SJD / TAB1 Fiber Tasks Preliminary Design Review December 5, 2001.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Data Communications and Networking
Design and Realization of HF Station Prototype
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
SONET / SDH Nirmala Shenoy Information Technology Department
Emulatore di Protocolli di Routing per reti Ad-hoc Alessandra Giovanardi DI – Università di Ferrara Pattern Project Area 3: Problematiche di instradamento.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
Chapter 6 Errors, Error Detection, and Error Control
EE 230: Optical Fiber Communication Lecture 17 From the movie Warriors of the Net System Considerations.
COE 341: Data & Computer Communications (T062) Dr. Marwan Abu-Amara
1 Storing Digital Audio. 2 Storage  There are many different types of storage medium and encoding methods for the storage of digital audio  CD  DVD.
Chapter 5 Link Layer slides are modified from J. Kurose & K. Ross CPE 400 / 600 Computer Communication Networks Lecture 20.
Network Data Organizational Communications and Technologies Prithvi N. Rao Carnegie Mellon University Web:
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
Chapter 6 Errors, Error Detection, and Error Control
COE 341: Data & Computer Communications (T061) Dr. Marwan Abu-Amara Chapter 8: Multiplexing.
1/26 Chapter 6 Digital Data Communication Techniques.
EVLA Fiber Selection Critical Design Review December 5, 2001.
Loran Integrity Performance Panel Integrity Fault Tree for Loran Sherman Lo Second LORIPP Meeting Portland, OR September 23-24, 2002.
Transition Converter " Supply signals from new antennas to old correlator. " Will be discarded or abandoned in place when old correlator is turned off.
Introduction 1 Lecture 23 Link Layer (Error Detection/Correction) slides are modified from J. Kurose & K. Ross University of Nevada – Reno Computer Science.
5: DataLink Layer5-1 Chapter 5 Link Layer and LANs Part 1: Overview of the Data Link layer Computer Networking: A Top Down Approach 6 th edition Jim Kurose,
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Data and Computer Communications Chapter 8 – Multiplexing
5 - 8 January 2009National Radio Science Meetings1 The ALMA Data Transmission System – Digital Portion Chris Langley ALMA Back End Integrated Product Team.
CE 4228 DATA COMMUNICATIONS AND NETWORKING Introduction.
Control Building Fiber Preliminary Design Review December 5, 2001.
SJD/TAB1 EVLA Fiber Selection Critical Design Review December 5, 2001.
1 Networks and Telecommunications. 2 Applying Telecommunications in Business TELECOMMUNICATIONS – the transmission of data between devices in different.
Application of All-Optical Signal Regeneration Technology to Next-Generation Network (NGN) Mikio Yagi, Shiro Ryu (1), and Shoichiro Asano (2) 1: Laboratories,
CS 640: Introduction to Computer Networks Aditya Akella Lecture 5 - Encoding and Data Link Basics.
Page 2 Small confidentiality text on every page, Arial 10pt, white – Change on MASTER PAGE ONLY Understanding DWDM.
Data and Computer Communications
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
14-15 May,2002 EVLA Correlator Backend Functional Design Tom Morgan 1 Backend Preliminary Functional Design.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
A Power Independent Detection (PID) Method for Ultra Wide Band Impulse Radio Networks Alaeddine EL-FAWAL Joint work with Jean-Yves Le Boudec UWB4SN 2005:
1 Data Link Layer Lecture 20 Imran Ahmed University of Management & Technology.
James Robnett EVLA M&C Hardware PDR March EVLA M&C Hardware PDR Voice Communications.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
CHAPTER 2 HARDWARE BUILDING BLOCK ENCODING FRAMING ERROR DETECTION.
Pulse Code Modulation (PCM)
Data and Computer Communications Chapter 6 – Digital Data Communications Techniques.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, EVLA MONITOR AND CONTROL HARDWARE REQUIREMENTS.
Data Communications & Computer Networks, Second Edition1 Chapter 6 Errors, Error Detection, and Error Control.
5: DataLink Layer5-1 Chapter 5 Link Layer and LANs Computer Networking: A Top Down Approach Featuring the Internet, 3 rd edition. Jim Kurose, Keith Ross.
Software Three Main Functions Records/Monitors Zero Detection Points Gives our PWM a starting point Data used to dynamically adjust carrier frequency Detects.
Chapter 5 Link Layer Computer Networking: A Top Down Approach 6 th edition Jim Kurose, Keith Ross Addison-Wesley March 2012 Link Layer introduction,
Data Link and Flow Control Networks and Protocols Prepared by: TGK First Prepared on: Last Modified on: Quality checked by: Copyright 2009 Asia Pacific.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M35 Avanex lead Description of Work –Establish test bed suitable to validated the optical.
FUNDAMENTALS OF NETWORKING
Issues of the Synchronous Digital Hierarchy
Adam Marmbrant Samuel Silverstein Stockholm University Link Test Status.
Data and Computer Communications by William Stallings Eighth Edition Networks and Communication Department 1 Multiplexing Click to edit Master subtitle.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M41(tbc) CIP now lead Description of Work –Establish test bed suitable to validated the.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Future LBO Developments
EVLA Advisory Committee Meeting System Status
Link Layer and LANs Its not about how hard you hit... It's about how hard you can get hit and keep moving forward 5: DataLink Layer.
EVLA M/C Software PDR, 14 May 2002
BESIII EMC electronics
DAQ Racks, Bins and Modules Internal Design Review
UWB Receiver Algorithm
Data Transmission System Digital Design Chris Langley NRAO
Device test stations Multi-probe electrical DC injection and optical input/output Near-field measurement Analogue characteristics 1) 50GHz Network analyzer,
EVLA Advisory Panel Mtg. System Overview
Data Link Layer: Overview; Error Detection
Presentation transcript:

SJD / TAB1 Fiber Tasks Preliminary Design Review December 5, 2001

SJD / TAB2 CB Main Distribution Frame

SJD / TAB3 Patch Panels Similar to Termination Panel Located throughout the Control building

SJD / TAB4 Phone System Two phones per antennas, –Vertex room and Pedestal Phone numbers remain with the antenna Will use the fiber system Will use COTS hardware Responsible for providing the Fiber from the Termination panel to Phone Room

SJD / TAB5 Battery Backed-up Communication Similar to VLA WYE Monitor Un-interruptible power supply

SJD / TAB6 MCB Network Standard Ethernet ( two Fibers ) COTS Network Router 1 Gbit/s to antennas 100 Mbit/s in the antennas Support ~48 nodes in each antenna –Two multi-mode fibers per node –Fiber to the Module Patch Panel will be located in the computer room

SJD / TAB7 LO System Responsible for Lasers, Modulators, Fiber, Circulators, Receivers –Maybe integrated into the LO module –Phase stable system LO Patch panel –located in the Electronics Room –Fiber test equipment System Self-tests included

SJD / TAB8 IF System Transmitters MUX-Fiber-DeMUX components Fiber Amplifiers Receivers Online monitoring

SJD / TAB9 IF Transmitters Twelve Lasers – ITU spacing Automated Test –Output Power Measured at Each Laser ( 1% tap) –MCB accessible Manual Optical Power Measurements –Can be measured at the MUX output

SJD / TAB10 IF Patch Panel Located in the Correlator room Includes De-MUX hardware Includes Fiber Amplifiers Manual Test Equipment –Full Signal Communication Analyzer

SJD / TAB11 Rack Mount EDFA MCB adjusted Gain of each amplifier Also measures in/out optical power

SJD / TAB12 IF Communication Analyzer IF Patch Panel –Manual measurements during reconfiguration Complete Diagnostic –Jitter –Q Factor –Noise Margin –Rise / Fall times

SJD / TAB13 IF System On Board Tests Test Patterns Generated at each Transmitter Nine Test Patterns –No Sync, alternating 1/0, all Ones, all Zeros –Parity Errors MCB controlled

SJD / TAB14 Proposed Frame Format EVLA Memo #33

SJD / TAB15 Divided Sync Word Required to Identify Correct 1/2 Sequence 10 Bits long, –6 bit identify Start-of-Frame –Barker Sequence - equal Ones versus Zeros Three Stage Synchronization Process

SJD / TAB16 Sync Implementation

SJD / TAB17 Three Stage Synchronization Stage 1 - Search bits for frame pattern Stage 2 – Monitor for “Correct” sync Stage 3 – If two “Bad” frames in a row or 2-out-of-8 fames are “Bad” Then Start Search Again

SJD / TAB18 Timing Signals Metaframe Index Metaframe Sequence Count 1 PPS 1 Pulse per 10 seconds

SJD / TAB19 Data Valid Signal Initiated at the antenna –Toggle Switch –MCB controlled Passed to correlator

SJD / TAB20 Check Sum - BER Each 19 bits Generate a check Sum Provides continuous Bit-Error-Rate Performance Monitoring Only odd # of errors per 19 bits Detected Flags Correlator when over threshold

SJD / TAB21 Scrambling Frame Synchronous Scrambling –Select pattern is modulo 2 added –Entire frame – except sync bits Pattern results in –Equal number of Ones/Zeros providing Balance ac content, sufficient transitions Minimize low frequency content

SJD / TAB22 Conclusion Five systems will be supported On Board Tests Incorporated ( MCB) Patch Panels will have test equipment IF Data Format will support Growth

SJD / TAB23 Next Topic

SJD / TAB24 IF Signal Path