Have you silenced your cell phone? 1 2 Job Order Contract Informational Meeting Presented By: City of Bellevue and The Gordian Group April 15, 2010 City.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

MASBO February Information to purchase Services Information to purchase Construction.
Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Ch-2 Proposals and Contracts. Introduction Many issues have to be handled in a contract and a proposal including legal concerns, commercial arrangements.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
1 1 Dr. Mark Stewart, Camden County Schools Steve Adams, Johnson-Laux Construction Jon Held, Georgia ezIQC SWC Project Manager Willie Moon, DOAS Contract.
JOB ORDER CONTRACTING CONTRACT MANAGEMENT DEPARTMENT August 12, 2013 BROWN BAG 1.
Job Order Contracting Presented by the Center for Job Order Contracting Excellence.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Job Order Contracting ( JOC) Chicago Department of Aviation Capital Improvement Program Panel member: Joseph S. Dote, Sr. Vice President R.M. Chin & Associates,
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
Project Close Out CTC-470.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
2013 JOB ORDER CONTRACTING CONTRACT MANAGEMENT DEPARTMENT 8/3/2015 CONTRACT KICKOFF Solicitation CLMB312 January 3, 2013.
Construction Engineering 221 Drawings and Specifications.
EM15 – Contractors COST MANAGEMENT
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Copyright © 2007 The Gordian Group, Inc., all rights reserved Page 1 Job Order Contracting A State of the Art Procurement Tool Charles Crane Mike Shiplet.
Genesis Solar Module Brochure ™
Job Order Contracting A Washington State Procurement Option
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.
Is Your JOC Program Audit Worthy? z Scott Creekmore.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Copyright © 2010 The Gordian Group, Inc., all rights reserved THE JOB ORDER CONTRACTING PROCUREMENT SYSTEM JOC Informational Seminar City of Chicago Department.
WELCOME! SBE Boot Camp JOB ORDER CONTRACTING (JOC) CHRISTY GUZMAN JOC Program GAYANE STEPANYAN JOC Program September 30,
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
Pre-Proposal Conference Welcome! New York State Department of Transportation Conference Room A/B 50 Wolf Road May 30, :00 PM to 3:30 PM JOB ORDER.
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Doing Business With the U of I Facilities and Services Construction Division Overview of Construction Programs and Contracting Processes Gary Biehl, Assoc.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
eziqc INFORMATIONAL SEMINAR
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Job Order Contracting (JOC)
(Additional materials)
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Informational Seminar
Designers’ Manual Overview and Chapter Contents
Request for Proposal & Proposal
PROJECT DELIVERY METHODS
Job Order Contracting:
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
Presentation transcript:

Have you silenced your cell phone? 1

2 Job Order Contract Informational Meeting Presented By: City of Bellevue and The Gordian Group April 15, 2010 City of Bellevue

3 Introduction Overview of Work RFP Schedule Explanation of Job Order Contracting (JOC) JOC Program Details How to propose on JOC Adjustment Factor Details Rewards Agenda

Introduction The Gordian Group Since 1990, Gordian has served facility owners from every sector with the mission of providing the solution that best fits their needs and goals. Since our inception, providing JOC solutions has been and continues to be our only business, and we continue to refine our solutions and processes to help our clients maximize efficiency, optimize cost savings, and increase construction quality. We are not a contractor. 4

5 The City of Bellevue is anticipating the advertisement of an ~ Annual JOC Contract at the end of April Small to Medium Size Projects will Be Issued Under the Job Order Contracting Program Work Will Be Administered Through the City of Bellevue’s Purchasing Department with individual departments running projects The Gordian Group Supports The City of Bellevue and the successful JOC contractor Introduction

RCW’s The City of Bellevue’s JOC is in accordance with RCW Which Public Bodies May use JOC RCW Contract award process RCW Contract Requirements RCW Work Orders RCW Required information to board RCW Protection of trade Secrets 6

7 Potential Project Locations Include: Any of the City’s Facilities or Property whether located within the city limits or not. Project Types May Include: Office Renovations Park Improvements HVAC Roofing Department of transportation projects Projected Size Of Projects Project Range ~ $10k - $300K Overview of Work

8 Anticipated Schedule Advertise Contracts End of April Pre-Proposal Meeting First week in May RFP Submission Middle of May Contract Award June City Council Meeting Contract NTP & First Job Order End of June

9 What is Job Order Contracting? A Job Order Contract is a Firm, Fixed Priced, Competitively Bid, Indefinite Quantity Contract JOC is Designed to Accomplish Small-Medium Size, Multi-trade, Minor Construction, Repair and Remodel Projects JOC is a Series Of Individual Projects Issued as Job Orders Under the Base Contract JOC is just another tool in the tool box Over 2000 job order contracts are currently in use

10 Why Job Order Contracting? Limited Options for Completing Small-Medium Size Construction Projects Traditional System Can Be Slow and Costly 6-18 Months From Project Identification to Final Design to Award of Contract Process Can Be Costly Relative to Project Size Owner and Contractor Can Have Opposing Roles JOC Offers a Cost Effective Alternative to the Traditional System Significant time savings - upwards of 90% Lower overall construction costs of an estimated 8% to 15% Higher quality work Virtual elimination of change orders, claims, defaults and terminations Greater control over contractors whose future hiring is dependent upon job outcomes Increased transparency at all levels Enables agencies to more effectively manage multiple construction locations from a single vantage point through the use of web based software and administration

11 Why Job Order Contracting? JOC Process: 3 to 5 Weeks Months Months 2 – 4 Months 1 Month Weeks 1 Week

12 JOC Contract Documents CONSTRUCTION TASK CATALOG (CTC) Catalog of Pre-Priced Construction Tasks Organized by CSI Format Prices Contain Local Prevailing Wages, Material and Equipment Costs Only Customized for Anchorage School District

13 JOC Contract Documents Technical Specifications Based on Master Specs and modified for City of Bellevue Specifies Quality of Materials and Workmanship Organized by CSI Format Specifications Linked to Tasks in CTC WSDOT

14 JOC Contract Documents Project Manual Proposal Requirements Request for Proposal Instruction to Officers Bid Form Contract Requirements Bonds/Insurance General Conditions Supplemental Conditions Agreement JOC Specific Clauses Overview of Contract Procedure for Ordering Work Proposal Preparation Issuing Work Changes to Standard Clauses Scope of Work Extra Work Time Extensions Liquidated Damages Substantial Completion

15 Bidding Structure Establish a fixed initial term Two years Includes option to extend one year Establish a guaranteed minimum dollar value Some nominal amount - typically $25,000 Establish an estimated contract value Represents the expected amount of work to be accomplished Based on budget Prior to proposal offering The City of Bellevue does not: Identify or commit to any specific project or location Identify or commit to any specific quantities or tasks in the catalog of construction tasks

16 Bid Requirements Part I Technical Qualifications Part II Competitive Bid Adjustment Factors Normal Working Hours Other-Than-Normal Working Hours A typical adjustment factor might be 1.10 or 1.20 Adjustment Factors Apply to All Tasks in the CTC Adjustment Factors Must Include all Indirect Costs and Profit Adjustment Factors Fixed for the Duration of Contract Term

17 JOC Program Details Provide Bid Bond Performance and Payment Bond Insurance Requirements General Liability, Automobile, Etc., for overall contract Additional Insured or Special Insurance on a Job Order Basis Differing Site Conditions Treated as Additional Job Order Contractor Cannot Refuse Job Orders

18 Adjustment Factor Details Adjustment Factor Includes: Overhead, Profit, Subcontractor Costs, Mobilization, Site Supervision … Overhead Costs Include: Scoping, Proposal Development, Site Supervision and Management, Bonds, Insurance, Vehicles, Home Office Support

19 JOC Execution Procedures Joint Scope Walk - Develop Scope of Work The City Issues Request for Job Proposal/ Detailed Scope of Work Contractor Develops Proposal Selects Tasks and Estimates Quantities Prepares Incidental Drawings Develops Schedule & Subcontractor List The City Reviews and Approves Contractor’s Proposal The City Issues Lump Sum Job Order Average duration from Joint Scope to issuance of Job Order is ~ 28 days

20 CTC Structure CTC Is Divided in accordance with the 2004 CSI Master format. Unit Prices Are For Installed Or Demolished Work Some Unit Prices Have Modifiers Which Qualify The Task And Alter The Unit Price Quantity Adjustments Position Of Work (In Crawl Space) Associated Items Owner Supplied Material

21 CTC Structure Each Task Is Listed Only Once And Positioned Where It Is First Mentioned Many Selective Demolition Items Are In Site work Concrete Walks In Site work Not Concrete Assembly Vs. Component Prices Always Use Assembly Costs Were Applicable: Concrete Walks, Concrete Slabs, Sprinkler Systems, Wall Systems, Roofing, Asbestos, Etc…. Read Section And Notes For Description Of Items Included In Price Painting Prices Include: Prep Work, Cutting In, Taping, Floor Protection, Etc.

22 Analyzing the Construction Task Catalog Most Used Method Develop A Representative Project Get Sub Quotes Price From The CTC Add On Overhead And Profit Other Methods Evaluate A Sampling Of The Anticipated Items Get Subs To Evaluate Their Section Of The Book Do Not Rely Upon Evaluations Of Other CTC’s

23 Analyzing the Construction Task Catalog Preferred Method Learn All You Can About The Type Of Work That The City Performs Volume Of Work Size Of Projects Select A Representative Completed Project Preferably Previously Done For The City of Bellevue Price Project From CTC Calculate The Adjustment Factor

24 Calculating the AF - Scope

25 Calculating the AF - Price Proposal

26 Calculating the AF - Price Proposal

27 Price (From The CTC) –VCT Tile $ 2, –Chalkboard/Tack board$ 1, –Doors And Hardware$ 2, –Fluorescent Fixtures$ 1, –Finishes$ 5, –Total =$ 13, Actual Direct Costs (Sub Or In-house) –VCT Tile$ 3, –Chalkboard/Tack board $ 1, –Doors And Hardware$ 2, –Fluorescent Fixtures$ 1, –Finishes$ 4, –Total =$ 14, CTC Value = 13, / 14,230.70= This Means The CTC Provides Only 95.67% Of Your Direct Costs Calculating the AF

28 Calculating the AF - Overhead Overhead Costs - 8% to 12% Scoping Proposal Development Site Supervision and Management Bonds Insurance Vehicles Home Office Support Communications A/E Services

29 Calculating the AF COST Direct Cost =$ 14, % =$ 1, % (of Direct Cost) =$ TOTAL $ 16, CTC PRICE $ 13, (16, / 13, = ) ADJUSTMENT FACTOR =

30 Calculating the AF - Line 1.Daytime Hours Adjustment Factor Line 2. Multiply Line 1 by 70% Line 3.Nighttime Hours Adjustment Factor Line 4. Multiply Line 3 by 20% Line 5.Premium Hours Adjustment Factor Line 6. Multiply Line 5 by 10% Line 7.Add Lines 2 and 4 and 6 (This is the Award Criteria Figure) ACF =

31 The Rewards JOC Can Be Profitable Proportional To Contractor’s Performance Depends On Steady Flow Of Work Continuing Relationship Partnership Don’t Have To Chase Work Professionally Rewarding Partner In Project Development Opportunity To Apply Construction Expertise

32 Questions?

33 Thank You