Master Clock for IceCube October 21, 2003 Contributors: Jerry Przybylski, Kalle Sulanke, Dave Nygren, Chuck McParland, Bob Stokstad Lawrence Berkeley National.

Slides:



Advertisements
Similar presentations
GPS & GIS – An Introduction. Where Will This Take Us? What is GPS? What is GIS? How do GPS and GIS work? How will they help us? ? Find This!
Advertisements

XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
XFEL C+C HARDWARE : REQUIREMENTS 1) To receive, process and store Timing Signals from TR ( Timing Receiver ) in same crate : - 5 MHz Bunch CLOCK - Bunch.
Time Calibration Tests Results using a waveform template Cross-talk measurements Stub asymmetry results Kalle Sulanke David Hardtke Bob Stokstad.
World with Out GPS Sep GPS – Global Position System The GPS System Sends Data via Satellites : – 1PPS Clock Based on Atomic, at 10^ -12 Accuracy.
GPSDO and Ruggedized Timing Products
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Max-Planck-Institut für Gravitationsphysik - Albert-Einstein-Institut DC Meeting Golm - Karsten Kötter1 Current status of DAQ System
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Summary of Research on Time-to-Digital Converters Summer Exchange Program 2008 Istituto Nazionale di Fisica Nucleare Rome, Italy Creative Studies Honors.
Clock Distribution for IceCube Gerald. Przybylski Lawrence Berkeley National Laboratory, Design Review, September 16, 2005
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/15/2012OVSA Preliminary Design Review Meeting.
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
G D The Initial LIGO Timing System Nearly Fatally Flawed CDS Meeting, January 30, 2008 Daniel Sigg, LIGO Hanford Observatory.
1 Development of Any Frequency Fire Rate SLR Control System Cunbo FAN, Xue DONG, Xingwei HAN, You ZHAO Changchun Observatory, , China.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
Additional RF system issues: Amplifier linearization Reference Phase distribution Master Clock Anders J Johansson Lund University.
Universal Frequency Reference Presented first at Gippstech 2012 V1.11 Glen English VK1XX
Augstas stabilitātes GPS pieskaņojamās atbalsta frekvences ģeneratora moduļa izstrāde un izpēte Projekta zinātniskais vadītājs Dr.hab.sc.comp. Jurijs Artjuhs.
15 Sep 2006 IVS VLBI2010 Haystack0 It’s About Time !!!!!
Proposal to increase the credibility of LIGO timing using atomic clocks and an optical fiber based time distribution system Proposal to increase the credibility.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
Clock Distribution for IceCube June 8, 2004 Lawerence Berkeley National Laboratory Gerald Przybylski GTPrzybylski LBNL 10/13/2003.
Review, May 5, 2004Lawrence Berkeley National Laboratory DOM MB Hardware CDR and PRR, May 5, 2004 Gerald Przybylski Lawrence Berkeley National Laboratory.
IceCube System Testing
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
DAQ Hardware status - overview R. Stokstad DOM Main Board –Schedule (Minor) –Design (Przybylski) –Firmware (Stezelberger) –Testing (Goldschmidt) DOR Board.
Differential eLoran Reference Station for Maritime and Precise Time Applications Gerard Offermans, Arthur Helwig, Reelektronika NL International Loran.
Report From the U.S. Naval Observatory Dr. Demetrios Matsakis CGSIC Timing Session September 22, 2009.
GPS based time synchronization of PC hardware Antti Gröhn
Traceability and Legal Metrology
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Pinger project 2008/09 Delia Tosi IceCube – Acoustic Neutrino Detection working group September 16 th, 2008 IceCube Collaboration Meeting Utrecht, Netherlands.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
DOM MB Status October 14, 2003 Gerald Przybylski Lawerence Berkeley National Laboratory GTPrzybylski 20/14/03 LBNL.
National Time Service Center. CAS Time Standard and Ensemble Pulsar Time Scale Ding Chen, George & Bill, Dick, PPTA team 2011 年 5 月 9 日, Beijing.
1 Timing with loran Judah Levine Time and Frequency Division NIST/Boulder (303)
Global Time in Distributed Real-Time Systems Dr. Konstantinos Tatas.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
G D The LIGO Timing System LSC Seminar, May 23, 2003 Daniel Sigg.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
KHz-SLR PC Board Eastbourne, October 2005 for kHz SLR Complete PC Board.
IceCube Software System Design Methodology DAQ S/W Workshop 28 Oct 2002 John Cavin.
DAQ: Status and Plans David Nygren Berkeley Collaboration Meeting March 21, 2005.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
DAQ Hardware status - overview R. Stokstad DOM Main Board –Schedule (Minor) –Design (Przybylski) –Firmware (Stezelberger) –Testing (Goldschmidt) DOR Board.
DOM Main PCB Testing Gerald Przybylski October 23, 2002 Lawrence Berkeley National Laboratory.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Kenneth Johnston US Naval Observatory Presented by Jules McNeff International Committee on GNSS Provider’s Forum Bangalore, India 4 September 2007 GPS.
Precision Measurements with the EVERGROW Traffic Observatory Péter Hága István Csabai.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
The Use of GPS Disciplined Oscillators as Primary Frequency Standards for Calibration Laboratories NCSLI – August 2008 Michael Lombardi National Institute.
Timing applications of GPS Time for GPS Vivekanandanmurugan Sivaraman Gaurav Sharma John Hannah.
CTA Trigger and Integration Meeting, HU Berlin, /25/2016K.-H. Sulanke, DESY1 A Digital Trigger for CTA Cameras K.-H. Sulanke DESY.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
IceCube System Testing
L0TP studies Clock and distribution Scheme Busy handling
WP02 PRR: Master Oscillator and RF Reference Distribution
Fiber Based Synchronous Timing System
PDR of Master Oscillator
Presentation transcript:

Master Clock for IceCube October 21, 2003 Contributors: Jerry Przybylski, Kalle Sulanke, Dave Nygren, Chuck McParland, Bob Stokstad Lawrence Berkeley National Laboratory GTPrzybylski LBNL 10/13/2003

Master Clock Unit (MCU) Status Draft Requirements Document exists now! –Needs more work, will be available soon... The MCU has some conceptual subtlety –Religious debates in progress. Specific Implementation proposals have been made by Sulanke and Przybylski. Working plan is that Sulanke will design and fabricate this subsystem at DESY.

Master Clock Unit: Major Goals Create and distribute stable 20 MHz source to all DOM Hubs in IceCube DAQ. –DOR cards mirror MCU time, calibrate DOMs Link “IceCube Time” to GPS time. –Question: Does IceCube Time  GPS time? Provide robust real-time time verification. –Motivation: detect any error condition in less than 1 sec

Accuracy and Precision GPS satellites are synchronized to the US Naval Observatory. The USNO atomic clocks maintain time to < 2x day -1. GPS stability degraded to ~4x10 -8 second -1 by triangulation errors. DOM local clocks will display < 1 x second -1.  GPS much less stable than DOM local clocks (seconds scale) However, GPS will display better long-term stability (hours scale)  Master Clock unit must employ a source with better short-term stability than GPS, yet must still match long-term GPS time.  Use commercial atomic clock “linked” to GPS over long-term

A Commercial Atomic Clock Stanford Research Systems PRS-10 Cost: ~$1500 High phase-stability quartz oscillator Short-term phase-stability: ~5 x Atomic Rubidium for long time-scale Can be “disciplined” to follow GPS (long- term) if the 1 Hz GPS signal is available.

Rubidium Oscillator Allan Variance Figure from GTPrzybylski LBNL 10/13/2003

System: Top Level GPS Clock 1 pps ASCII time value string DOM Hub SRS PRS MHz PLL Fan Out Accurate to ± 40ns 1pps 20 MHz 3-Twisted Pairs (20 Mhz, 1pps, RS-232) Slaved Rubidium Oscillator <1x jitter Naval Observatory (1.2E-15 drift) 10 MHz Drivers Master Clock Unit GTPrzybylski LBNL 10/13/2003

Inside the DOM Hub DOR card DSB Card CPU From Master Clock Unit 20 MHz (Twisted Pair) 1 Pulse per Second (Twisted Pair) RS-232 Time String (Twisted Pair) 20 MHz, 1 pps. Time String Time String Power Supplies Fans Monitors (Possibly Diskless) GTPrzybylski LBNL 10/13/2003

DSB (DOM hub Service Board - KHS)

Some System Requirements The DOM Hub shall be capable of stand- alone operation, ( use the DSB 20 MHz clock ) –This facilitates many testing activities The IceCube MCU shall be capable of full operation in the absence of GPS data –Could happen, …. IceCube MCU operation shall not require that all DOM Hubs are operational. –Independence of strings during commissioning.

MCU Summary Important to define this subsystem now. –Physics input necessary for requirements. –MCU will be needed for string test at UW. Short term goals: –Requirements Document circulated to Tech board by 15 November 2003 for review. –Requirements Document approved by PO, and accepted by engineering and physics team...