Dry Etch and Thin films & Process Integration June 30th, 2015.

Slides:



Advertisements
Similar presentations
MICROELECTROMECHANICAL SYSTEMS ( MEMS )
Advertisements

Anelva Sputter PECVD DRIE. Anelva Sputter PECVD DRIE.
Dry Etch and Thin films & Process Integration August 26, 2014 NNfC monthly admin committee meeting.
Dry Etch and Thin films & Process Integration Jan 6th, 2015 NNfC monthly admin committee meeting.
Cleanroom committee neeting Jan 2014 Vijayaraghavan.
MetalMUMPs Process Flow
NOVEL PROCESSES FOR SOI-BASED MEMS AT VTT
C. Hibert, EPFL-CMICMI-Comlab revue, june 4th, 2002 Dry etching in MEMS fabrication by Cyrille Hibert in charge of etching activities in CMI clean room.
MEMS Cell Adhesion Device Andrea Ho Mark Locascio Owen Loh Lapo Mori December 1, 2006.
Process integration
Sample Devices for NAIL Thermal Imaging and Nanowire Projects Design and Fabrication Mead Mišić Selim Ünlü.
Bulk MEMS 2013, Part 2
The Deposition Process
NIST Nanofabrication Facility. CNST Nanofab A state-of-the-art shared-use facility for the fabrication and measurement of nanostructures –19,000 sq ft.
MEMs Fabrication Alek Mintz 22 April 2015 Abstract
Surface micromachining
1 ME 381R Fall 2003 Micro-Nano Scale Thermal-Fluid Science and Technology Lecture 18: Introduction to MEMS Dr. Li Shi Department of Mechanical Engineering.
ES 176/276 – Section # 2 – 09/19/2011 Brief Overview from Section #1 MEMS = MicroElectroMechanical Systems Micron-scale devices which transduce an environmental.
McGill Nanotools Microfabrication Processes
Surface MEMS 2014 Part 1
An Inductively Coupled Plasma Etcher
UGIM 2014 Highlights Significant international participation – Mexico, Canada, Denmark, Australia, India, UK. - Large contingent from Australian National.
Manufacturing Process
Nano/Micro Electro-Mechanical Systems (N/MEMS) Osama O. Awadelkarim Jefferson Science Fellow and Science Advisor U. S. Department of State & Professor.
Metallization: Contact to devices, interconnections between devices and to external Signal (V or I) intensity and speed (frequency response, delay)
Corial 200ML COSMA Software with:  Edit menu for process recipe edition,  Adjust menu for process optimizing,  Maintenance menus for complete equipment.
Dry Etch and Thin films & Process Integration April 28th, 2015 NNfC monthly admin committee meeting.
Corial 200 COSMA Software with:  Edit menu for process recipe edition,  Adjust menu for process optimizing,  Maintenance menus for complete equipment.
MVE MURI 99 Kick-off Meeting R. Barker, Technical Monitor Started 1 May 99 October 1999 Project Introduction and Motivation Millimeter-wave switches may.
Furnaces and Wet bench area Savitha P. Wet bench Currently has two wet benches – one exclusively for CMOS processes Two hours slots TMAH and KOH etching.
Top Down Manufacturing
NNfC Thin Films Update July DRIE – Chuck changed from 6 inch to 4 inch. Standard etch recipes tuned except for 15.0 um/min recipe needs to be tuned.
ITC-irst Researchers 217 Post docs 13 PhD students MM area FCS – Physics & Chemistry of Surfaces and Interfaces MIS – Microsystems IT area SRA –
Corial 300 COSMA Software with:  Edit menu for process recipe edition,  Adjust menu for process optimizing,  Maintenance menus for complete equipment.
VCSEL Fabrication Processing
1. Wafer clean 2. Thermal oxidation 3. PR coating and patterning, Mask #1 4. Wet BOE etching SiO2 Dry RIE etching low stress nitride 5. Positive resist.
Corial 200RL COSMA Software with:  Edit menu for process recipe edition,  Adjust menu for process optimizing,  Maintenance menus for complete equipment.
Fabrication Process for Micro Structures
Thin Film Deposition. Types of Thin Films Used in Semiconductor Processing Thermal Oxides Dielectric Layers Epitaxial Layers Polycrystalline Silicon Metal.
Plasma bay modernised in Sentech SI 500 RIE cluster Si 3 N 4, SiO 2, polySi and Al etching 2 x Oxford System 100 ICP Si 3 N 4, SiO 2, polySi, polymers,
AZ 9260 Characterization By: Timothy Kowalchik and Keeton Hodgson.
Process integration Wafer selection active role for the wafer ? passive role ? –thermal conductivity –optical transparency –flat,
MEMS 2016 Part 2 (Chapters 29 & 30)
(Chapters 29 & 30; good to refresh 20 & 21, too)
Chapter 5-1. Chemcal Etching.
Process integration 2: double sided processing, design rules, measurements
Process integration 1: cleaning, sheet resistance and resistors, thermal budget, front end
MEMS Two-Phase Vapor Escape Heat Exchanger
Process Flow for ESS5810 AMSF
Characterisation of the back-etched stack
Report from CNM activities
SCUBA-2 Detector Technology Development
ICP-RIE equipment for any chemistry
Corial 200R 11/17/2018 Simplicity, performance, and upgradability in a system designed for R&D environments RIE capabilities over a variety of materials.
MEMS Two-Phase Vapor Escape Heat Exchanger
Si DRIE APPLICATION In Corial 210IL.
Easy-to-use Reactive Ion Etching equipment
Processing for optical communication devices
Anisotropic RIE etching supported by a wide range of processes
DRIE APPLICATIONS In Corial 210IL.
Lecture #25 OUTLINE Device isolation methods Electrical contacts to Si
Industry-leading uniformity for etching a variety of materials
SiC trench etch for MOSFET application
Simple-to-use, manually-loaded batch RIE system
Easy-to-use Reactive Ion Etching equipment
SiC processing In Corial 200 series.
SiN processing for MEMS type probe card
Simple-to-use, manually-loaded batch RIE system
300 mm ICP-RIE equipment for high performances and low CoO
SILICON MICROMACHINING
Presentation transcript:

