NEC2013 – XXV International Symposium on Nuclear Electronics and Computing 9-16 Sept 2013, Varna, Bulgaria W. Lustermann, ETH Zurich for the FACT collaboration.

Slides:



Advertisements
Similar presentations
T-979: SiPM Time Resolution with DRS4 Readout Anatoly Ronzhin, Fermilab, AEM March 12, 2012 Team: Mike Albrow, Sergey Los, Pasha Murat, Erik Ramberg, Fermilab.
Advertisements

The MAD chip: 4 channel preamplifier + discriminator.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
ESODAC Study for a new ESO Detector Array Controller.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Investigation for Readout Electronics of WAC in LHAASO Shubin Liu University of Science & Technology of China April 22nd, 2009.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
CHIPP Plenary meeting August 2010, Gersau, Switzerland W. Lustermann, ETH Zurich TU Dortmund, Dortmund, Germany ISDC, Geneva, Switzerland EPFL,
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
May 4-5, 2006 T.Schweizer, CTA meeting Berlin Concept idea for a future telescope array observatory CTA meeting Berlin May 4-5, 2006 Thomas Schweizer.
1 Max-Planck-Institut fuer Physik, Muenchen, Germany, 2 Humboldt-Universituet Berlin, Germany, 3 Univ. Complutense, Madrid, Spain, 4 ETH, Zurich, Switzerland,
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
Readout ASIC for SiPM detector of the CTA new generation camera (ALPS) N.Fouque, R. Hermel, F. Mehrez, Sylvie Rosier-Lees LAPP (Laboratoire d’Annecy le.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
CCD Cameras with USB2.0 & Gigabit interfaces for the Pi of The Sky Project Grzegorz Kasprowicz Piotr Sitek PERG In cooperation with Soltan Institute.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PSROC, February 2, 2005 Sun Yat-San University Ching-Cheng Hsu National Taiwan University On behalf of NuTel Group Outline :  Overview of NuTel Experiment.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
MaPMT Readout with boardBeetle: First Experiences Beetle User meeting, Zürich, Stephan Eisenhardt University of Edinburgh  Testbeam experiences:
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Update on works with SiPMs at Pisa Matteo Morrocchi.
G. Kieft Nikhef Amsterdam Electronics- Technology PMT tubes PMT bases PMT asic’s Automatic tester for PMT bases Camac test set-up for PMT tubes LeCroy.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Silicon Photomultiplier Development at GRAPES-3 K.C.Ravindran T.I.F.R, OOTY WAPP 2010 Worshop On behalf of GRAPES-3 Collaboration.
SiPM Readout ASIC LAPP Contribution JM Dubois, N. Fouque, R. Hermel, G. Lamanna, F. Mehrez, J.L. Panazol, J. Prast, S. Rosier.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
First Results from the First G-APD Cherenkov Telescope Adrian Biland, ETH Zurich for the FACT Collaboration: TU Dortmund, U Geneva, EPF Lausanne, U Wuerzburg.
The VERITAS Trigger System A. Weinstein 1 for the VERITAS Collaboration 2 CFD x 499 (1 per pixel ) Pattern Trigger Shower Delay ( 1 PDM channel per trigger.
Analog Trigger for CTA MST CTA MST Trigger & Integration Meeting Berlin, 7 November 2011 Luis A. Tejedor on behalf of GAE-UCM, IFAE & CIEMAT groups 1.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
H.Ohoka, H.Kubo, M.Aono, Y.Awane, A.Bamba, R.Enomoto, D.Fink, S.Gunji, R.Hagiwara, M.Hayashida, M.Ikeno, S.Kabuki, H.Katagiri, K.Kodani, Y.Konno, S.Koyama,
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
The dynamic range extension system for the LHAASO-WCDA experiment
DAQ ACQUISITION FOR THE dE/dX DETECTOR
A G-APD based camera for Imaging Air Cherenkov Telescopes
CTA-LST meeting February 2015
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
LHAASO-WCDA: Design & Performance
Front-end electronic system for large area photomultipliers readout
Next generation 3D digital SiPM for precise timing resolution
Status of n-XYTER read-out chain at GSI
SiPM Readout ASIC LAPP Contribution
Commodity Flash ADC-FPGA Based Electronics for an
X. Zhu1, 3, Z. Deng1, 3, A. Lan2, X. Sun2, Y. Liu1, 3, Y. Shao2
BESIII EMC electronics
Stefan Ritt Paul Scherrer Institute, Switzerland
Presented by T. Suomijärvi
Presentation transcript:

