ASAS TN II Workshop Malmö Sept 26-28, 2005 SESAME An initiative for the Single European Sky from the European air transport community.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Armand Racine Consultant Chemicals Branch
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
ESA Iris Programme: status
SESAR DEFINITION PHASE
The Single European Sky ATM Research (SESAR) initiative
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL 19 February, 2006 SESAR ATM Master Plan An introduction.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Program Management Office (PMO) Design
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
F. Schubert / page 1 Functional Airspace Blocks - Can they inspire the ANS World? Air Transport, Air & Space Law and Regulation International.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
Viewpoint Consulting – Committed to your success.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
The European Railway Agency in development
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
1 Framework Programme 7 Guide for Applicants
Integrated Growth Pillar 1 of the SEE 2020 Strategy SEEIC Meeting Sarajevo, 19 June 2013.
SESAR Single European Sky Air traffic management Research
The Preparatory Phase Proposal a first draft to be discussed.
The Challenge of IT-Business Alignment
March 9th, 2006www.eMobility.pl Polish Platform on Mobile Communications and Wireless Technologies CISTRANA Workshop Budapest.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
David Bowen Head of ATM Operations and Systems
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Case study of a successful proposal Rob Davies. Parts of a proposal Part A - Proposal Administrative Overview - forms Part B- Description of objectives.
Nigel Makins EUROCONTROL
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
The Governance and Management of European Universities – Future Trends Thomas Estermann Senior Programme Manager European University Association Targu.
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
NSDS DESIGN PROCESS: ROAD MAPS & OTHER PRELIMINARIES Prof. Ben Kiregyera NSDS Workshop, Addis Ababa, Ethiopia 9 August 2005.
SESAR State of the Art – Civil RPAS Insertion in the European Aviation System 3 rd Workshop on European Unmanned Maritime Systems FÓRUM DO MAR Porto, May.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Air Traffic Management activities in ETSI Jørgen Friis Deputy Director-General DOCUMENT #:GSC13-GRSC6-23 FOR:Presentation SOURCE:Jørgen Friis AGENDA ITEM:4.5.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
AMICI WP1 – Management, coordination and dissemination
ESA Iris Programme: status
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
CEATS Central European Air Traffic Services
WP1 - Consortium coordination and management
Cambodia National Work Plan
OptiFrame WP1: Project Management
ASSTAR Project Overview & User Forum Objectives
The Single European Sky Implementation Programme: SESAME
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
SPECTRUM STRATEGY & VISION
Directorate-General Energy and Transport
Information on projects
Presentation transcript:

ASAS TN II Workshop Malmö Sept 26-28, 2005 SESAME An initiative for the Single European Sky from the European air transport community

ASAS TN II Workshop Malmö Sept 26-28, 2005 SESAME Definition Phase A way to incorporate ASAS into the global ATM picture

Page 3ASAS TN II Workshop Malmö Sept 26-28, 2005 Background (1/2)  Sustainable growth in European economies and further EU integration and harmonisation is essential (Lisbon Agenda)  Single European Sky Implementation Programme (SESAME) in support of the operational implementation of the SES Legislation SESAME will define the future ATM network and steer its subsequent implementation phases SES legislation SESAME Definition PhaseSESAME Implementation Phases

Page 4ASAS TN II Workshop Malmö Sept 26-28, 2005 Background (2/2) Define European air transport system performance requirements up to 2020 and beyond. Identify globally interoperable and harmonised ATM solutions Establish a detailed and phased implementation and deployment plan, Produce the detailed Research and Technology and validation work programme, Propose the legislative, financial and regulatory framework Source: CALL FOR TENDERS Nº AO/03/HQ/EC/05, Requirement Specification for Core Activity, p. 5&6

Page 5ASAS TN II Workshop Malmö Sept 26-28, 2005 General Objectives From agreed performance requirements to implementation of the future European ATM Network Core foundation (ops concepts, architecture, specifications) for implementation with broad commitment Further to this, R&T and validation activities to support the performance requirements for 2020 (long-term baseline) Define the launch conditions for implementation Decision making processes, legislation, regulation, financing Programme Management structure The views of the Air Transport Industry

6 SESAME Definition Phase Governance European Commission Industry Consultation Body Single European Sky Committee EC/EUROCONTROL Steering Board EUROCONTROL Stakeholder Consultation Group Consortium European Commission EUROCONTROL Agency Consortium Contractual Relationship Information & Consultation Mechanisms

Page 7ASAS TN II Workshop Malmö Sept 26-28, 2005 Analyse air transport value and role of ATM M1 Air Transport Framework identified MARKET Identify performance requirements & standards M2 Performance requirements & Standards established SPECIFICATION Identify the most promising ATM concepts Ex: ASAS, 4D trajectory exchange, CDM M3 ATM target Concept defined OPTIONS Optimise concept for deployment M4 ATM Baseline frozen SELECTION Build the ATM Master Plan M5 ATM Master Plan specified ACTION PLAN Define organi- sation & work- programme M6 Work- programme for completed GO The 6 Project Milestones Progressive build-up of the ATM Master Plan through six incremental milestones

Page 8ASAS TN II Workshop Malmö Sept 26-28, 2005  The SESAME initiative is user and customer driven:  Tangible benefits must be defined and achieved  Buy-in is a prerequisite and is essential to minimise risks  The European ATM Master Plan will define viable transition scenarios for ANSPs, airspace users and airports:  Costs/funding, Workforce, consistency with current investment plans  Global harmonisation / interoperability is one key condition for success,  Efforts must be undertaken on all levels: political, institutional, industrial In brief SESAME – a driver for change