Dry Etch and Thin films & Process Integration June 30th, 2015

Dry Etch and Thin films June 30th, 2015

 RIE -Cl Tool is UP and running. No major issues for June. Awaiting AMC, tentative plan in Nov’15.  RIE-F Tool is UP and running. No major issues for June, AMC tentative Nov’15. LL robot handler scratches the 4” clamp plate intermittently.  Currently, a temporary solution where the height of the clamp plate has been lowered.  Awaiting AMC, where fine tuning needs to be done. Etch rate drift for nitride, suspect due to metal exposure on tool, embedded contamination.  Perform aggressive clean of ceramic parts with fine scotch brite and re-verify( awaiting vendor supply)  Liners to be used during the metal exposure process ( order process is ongoing).  DRIE Tool is UP and running. No major issues for June. Awaiting AMC, tentative plan by end July’15

 PECVD Tool is UP and running. No major issues, AMC tentative July 1 st week. Wet etch rate for oxide and nitride degraded,  suspect film quality, observe that showerhead holes are enlarged, heater table is not level, to be re-qualified after AMC ( expected, July 1 st week once parts are released from the Bangalore Customs).  a-Si optimization ongoing with some support from Oxford process engineers.  RF Sputter Techport Sputter 1(metal and dielectrics) is UP and running. Sputter 2( dielectrics) set up has been modified for the co-sputtering process.  Trial runs show good uniformity for all 3 magnetrons at a height of 12.5cm, however limited by low deposition rate. Follow up with 2 magnetron configuration, more flexible bellows, slight modification for hardware.  Currently, magnetron 3 is moved back to vertical position, original planetary system to continue with user requests.  Turbo pumps are running overnight to achieve better base pressure. Techport service engineers in NNfC in 3 rd week of June, quite supportive, resolved couple of issues on e beam and sputter. AMC proposal awaited( by end July’15)  E-Beam Tool is UP and running. No major issues for June.

Dry Etch and Thin films June 30th, 2015

Dry Etch and Thin films June 30th, 2015

Sputter-1 ( Primary for Metal, Back up for Dielectrics) Sputter-2 (Primary for Dielectrics) Magnetrons for each material to be fixed for fair comparisons. For Sputter 2 being used for Dielectrics, no process monitoring is planned. Trend charts to be generated and updated on Twiki from 1 st week of July, ToolMethod/Fil m Monitoring Items Frequency SubstrateMetrologyRemarks Sputter 1 and 2 Manual check Deposition pressure DailyNoneNATrend chart Manual check Chamber Leak rate Weekly, every Monday(after maintenance) NoneNATrend chart Manual check Chamber Pump down time Weekly, every Monday(after maintenance) NoneNATrend chart Sputter 1 Ti, Cr, Al to verify all 3 magnetrons, 100nm thk? Sheet resistanceMonthly4” Si carrier wafer4 point probe Sample to be fixed at centre, represent 3” uniformity, trend chart ThicknessMonthly 4” Si carrier wafer Dektak Profilometer(kapt on tape on corners for step)