NEC2013 – XXV International Symposium on Nuclear Electronics and Computing 9-16 Sept 2013, Varna, Bulgaria W. Lustermann, ETH Zurich for the FACT collaboration TU Dortmund, ISDC Geneva, University of Geneva, EPFL Lausanne, University of Würzburg, ETH Zurich Introduction Camera systems Electronics Control software Results Summary/Conclusion Content

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 2 W. Lustermann, ETH Zurich (for the FACT collaboration) Cherenkov spectrum 2.2 km altitude Cut off ~320 nm Signal amplitude: 200 photons / m 2 (1 TeV γ-ray) Spectrum: (300 – 600) nm Duration: few ns Night sky: up to several GHz Signal amplitude: 200 photons / m 2 (1 TeV γ-ray) Spectrum: (300 – 600) nm Duration: few ns Night sky: up to several GHz Optical imaging system (causes losses) Mirror  light concentrators  photo-detectors Optical imaging system (causes losses) Mirror  light concentrators  photo-detectors Showers can as well originate from protons or electrons – requires a selection

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 3 W. Lustermann, ETH Zurich (for the FACT collaboration) GOAL: detection of gamma induced air showers, measurement of the energy and the source position at the sky The image parameters including the shower shape, position, photon arrive times allow the reconstruction of energy and source position -Air showers induced by gammas, muons and electrons are short ~few ns -Air showers induced by protons are rather long ~(30 – 100) ns The lower the detectable light level the lower the energy threshold for photons Operation at high night sky background (~1GHz) and at moon light conditions, should be possible – extending observation time

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 4 W. Lustermann, ETH Zurich (for the FACT collaboration) Refurbished HEGRA CT3 Mirror area: 9.5 m 2 New drive system New counting hut and electrical installation European Northern Observatory Roque de los Muchachos, altitude: 2200 m Canary Island La Palma New camera G-APDs (SiPMs. …) Solid light guides Fully integrated electronics Using DRS4 Operational since October 2011 Monitoring of bright Blazars Evaluation of stability and performance

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 5 W. Lustermann, ETH Zurich (for the FACT collaboration) Camera Dim: Length 812 mm, diameter 532 mm, Weight: ~ 150 kg 1440 pixels (G-APDs) FOV: 0.11 deg / pixel (4.5 deg total) Water cooled 4.5 deg Requirements for the readout electronics: Dynamic range: ~200 photons / pixel Resolution: < 0.5 photons (for less than 10 photons) – this will allow to measure the gain of the GAPDs from single photon spectra Timing resolution ~500 ps Typical trigger rate of ~50 Hz (~ 350 Hz sustainable trigger rate) Synchronous trigger distribution ~50ps Low power consumption additional electronics: G-APD bias supply Low voltage power conversion system Light monitoring system Slow control system

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 6 W. Lustermann, ETH Zurich (for the FACT collaboration)

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 7 W. Lustermann, ETH Zurich (for the FACT collaboration) FLV:low voltage conversion FSCslow control (Temp., rel Humidity, voltages) FLPlight pulser FDCdrive calibration 2 GHz

