standing. Origins Discussed at November 2010 meeting Approved by the Soil and Water Conservation Commission during January 2011 meeting.
ACFA Work Plan & the Higher Accommodation Supplement 1.
Presentation: Friday, April 9,  Repeat s on the 15 th of each month  All information will be sent to all returning students, faculty, advisors.
ZHRC/HTI Financial Management Training
Minnesota Law and Health Information Exchange Oversight Activities James I. Golden, PhD State Government Health IT Coordinator Director, Health Policy.
Development (Impact) Fee Program Changes to Comply with State Law Mayor and Council Study Session June 3, 2014.
SURFACE MINING CONTROL AND RECLAMATION ACT OF 1977 Rosemary Newsome.
Chapter 11 Application for Present-Use Value 1. Application for PUV The present-use value program is a voluntary program that provides the owner with.
Presented by Jennifer Kluge Michigan Business and Professional Association.
Financial Matters Ron Ferrill, District Treasurer 2011 PETS.
Reimbursements, Reporting & Budget Modifications
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
STATE STATUTES AND REGULATIONS Kentucky Department of Education Division of District Support Services District Funding & Reporting Branch.
Independent School Process Agency of Education State Board of Education Presentation March 25, 2014.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
ACCJC SPECIAL REPORT DUE TO FINANCIAL REVIEW CONTACT: DR. VICTOR JAIME, ED.D DUE: APRIL 15, 2014.
“Keeping your money in your pocket, where it belongs.” Chart of Accounts Update Florida Court Clerks & Comptrollers - New Clerk Academy March 13, 2014.
Presentation to the Oversight Board Santa Clara County Auditor-Controller 1.
Supervision and regulation of banking system duty is given to a autonomous organization called Banking Regulation and Supervision Agency. BRSA is public.
Money Handling Procedures Updated by Roger Sparrow, Karen Ramage & David Herbst April 2014.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
STRATEGIC PLANS, BUDGETS AND ANNUAL REPORTS Presentation to Portfolio Committee on Arts and Culture 11 March 2008.
1 AUDIT AND RISK COMMITTEE REPORT Parliamentary Portfolio Committee on Energy Ms Thulisile Mashanda– Member: Audit and Risk Committee 15 October 2013.
FINANCIAL MATTERS RON FERRILL, DISTRICT TREASURER 2012 PETS.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
Fiscal Monitoring and Oversight Tecumseh Local School District January 8, 2013 Roger Hardin, Assistant Director Finance Program Services (614)
1 Supplemental ESF Application and Changes in ARRA Reporting Office of Educational Management Services New York State Education Department March 10, 2010.
SANEDI. INDEX  KEY ACTIVITIES DURING FINANCIAL YEAR  DISCUSSIONS ON KEY ACTIVITIES  CONCLUSION  APPRECIATION.
Charter School Facilities Funding 2010 Florida Charter School Conference November 9, 2010 William E. Fontaine Office of Educational Facilities.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
VI. Developing a VSMP Program General Stormwater Training Workshop.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
REPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON THE FINDINGS OF THE AUDITOR GENERAL AND THEIR RECOMMENDATIONS ON THE ANNUAL REPORT.
Nash-Rocky Mount Schools Payroll Schedule End of Month Pay Days covered Period in paycheck 1 July 1 - July 31 2 Aug. 1 - Aug Sept. 1 -
Budget Workshop: Fiscal Policies, Process, and Budget Guidelines Board of Governors April 21, 2005.
Budget Message Fiscal Year Presented by Kelly Muzzey.
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
Enhanced Wireless Funding through HB 361 Shawn S. Smith Interim Ohio Coordinator.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
May 5, 2016 May 5, Reporting obligations for  Investment banks,  Stockbrokers and dealers  FM and Investment advisers 2. Publication financial.
Florida Insurance Conference on Financial Reporting September 14, 2011 Florida P&C Guaranty Funds.
Noncoal Program Fees Environmental Quality Board April 17, 2012 John Stefanko Deputy Secretary for Active and Abandoned Mining Operations.
Keith M Wilson Director, Education Service U. S. Department of Veterans Affairs February 2009 The Post-9/11 Veterans Educational Assistance Act of 2008.
NJDOE Testing for Lead in School Drinking Water
Governance and Management
Parliament and the National Budget Process
Bureau of Mining Programs Update
How does OHCA’s budget become
2018 Clerks Summer Conference
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Kentucky County Treasurer’s Duties of a County Treasurer
Recognized Obligation Payment Schedule (ROPS) Certification Process
Wastewater Permitting Updates
Presentation transcript:

Presentation to the Professional Engineers in Mining Steve Hohmann, Commissioner Kentucky Department for Natural Resources September 6, 2013

Reclamation Bonding

January 2011 OSM Oversight Report  Report determined Kentucky bonds were not always sufficient to complete reclamation in the event of forfeiture.  OSM issued Kentucky a Part 733 letter.  Letter requires Kentucky to take immediate and long term steps to ensure bond amounts are adequate to complete reclamation in the event of forfeiture.

Immediate Steps New Performance Bond Calculation Protocols  New 405 KAR 10:015 promulgated to change bonding rates.  Regulation raised minimum bond amounts, rates per acre, and supplemental assurance.  Implementation began in May of 2012 and continues today via RAM midterms conducted.  The new protocols have increased bond amounts an average of 60%.  Failure to post additional bond may result in permit suspension.  New regulation contains the 20 year bond requirement for treatment of long term substandard water discharges that had been DNR policy for nearly 15 years.

New Protocols Insufficient to satisfy the 733 Letter  Plans begin for creation of a mandatory pool to provide backstop for individual bonds.  Actuarial Study conducted for the establishment of a mandatory pool.  Study recommendations and input from stakeholders result in filing of HB 66 for the 2013 Legislative Session.

Long Term Steps The Kentucky Reclamation Guaranty Fun d  March 22, 2013 Governor Beshear signs HB 66 into law.  The Kentucky Reclamation Guaranty Fund (KRGF) established in emergency provisions.  KRGF is a mandatory reclamation account designed to cover the costs of reclamation for forfeited coal mining sites when the permit specific bond is inadequate.  The previous voluntary Bond Pool and Bond Pool Commission were abolished by the legislation.  New fund cannot be used for the long term treatment of substandard water discharges or to repair subsidence damage.

Key Provisions of HB 66  Kentucky Reclamation Guaranty Fund Commission established.  Seven (7) members. Six (6) of the members appointed by the Governor.  EEC Cabinet Secretary is Chairman.  Three (3) members represent coal industry.  Two (2) members represent banking/insurance industries.  One (1) certified public accountant.

The KRGF Commission  Responsibilities of the KRGF Commission  Review, recommend, and promulgate regulations necessary to: 1.Monitor and maintain the fund; 2.Establish a structure for processing claims and making payments; 3.Establish the mechanisms to review of the viability of the fund; 4.Set a schedule for penalties for late payment or failure to pay fees and assessments; 5.Review and assign classification of mine types; 6.Establish a structure for the payment of fees and assessments.

Additional Responsibilities of the KRGF Commission  Notify permittees of suspension or reinstatement of fees;  Conduct an annual audit of the fund;  Perform an actuarial study annually;  Authorize expenditures from the fund;  Report to the Governor and Legislature annually;  Conduct investigations to verify reporting, payment, and other activities of

Office of the Reclamation Guaranty Fund  Attached to DNR.  Consists of an Executive Director and three staff positions.  Provides support to the Commission and performs essential functions such as collecting fees, compiling information for assignment or revising permit classification, and contracting for audit and actuarial services.

Initial Funding of the KRGF  Initially funded by the assets of the former voluntary bond pool.  One-time fee assessed to all permittees after July 1, 2013 in the amount of $1,500 per permittee.  $10 per “active acre” fee assessed on permitted and bonded acreage.  Active acre fee will not apply to permits or increments that;  Have not been disturbed,  Have received at least a Phase 1 bond release, or  Contain underground acreage only.  Former members of the voluntary bond pool not assessed any start-up fees.

KRGF Membership and “Opt-out” Provision  July 1, 2013 all permittees are mandatory members of the KRGF.  Permittees that notify the KRGF Commission after July 1, 2013, that they desire to “opt-out” of the fund will not be subject to payment of any fees.  Permit revisions required for those that “opt out” for all permits to incorporate a full cost bond based on “worst case” conditions similar to bonds required by the OSM Bonding Handbook.  Full cost bonds posted by April 30, 2014, or the permit may be suspended.