E-Beam Evaporation Trend charts to be generated and updated on Twiki from 1 st week of July ToolMethod/FilmMonitoring Items FrequencySubstrateMetrologyRemarks Techport E- Beam evaporation Manual check Deposition pressure DailyNoneNATrend chart Manual check Chamber base pressure DailyNoneNATrend chart Manual check Chamber Pump down time DailyNoneNATrend chart 300nm Al 150nmAl2O3 Sheet resistanceBi-weekly4” Si wafer4 point probe Wk1-Al Wk-3 –Al2O3 (Trend chart) ThicknessBi-weekly 4” Si wafer AFM for Al. Ellipsometer for Al2O3. AlCompositionMonthly 4”Si wafer(1cmx1cm, sample) XPS

PECVD Note: For SiC, Ge, doped a-Si,, monitoring will be done on a monthly basis. Trend charts to be generated and updated on Twiki from 1 st week of July,2015. Method/FilmMonitoring Items FrequencySubstrateMetrologyRemarks Manual check Chamber Leak rate DailyNoneNATrend chart SiO2 -500nm Si3N4-500nm a-Si-500nm on thin oxide Thickness& Uniformity, Refractive Index Bi-weekly4” Si waferEllipsometerTrend chart StressBi-weekly 4” Si waferK-MOS curvature measurement Trend chart, Pre-dep and post dep meas for above films Wet Etch RateBi-weekly4”Si waferEllipsometer Trend chart, BOE for oxide, KOH for Si3N4 TMAH for Si

RIE-Cl and RIE-F Trend charts to be generated and updated on Twiki from 1 st week of July,2015. ToolMethod/FilmMonitoring Items FrequencySubstrateMetrologyRemarks RIE-Cl and RIE-F Manual checkChamber Leak rateDailyNA Trend chart Visual check Wafer transfer, Plasma& DC bias stability, Helium flow RF & ICP Power (Forward & Reflected) Process Temperature + Chiller status Chamber Pressure &APC valve status Every etch recipe (tool owner and users) NA Log Book RIE-Cl (Metal, dielectrics, Si) Patterned films::SiO2(PECVD) Si3N4(PECVD and LPCVD) Metals –Al, Au Etch rate Etch profileBi-weekly 4” Si wafer Ellipsometer,(selec tivity),Dektak Profilometer, SEM Pattern is lines/gratings 10um to 100um wide. Trend charts and SEM images. RIE-F( dielectrics) Patterned films::SiO2(PECVD) Si3N4(PECVD and LPCVD) Si- iso and anisotropic etch Etch rate Etch profile Bi-weekly4”Si wafer Ellipsometer, Dektak Profilometer, SEM

DRIE SPTS Trend charts to be generated and updated on Twiki from 1 st week of July,2015 Method/FilmMonitoring Items FrequencySubstrateMetrologyRemarks Manual checkChamber Leak rateDailyNA Trend chart Visual check Wafer transfer, Helium flow Every etch recipe (tool owner and users) NA Log Book Silicon Etch rate Etch profile Selectivity with PR and SiO2 Scallops Bi weekly Patterned samples, cut from 4” Si wafer SEM Monitor for 50um (trench width) feature size.

Process Integration June 30th, 2015

 Projects ongoing in NNfC(guided by Prof K.N.Bhat) ProjectUserPI Owner Current StatusChallengesIssuesRemarks MSRIT RF MEMS switch( LaxmiSivaPackaging NNfC fabricated devices at BEL NALow ON/OFF ratio, Au debris, stress in top layer User expects new top layer design and device fabrication MTRDC TWT SWS( ) AnuragSivaLayer 1 design done, awaiting mask preparation & fabrication Layer 2 lithography, wafer-wafer bonding NAeChannel depth, sputter and electroplating, wfr bonding RCI Accelerometer( MandalSiva1 st Iteration design done, awaiting mask preparation&fabrication 7um trench filling and wfr –wfr bonding(hermetic seal) NAUnit process optimization reqd Nanosniff Sensor (2015) SachinSabihaPrototyping successful, awaiting more sample processing No IITGB Micro Needles (2015) BhushanSabihaLitho process optimization needed Back to Front alignment error, More samples will be given after process optimization is done.

 Projects awaiting confirmation/order ProjectUserPI Owner Current StatusChallengesIssuesRemarks NPOL Bending Bar(2015- Kathiresa n Sivaawaiting project confirmationCritical unit process trial &process estimation done, PSGIAS Solar Cell Contact Grid (2015) Balachan der SivaProject discussion, trial run, unit process optimisation&process estimation done -_Awaiting project confirmation INST SiNWs and Resonator (2015) KaushikProcess estimate done, need concrete design NA Unit process optimization reqd, feasible NAL Insulator Deposition and Etching (2015) PrasantaAwaiting samplesNo Processes done earlier, feasible ISRO LEOS RIE SiO2(2015) GiriAwaiting samplesStandard process, Feasible IITG VLNFS (2015) NarayanaProcess estimate done, need concrete design Unit process optimization reqd, feasible