ASAS TN II Workshop Malmö Sept 26-28, 2005 CONSORTIUM

Page 10ASAS TN II Workshop Malmö Sept 26-28, 2005 Consortium: a broad basis of expertise Lufthansa Iberia Air France AEA ERA IAOPA IATA LVNL LFV Austrocontrol AENA DFS DSNA ENAV NAV NATS BAA FRAPORT AAS AENA LFV EADS INDRA Airbus BAE Systems Selex SI Thales ATM Thales Avionics Research Centres (10) CAA UK BOEING EURAMID IFATCA ATC EUC JATMWG EBAA ECA Potential Project Associates Airspace Users Basic Consortium Members (9) ANSPs Basic Consortium Members (9) Airports Basic Consortium Members (7) Supply Industry Basic Consortium Members (7) EADS Airbus Thales SA Thales ATM Project Directorate (Secretary) Air Traffic Alliance GIE GLOBAL CONSORTIUM (co-contracting arrangements) Content Responsibility (4 Basic Consortia and Project Associates) Subcontracting arrangements for admin purposes Military (Observer) Users (4) ANSPs (3) Airports (2) Supply Industry (1) PROJECT EXECUTIVE COMMITTEE (10 voting rights) Project Directorate KLM Munich Airport ADP SWISS Initially: 29 members (co-contractors) Currently: up to 33 members

Page 11ASAS TN II Workshop Malmö Sept 26-28, 2005 SESAME Work Breakdown Structure Airspace Users ANSPSupply Industry EURCRCTAIRPORT 2. Performance Requirements & System Definition1. Institutional Framework Definition3. Implementation Plan Definition4. Work Programme for For info only, not necessary up to date Apparent complexity totally tight to the driving Buy In process

ASAS TN II Workshop Malmö Sept 26-28, 2005 MANAGEMENT 3 Bodies: - Executive Committee - Project Directorate - Content Integration Team (CIT)

Page 13ASAS TN II Workshop Malmö Sept 26-28, 2005 Executive Committee The Executive committee is in charge of the overall direction and major decisions with a strategic and high level operational role. It gives appropriate mandate to the project directorate for the daily project operations. It supervises the work of the Content Integration Team and of the Project Directorate. It decides upon use of the Project reserve. It is composed of : 4 Users representatives including the Chairman, 3 ANSPs representatives, 2 Airports, 1 Industry, 1 Military observer. All decisions should be based on consensus, where required voting mechanism applies with at least 75% for decision.

Page 14ASAS TN II Workshop Malmö Sept 26-28, 2005 Project Directorate Project Director Project Assistant Quality & Risk Manager Contract & Finance Manager PMO Performance Manager Communication Managers Configuration & Data Manager Milestone Manager WP Coordinators Project Directorate Ensures the Project control, time and cost management, Handles a master project plan, integrating the dashboards associated to the processes under monitoring (progress, risks, quality,…). Reports to the Executive Committee, and to the Purchaser and the European Commission within the mandate attributed to it by the Executive Committee.

Page 15ASAS TN II Workshop Malmö Sept 26-28, 2005 Content Integration Team: CIT Manage the content of the Project: Drive the preparation of the Milestone Objective Plans (in cooperation with Project Directorate and R levels) Ensure consistency of the work performed through the different Milestones, incl. the successful building of the ATM Master Plan Prepare the Di by integrating the outputs generated by the Participants on WP and Task level as R/O/W Ensure compliance of the work performed with the Milestone Objective Plans and, more generally, the overall project objectives Organisational framework: Staffed by Basic Consortia (2 from ANSP, 2 from Industry, 1 from User Group and 1 from EUROCONTROL (tbd)) in order to provide corresponding expertise Reporting to ExCom Collocated with Project Directorate

Page 16ASAS TN II Workshop Malmö Sept 26-28, 2005 Relationships within the Project Project Directorate Executive Committee PROCESS CONTENT CIT WBS Collocation Participants Responsibility assignment Personnel assignment Sequence of activities WP CoordinatorsR/O/W resp. Milestone Managers Content Integrators D6D6 D5D5 D4D4 D3D3 D2D2 D1D1 Reporting lines

ASAS TN II Workshop Malmö Sept 26-28, 2005 COMMUNICATION PLAN

Page 18ASAS TN II Workshop Malmö Sept 26-28, 2005 Communication & Buy-in Plan Relevant levels of communication : Buy-in of results, recommendations and deliverables Feed-back (through appropriate Q&A forms) Political Buy-in and reporting to political / institutional bodies (e.g. SES Committee, ICB, …) PR & Marketing The relevant stakeholders groups (Internal / external parties) Mechanisms and tools: Existing channels (stakeholders associations’ working groups / newsletters, appropriate EUROCONTROL consultation processes) Channels to be developed (newsletters, presentations, conferences etc)

Page 19ASAS TN II Workshop Malmö Sept 26-28, 2005 Communication & Buy-in Plan Airport represen- tatives Users represen- tatives Airspace users group Industry group Airports group ANSP group Associates represen- tatives ANSP represen- tatives SESAME ExCom Associates Non participating airports Non participating industry Non participating airspace users Non participating ANSPs Non participating associates Politicalbuy-in Industry represen- tatives WP/Tasks Buy-In Buy-in within stakeholder groups Non participants buy-in Politicalbuy-in Internal: External: