Ash River Pivoter Status Update for Outfitting Workshop Dave Pushka, December 15 2011 Status/schedule for pivoter assembly Schedule for pivoter tests Schedule/documentation.

Slides:



Advertisements
Similar presentations
2014 Redrock Software Conference Up and Running in 1 hour Pre-Conference Session 2 2:10-3:10.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
LUCIA MAR UNIFIED SCHOOL DISTRICT Facilities Update Facilities Master Plan & Sustainability Projects Information.
Jeremy West Sr. Operations Planning Engineer ECC Update January 28, 2015.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Contour Bandsaw Parts and Accessories
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Office of Traffic, Safety and Technology Chapter 4 Types of Signs Traffic Signs 101 November 20, 2014.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
SQXF Shell & Yoke Assembly Procedure
1 Oncor Electric Delivery Proposed Changes To The 2012 National Electrical Safety Code.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
NoVA FNAL Engineering Needs 9 February 2009 Dave Pushka.
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.
Design Progress Allen Ellis 18-September
Meeting the 10% Conservation Goal Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) April 11, 2008.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Far Detector Assembly Block Pivot Table Installation WBS Dave Pushka August 23 th, 2011.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
Ministry of Land, Infrastructure, Transport and Tourism Approval System for New Mobility The 52 nd Session for GRSP ( ~14 ) Ministry of Land,
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
HP Project & Portfolio Management Entering Actual Hours for Project work July 11, 2007 CIMpleBS.com/HP-PPM/Training-Time Sheets.pps By Dan Gallagher See.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
6-Answers-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise – Part A – Session #6.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Miniature Centrifugal Compressor Development Kevin Finney Ray Zhou Dr. Kapat Dr. Chow October 18, 2002.
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
Lecture 7 Rootkits Hoglund/Butler (Chapter 5-6). Avoiding detection Two ways rootkits can avoid detection –Modify execution path of operating system to.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Performance Requirements J. Lewis Level 2 Loya Jurga 7 December 2001.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Solving Problems with Harmonics. Example 1 A glass pipe put inside a graduated cylinder filled with water will have a closed ending where the water starts.
Presentation of Elektroline Inc.. ELEKTROLINE Inc. - PRODUCTION PROGRAMME Production programme development ▪ design ▪ production ▪ sale ▪ delivery ▪ installation.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
Jcjc “Weekly” Meeting What’s Going On… Monthly MSD Seminar ( 2 nd Tuesday of each month at 4:00pm…) – 3 rd Tuesday of every month, 11:00 am in.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
OTE Building PMG Report June 25, 2012 Rhonda Merchut 1.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
4.5 K Cold Box Schedule Recovery Directors’ Review
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
Standard Work Instruction: MHE Pre-Trip
MHE Pre-Trip Inspection Standard Work
SBS- Counterweight Support and Magnet Assembly - Status
LARP Phase II Secondary Collimator RC1
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Parts.cat.com Client training 2016.
PIANC Work Group SMART Rivers 2017
ActivRAC® 16P Mobilized Storage System
ActivRAC® 7M Mobilized Storage System
SR 1 and 2 Hay Point Fatigue Damage Structural Risk
ActivRACTM 30P Mobilized Storage System
Tennessee Highway Safety Office FY19 Grant Orientation Workshop
Safety Fabrication, assembly, and installation
Монголын даатгалын зах зээлийн бодлогын асуудлууд
Presentation transcript:

Ash River Pivoter Status Update for Outfitting Workshop Dave Pushka, December Status/schedule for pivoter assembly Schedule for pivoter tests Schedule/documentation for pivoter safety review

Pivoter Assy Status & Schedule Lower assembly 90+% complete Need to: – Hook up kneeling cylinder hydraulics – 1 day effort – Add cross bracing – 1 day effort – Mount and wire pivot cylinder controls -1 day electrician effort – Install ‘Stack light” (a warning light for when the thing is powered) - few hours electrician effort

Table Part Delivery Schedule “C” sections and forks (bottommost parts when table is vertical) – fabricated and in Wideband. “B” sections 4 of 12 in Wideband, remaining 8 units schedule for delivery 12/16 and 1/14. “A” sections (center with pivots) due 12/22 and 1/6 “A” sections ( center w/o pivots) 2 due each on 1/24 and 1/31 “D” sections (uppermost sections when table is vertical) due (2) 1/31, (2) 2/3 & (2) on 2/10

Pivoter Assembly Schedule HTS and their subcontractor Alltech due to re- mobilize in early January. – Expect to Work on Table assembly as priority #1 – Expect to use South bookend installation as priority #2.

Schedule for Pivoter Tests Drive wheels tested with counterweights installed. Kneeling cylinders will be tested on my next trip (controls have already been tested at CDF). Pivot cylinders will be tested as soon as the table is completed.

Pivoter Safety Review(s) Calculations for Lower Portion of Pivoter Submitted and Reviewed for the FHEP unit in CDF. – Calculations addressed loads for Ash River. Engineering Note for Table on its 4 th iteration. – Expect to Submit this before 2012 FNAL Review Process should start NOW. U of MN Building Code Review – Likely tedious to get building reviewers up-to- speed but calculations show code conformance.