IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC

Slides:



Advertisements
Similar presentations
NISTs Role in Securing Health Information AMA-IEEE Medical Technology Conference on Individualized Healthcare Kevin Stine, Information Security Specialist.
Advertisements

“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
NAESB REQ.21 Update Dr. Martin J. Burns, Hypertek Inc. for NIST February 21, 2014.
Conformity Assessment Practical Implications InterAgency Committee on Standards Policy June 2007 Gordon Gillerman Conformity Assessment Advisor Homeland.
Cyber Security Working Group March 17, Smart Grid Cyber Security Strategy Establishment of a Cyber Security Coordination Task Group (CSCTG) Established.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Geneva, Switzerland, 4 December 2014 ITU-T Study Group 17 activities in the context of digital financial services and inclusion: Security and Identity.
Security Conformity March 10, 2011 SF Bay Area. Agenda for Thursday, March 10th Discuss Security Testing & Certification Authority Review Security Testing.
Agenda Review homework Final Exam requirments ISO 9000 Baldridge
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
SGTCC END TO END TESTING INITIATIVE APEC-ISGAN Smart Grid Test Bed Network Workshop Washington, DC -- January 24, 2012 Rik Drummond, Dean Prochaska, Rudi.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
John McDonald 05 November 2013 SGIP Members Meeting.
© 2011 EnerNex. All Rights Reserved. UCAIug OSG Conformity Meeting.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
© 2008 GS1 1 Certification Framework Certification Framework Document Operations Manual Team 7: Deliverables.
Facility Smart Grid Information Model
Update on the NIST Smart Grid Standardization Efforts Nada Golmie National Institute of Standards and Technology November 16, 2009.
Keeping the Lights On: Strategies for Compatibility and Interoperability in Electrical Power Networks seminar October 27, 2011 Presented by Don Heirman.
WHY CONFORMITY ASSESSMENT?. What is conformity assessment?  Conformity assessment is the name given to processes that are used to demonstrate that a.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
HIT Standards Committee Privacy and Security Workgroup: Initial Reactions Dixie Baker, SAIC Steven Findlay, Consumers Union June 23, 2009.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Bootcamp – Network Interoperability] Date Submitted: [February.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
© 2011 EnerNex. All Rights Reserved. UCAIug Testing Subcommittee Activities.
HIT Standards Committee Identifying Implementation Specifications & Gaps LeRoy Jones – Program Manager Healthcare Information Technology Standards Panel.
Boot Camp - Conformity July 19, 2010 Detroit, USA.
6 January 2016Conformity Boot Camp1 Boot Camp Edge / Enterprise Conformity.
SMART GRID INTERNATIONAL COOPERATION IRVING, TEXAS  7 DECEMBER 2012 SMART GRID INTEROPERABILITY PANEL US SGIP and Korea SGSF Joint Smart Grid Workshop.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright September 21, 2011
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 SMART GRID TESTING & CERTIFICATION COMMITTEE GENERAL MEETING.
OpenSG SG Conformity – Security Conformity July 22, 2010 Bobby Brown.
© 2010 EnerNex Corporation. All Rights Reserved. SGIP TCC / OSG Cooperation Presented By: Erich Gunther EnerNex Corporation 2010.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Jeju, 13 – 16 May 2013Standards for Shared ICT Smart Grids activities in ETSI Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO) Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.
2002 ANSI Annual Conference The Value of Accreditation Robert H. King Jr. President and CEO, RAB.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Testing Technical Committee Paris, France August 24, 2010
President, Don HEIRMAN Consultants
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
ISO 9000.
Overview of ISO 9001:2015 –Quality Management SysteM
What are ISO 9000 Standards? ISO 9000 Standards
Need for ISO 9000 & other Q Systems Swamynathan.S.M AP/ECE/SNSCT
Vertical Applications TAG
Smart Grid Interoperability Standards
Agenda Review homework Final Exam requirments ISO 9000 Baldridge
Vertical Applications TAG
Boot Camp - Conformity March 7, 2011 SF Bay Area.
Smart Grids activities in ETSI
IEEE-SA Smart Grid.
ACCREDITATION PROCESS
ISO 9001:2000 Awareness Training
Wayne Zeuch, GTSC-6 Chair Nicole Butler, ATIS Staff
NIST Framework and Roadmap for 5
Presentation transcript:

IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC

Whatis SGTCC? What is SGTCC? The Smart Grid Testing & Certification Committee (SGTCC) is a standing committee of the Smart Grid Interoperability Panel (SGIP) SGTCC has developed a framework to enable industry testing and certification programs for Smart Grid interoperability Zahra Makoui, PG&E March 2011

Goalsof the IPRM Increase the buyer’s confidence in the purchase of certified interoperable products for their organizations Standardize the testing and certification processes, through an initial set of best practices, across multiple standards ensuring more consistent and quality interoperable products within the Smart Grid at large Implement a formal approval process for those organizations following the SGTCC Testing and Certification Framework to assure the purchasing organizations of quality, audited testing programs Support end users purchasing Smart Grid products based on standards to reduce costs and shorten product implementation cycle time Zahra Makoui, PG&E March 2011

Zahra Makoui, PG&ESlide 4 What is IPRM? The Interoperability Process Reference Manual (IPRM) is the primary document defining the framework for Smart Grid testing and certification Provides guidelines on how to build conformity program increasing confidence in products interoperability What are basic assumptions of IPRM? (a) ITCA exists overseeing and administering program (b) "Certification Body" exists to certify products (ISO guide 65) (c) Testing laboratories exist to test products (ISO 17025)

KeyIPRMTopics Best Practices for Interoperability Test Construction Criteria for certification body process quality Criteria for test laboratory best practices Best Practices for Cyber Security Test Construction Zahra Makoui, PG&E March 2011

Zahra Makoui, PG&ESlide 6 How does it affect us? Products/services incorporating OSG recommendations will need ITCA What's been done to date? NIST has sponsored document creation for UCA Conformance upgrade to ITCA. s_as_NIST_SGIP_ITCA/ NIST asking us to identify gaps in ITCAs: HAN end to end testing (simulating registration to an ESI) HAN business interoperability (Texas Common Portal) HAN Performance Testing AMI Enterprise? OpenADE? Others?