Permit Classification  All permits classified by the KRGF commission. Permit classification determines fees.  Five permit classifications:  Surface coal mining operations;  Underground coal mining operations;  Combined surface and underground mining operations;  Non-production;  Dormant.

Tonnage Fees  Permits classified as “surface coal mining operations” will pay a fee of $ per ton of coal produced.  Permits classified as “underground coal mining operations” will pay a fee of $ per ton of coal produced.  Permits classified as “combined surface and underground mining operations” will pay a fee in accordance with the predominant method of coal extraction.  Fees will be payable quarterly beginning with the first quarter of  Late payment of fees due will subject the permittee to monetary penalties. Non-payment of fees will subject the permittee to permit suspension.

Non-production Permits & Fees  Permits classified as “Non-production” will be assessed an annual fee of $10 per bonded acre beginning in January of  Examples of Non-production permits: preparation plants, refuse fills & impoundments, haul road only permits, load- outs, and permits that only contain acreage for mine maintenance and other support facilities.  Fee is payable quarterly (due 30 days after the end of a calendar quarter) although may be paid up front in lump sum.  Fee will not apply to permits or increments that are undisturbed, have achieved at least a Phase 1 bond release, or contain underground acreage only.

Dormant Permits and Fees  Permits classified as “Dormant” assessed an annual fee of $6 per bonded acre beginning in January of  “Dormant” permits consist of all remaining permits that do not fall into the other 4 classifications.  Fee payable quarterly (payable within 30 days after the end of a calendar quarter) although may be paid up front in lump sum.  Fee will not apply to permits or increments that are undisturbed, have at least a Phase 1 bond release, or consist of underground acreage only.

Other Important Provisions of the KRGF  Special provisions for members of the former voluntary bond pool.  Other permittees MAY have bonds subsidized by the KRGF in the future dependent upon future approval and implementation by the Commission.  New Permittees after July 1, 2013 required to pay a one time fee of $10,000 prior to issuance of their first permit.

Key Dates for the KRGF  March 22, 2013 – Legislation signed into law creating the KRGF.  March 27, 2013 – Executive Order signed by Governor Beshear granting the DNR authority to administer the KRGF until June 30,  Now – July 1, 2013 – Office of the Reclamation Guaranty Fund is established and staffed.  July 1, 2013 – KRGF Commission is authorized to conduct business.  July-August 2013 – Assessments for “start-up” fees sent to permittees.  September 1, 2013 – Deadline for current members to “opt-out” of the KRGF.  October 1, 2013 – Permit “full cost bonding” revisions due to be filed for those members that chose to “opt-out”.  January 1, 2014 – Snapshot of bonded acres taken for Dormancy and Non- production fee annual assessments.  April 30, 2014 – Last day to submit quarterly fee payments (tonnage, dormancy, non-production)  April 30, 2014 – Last day for “opt –out” permitees to obtain approval of “full cost bonding” revisions”.

Long Term Treatment (LTT) Reclamation liabilities for substandard water discharges are subject to financial assurance requirements of SMCRA and KRS 350. LTT liabilities not covered by KRGF Departmental policy Bond amount equal to the annual cost of treatment times 20.

Current LTT Requirements 20 Year bond requirement now in regulation 405 KAR 10:015 Section 8(7)(a). DNR updated and maintains LTT list Procedures to determine LTT: if an SS discharge is noted: – One time discharge is not a trigger – Permittee revises permit Either demonstrate land reclamation will abate the SS discharge or, Identify the treatment method for the discharge along with a cost estimate for the annual cost of treatment

LTT Bond The annual cost of treatment is subject to verification and modification by the DNR LTT Bond Amount: 20x(annual cost of treatment)=bond amount Consequences for failure to post LTT bond

Trend Stations Phases I and II complete. Phase III underway. Monitoring 133 trend stations (phases I and II combined). Phases I-III under grant from OSM. Phase I results on DNR website. Phase II posted in near future. DNR purchasing statistical software to conduct in-depth analyses of data. Work closely with DEP to identify watersheds of concern.