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 8 W. Lustermann, ETH Zurich (for the FACT collaboration) Photo detectors: Hamamatsu MPPC active area: 3 x 3 mm pixels of (50  m) 2 Operation voltage: ~70 VGain (nominal): 7.5 x 10 5 Photon detection efficiency (peak): ~35% Single photon resolution Easy to use As good as best PMTs (PDE) Cheaper than PMTs Dark counts, cross talk and after pulse are no problem for IACTs Voltage and Temperature dependence can be kept under control rather easily MPPC glued to solid light concentrator: Increase of the sensitive area Limiting angular (watch only the mirror)

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 9 W. Lustermann, ETH Zurich (for the FACT collaboration) FLV:low voltage conversion FSCslow control (Temp., rel Humidity, voltages) FLPlight pulser FDCdrive calibration 2 GHz

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 10 W. Lustermann, ETH Zurich (for the FACT collaboration) Pre-amplifier 36 pre-amplifiers channels Input: AC coupling with npn transistor in base configuration Input impedance: 25 ohm Followed by an OPA with gain ~10 gain: 45 mV / µA Bandwidth: 200 MHz Single avalanche signal 2.5 mV at the FAD input of 50 ohm Two different functionalities: Pre-amplification of signals for later digitization Summing of signals for the trigger primitives generation design: U. Roeser, layout: L.Djambazov

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 11 W. Lustermann, ETH Zurich (for the FACT collaboration) FLV:low voltage conversion FSCslow control (Temp., rel Humidity, voltages) FLPlight pulser FDCdrive calibration 2 GHz

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 12 W. Lustermann, ETH Zurich (for the FACT collaboration) DRS4 (Domino Ring Sampler) – PSI (S. Ritt) -Analog switched capacitor array -9 channels, 1024 time slices per channel -Operated at 2 GHz (500ps / slice) -ROI: 300 slices (150 ns) -Serial readout -Digitization 12 bit ADC running at 20 MHz FAD board (in total 40) -36 channels, four DRS4 with input buffers -2 dual 12bit ADC (AD9238) -Ethernet interface (Wiznet W5300) -FPGA (Xilinx Spartan-3) -Internal PLL of DRS4 used, locked on clock of the trigger master -Relative timing of all channels of all boards to 300ps is possible (requires calibration) -Controllable voltage source for amplitude calibration DRS4 data: permit and require digital signal processing

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 13 W. Lustermann, ETH Zurich (for the FACT collaboration) Pre-amplifier board (FPA) and analog pipeline ASIC (DRS4) & digitization board (FAD) connected via the mid plane (FMP) distributing power and slow control signals 4 water cooled costume crates: 10 FAD boards 10 FPA + FTU boards Heat spreading planes in the pcb’s Wedge locks as thermal interface Mid plane (FMP): press fit connectors with pins mate able on both side for analog signal passage RS485 buses Power distribution FAD’s in one crate are booted in sequence: limit the startup power (required for FPGA booting) FTU FPA FAD FMP FPA FMP FAD

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 14 W. Lustermann, ETH Zurich (for the FACT collaboration) FLV:low voltage conversion FSCslow control (Temp., rel Humidity, voltages) FLPlight pulser FDCdrive calibration 2 GHz

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 15 W. Lustermann, ETH Zurich (for the FACT collaboration) Trigger unit (FTU) – 40 pieces Mezzanine card on the pre-amplifier card 12 bit DACs for discriminators thresholds: 15 DAC counts / p.e. Majority coincidence N-out-of-4 logic, combine trigger signals (practically an OR is used) RS485 interface to trigger master FPA: pre-amplifier analog summing of signals of patches (9 channels) Masking of individual channels (noisy) Clipping of trigger sum to 10 ns Discrimination of the sums: 4 trigger signals Trigger on analog sums of non overlapping patches: 9 pixel Functionality spread over several components: FPA – pre- amplifier, FTU – trigger unit and FTM – trigger master Rate control system (software) maintains a constant trigger rate (70 Hz) under varying conditions Counter for all discriminator outputs and the majority coincidence output are implemented  automatic adjustment of discriminator thresholds  stabilize trigger rates under varying conditions

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 16 W. Lustermann, ETH Zurich (for the FACT collaboration) FLV:low voltage conversion FSCslow control (Temp., rel Humidity, voltages) FLPlight pulser FDCdrive calibration 2 GHz

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 17 W. Lustermann, ETH Zurich (for the FACT collaboration) Trigger master (FTM) – 1 piece receives 40 FTU signals Trigger: N out of 40 logic, for an adjustable time window of (8-64)ns Special triggers: light pulser (N=25) random (clock) Interface for external trigger Triggers can be individually enabled and run simultaneously Ethernet interface for control and setup Control of all sub units FAD and FTU via RS485 Note: the trigger part of the VHDL code was purchased from a company

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 18 W. Lustermann, ETH Zurich (for the FACT collaboration) FLV:low voltage conversion FSCslow control (Temp., rel Humidity, voltages) FLPlight pulser FDCdrive calibration 2 GHz

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 19 W. Lustermann, ETH Zurich (for the FACT collaboration) 4 fast control signals: CLOCK, RESET, TRIGGER, TIMEMARKER CLOCK: used to synchronize all DRS4 (<100ps jitter) RESET: reset all DRS4 Trigger: upon detection of a trigger condition a rectangular pulse (TIMEMARKER) is emitted (with a customizable delay) which is coupled into channel 9 of all DRS4 chips After another customizable delay the TRIGGER signal is send A bit pattern containing the event ID and the trigger type is distributed to all FAD boards via RS485 and included into the digitized data While digitizing the FAD boards send a busy signal blocking the generation new triggers Tow dedicated fast control pcbs: 1 to 10 fold fan-outs (ON Semiconductor MC100LVEP111 WireWin Cat. 6 slim LVDS cables with RJ45 connectors Test results: jitter < 20ps and skew<250 ps

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 20 W. Lustermann, ETH Zurich (for the FACT collaboration) three Agilent AC-DC supplies: G-APD bias (85V) interlock system and heaters (24V) Camera (48V) two 45m long cables provide power and ten G-APD bias voltages to the patch panel Power conversion inside the camera: DC-DC converters (VICOR VI-J300 series) Adapted filter: mainly a common mode choke and a Tantalum capacitor step-down converters on the FAD Power consumption: Total inside 570W 100W in the cables 100W DC-DC converter Outside: 100W G-APD bias

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 21 W. Lustermann, ETH Zurich (for the FACT collaboration) The slow control board measures: all Voltages and currents of the DC- DC converters 31 temperatures close to the G-APDs in the sensor plane 24 temperatures for the electronics compartment (crates, DC-DC conv.) 4 times humidity Slow control board: Atmel ATmega32L micro-controller (on Arduino board) Wiznet W5300 Ethernet interface for data transmission. 148 channels multiplexed onto a 24 bit ADC, AD7719 with integrated current sourcing for temperature probes. Temperature probes: PT1000 Arduino

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 22 W. Lustermann, ETH Zurich (for the FACT collaboration) Single channel board HV operational amplifier OPA454 controlled by a 12 bit serial DAC (DA8034U) output voltage adjustable (0 – 90) V calibration using trim potentiometer voltage set precision 22 mV High side current monitor (HV7800) Over current protection, limit (1-5)mA Single channel board HV operational amplifier OPA454 controlled by a 12 bit serial DAC (DA8034U) output voltage adjustable (0 – 90) V calibration using trim potentiometer voltage set precision 22 mV High side current monitor (HV7800) Over current protection, limit (1-5)mA 32 channel HV mother boards HV crate: 320 channels 1 crate controller with USB interface 10 HV mother boards power conversion /distribution and control bus wired in the back of the crate primary power source: Agilent N5769A HV crate: 320 channels 1 crate controller with USB interface 10 HV mother boards power conversion /distribution and control bus wired in the back of the crate primary power source: Agilent N5769A G-APDs are sorted in groups of 4/5 according to their operation voltage  320 bias channels

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 23 W. Lustermann, ETH Zurich (for the FACT collaboration) 1) MPPCs – cone gluing 2) cone gluing to front window Completed sensor plane 3) connector cable soldering to MPPC

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 24 W. Lustermann, ETH Zurich (for the FACT collaboration)

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 25 W. Lustermann, ETH Zurich (for the FACT collaboration) DIM: Distributed Information Management System (CERN) Qt4

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 26 W. Lustermann, ETH Zurich (for the FACT collaboration) single photon spectrum of one channel Timing resolution obtained from the differences of the photons arrival times in muon rings: 600 ps Digitized data allow post- processing – increasing understanding and performance Oversampling allows noise reduction Excellent single photon resolution allows precise inter-calibration Excellent timing resolution fit 1pe 2pe gain

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 27 W. Lustermann, ETH Zurich (for the FACT collaboration) Dark count spectrum (calirated) Closed shutter 1440 pixel 180k events All gains normalized to 1 Gain variations: < 6% (temp/time) < 4 % pixel to pixel gain fit 1pe 2pe 3pe 4pe 5pe 6pe 7pe 8pe

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 28 W. Lustermann, ETH Zurich (for the FACT collaboration) 1) Compensation for temperature changes Measure temperatures near the GAPDs Correct V bias for the change of V bd to maintain V over constant 2) Compensation for changing NSB conditions Measure bias currents Calculate voltage drops and compensate V bias VsVs V bias = V s – R * I(NSB) 3) Verify the stability using the temperature stabilized light pulser installed in the center of the mirror dish with compensation without compensation Achieved gain stability: ~6% Conclusion: light pulser not required, temperature and bias current based feedback sufficient

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 29 W. Lustermann, ETH Zurich (for the FACT collaboration) air showers Dark night 90% full moon NSB Trigger rate scans: Varying the discriminator thresholds of the trigger patches 26 trigger rate scans (Mar – Jul 2012) Observations with high night sky background (NSB) are possible (full moon)  increase of observation time Trigger rates as function of V bias V bias : (0.8 – 1.6) V Nominal: 1.2 V Digital noise Gains and trigger system are very stable air showers

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 30 W. Lustermann, ETH Zurich (for the FACT collaboration) FACT: CRAB PWN 14.3 h ( ) - ‘standard candle’ Significance: 20.8σ t on / t off = 0.2 N excess = N background = Courtesy of NASA/ESA Hubble: Optical Chandra: X-ray

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 31 W. Lustermann, ETH Zurich (for the FACT collaboration) FACT: Mrk 501 – 35.1 h ( ) Significance: 6.6σ t on / t off = 0.2 N excess = N background = FACT: Mrk 421 – 23.4 h ( ) Significance: 37.9σ t on / t off = 0.2 N excess = N background = 269.6

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 32 W. Lustermann, ETH Zurich (for the FACT collaboration) Day (MJD) rate / hour excess x 7 Mrk 501 flare (observed by FACT) – send alert to Magic About 5 min. of observation would have been sufficient to detect the flare!  Monitoring of bright sources with small telescope is possible alert stable background

NEC2013, 8-16 Sept 2013, Varna, Bulgaria 33 W. Lustermann, ETH Zurich (for the FACT collaboration) Electronics system works reliably since 2 years Signals from CRAB, Mrk421, Mrk501 observed Excellent performance permit bright blazar monitoring Minor problems (one DC-DC converter failure, one cooling pump failure solved on site) Electronics system works reliably since 2 years Signals from CRAB, Mrk421, Mrk501 observed Excellent performance permit bright blazar monitoring Minor problems (one DC-DC converter failure, one cooling pump failure solved on site) Join us during observation at: Join us during observation at: