Transformer Asset Management

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

WP3 High Availability Drives Electrical Machines and Drives Research Group University of Sheffield Dr. Georges El Murr
SDG&E PI-based Substation Real-Time Condition Based Maintenance System
Terry Chandler Power Quality Thailand LTD PQsynergy 2011 Chiang Mai, Thailand Sept 2011WWW.powerquality.co.th1.
MAGNA3 – “built on a proven foundation”
Load Management System
PSE&G Condition-Based Maintenance
TRANSFORMERMONITORING Integrated Solutions. Christian BuchnerAREA SALES MANAGER NORTHERN EUROPE.
VSE Corporation Proprietary Information
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
Energy Efficiency and Intelligent Power Plants Rameshbabu R S 10 th May, 2006 The Center For Bits And Atoms MIT.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
BHEL – Electronics Division, Bangalore
Engineer Presentation
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
On Load Tap Changing Transformer Paralleling Simulation and Control.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Basic Electricity.
PRODUCTS TRANSFORMERS ENERGY SAVING TRANSFORMERS (EST) TRANSFORMER RECTIFIER UNITS 3 rd HARMONIC REJECTION TRANSFORMERS (HRT) ULTRA HIGH ISOLATION TRANSFORMERS.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Example of SIMONE Network Manager Integration Plinacro project description.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Supervisory Systems.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
SCADA and Telemetry Presented By:.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
FG Wilson Access 4000 Control Panel
Fleet Performance and Reliability in Generation Utilities
Motor Testing (Motor Only)
4/22/2017 WHAT IS THERMOGRAPHY?
Condition-based Maintenance Across the Enterprise
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
Planning and Analysis Tools to Evaluate Distribution Automation Implementation and Benefits Anil Pahwa Kansas State University Power Systems Conference.
1 Weblite Product Introduction. 2 Control Equipment via the Internet 8 Universal Inputs 8 Universal Outputs software selectable as analog or digital signals.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Insert Photo Here OneGear™ SMC™ Flex Controller kV.
IQ Analyzer 6400/6600 Series Cutler-Hammer Power Management Products High End Metering Capabilities.
Paul Dyer Condition Criticality Risk Rating and Condition Monitoring in a Distribution Network PAUL DYER DAVE OPENSHAW London Electricity Group.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
PS ERC Transmission and Distribution Technology Research Stem Meeting #10 Committee Meeting Mount Hood, August 15-18, 2002.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Magnum Chiller Plant Manager
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
ONLINE MONITORING APPLICATIONS OF POWER TRANSFORMER Deepak Subedi.
Kaeser Direct Drive CSD Rotary Screw Compressors
LubeWatch® Oil Analysis Program
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Predictive-Based Maintenance Strategy
SCADA for Remote Industrial Plant
Chiller Energy Audit Welcome remarks TBD..
A Future Oriented Data Platform for the Electric Power Grids
How SCADA Systems Work?.
A transformer is a complex protective object
Transmission Solutions
Substation Automation IT
Robicon Perfect Harmony.
Loop Water Controller Overview
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Transformer Loading Considerations
Future of digital data center infrastructure
Presentation transcript:

Transformer Asset Management Selwyn Braver Dynamic Ratings Pty Ltd Melbourne, Australia April 20, 2017

Overview Equipment Categories Collecting the Data Gauges Electronic Temperature Monitors (ETM) Transformer Management Systems (TMS) Collecting the Data Temperatures: Methods of measurement Converting Data to Information Getting the Right Information to the Right People Converting Information into Benefits April 20, 2017

Changing Environment Utilities have entered an era where cost and competitiveness are business drivers The capacity in existing assets must be driven harder than in the past without loss of customer service or reliability Networks have expanded and become more difficult to operate Asset Managers, Planners, Operators and Maintenance staff need better tools - management based on facts, not assumptions The environment in which we work is becoming increasingly more complex. Not only from a technical perspective, but also due to financial and regulatory pressures. Engineers operating in electricity utilities are facing different issues from the past. Some of the major issues are: Cost competitiveness is becoming increasingly important. mouse As a utility, we cannot afford to lower our standards of customer service and reliability of supply and yet at the same time we MUST drive the assets which we have harder. In other words, we want to use our existing expensive assets (like transformers) for longer and to their full capacity. We need to manage our assets better and know more about their operating history. Because we are loading our transformers higher than ever before in day to day operations, our networks are becoming harder to operate and our previous experience of the operating life of assets on the network will have to be re-examined. Everyone involved in operating the network will need better tools if we are going to drive the assets harder and return better results for our shareholders and stakeholders. Importantly as well, all the major players the planners, operators and maintenance staff must be running the network process with the same strategies. It would be far from ideal if the planners in the utility were utilising highly sophisticated computer models for the rating of transformers and the operators of the network had the relatively unsophisticated tools of the past. For example they may have no tools at all or perhaps a simple analogue or two from a SCADA system. next slide April 20, 2017

Justification for Online Control & Monitoring Increase the availability and capacity of power transformers Redirection of time and/or operational based maintenance to condition based maintenance Asset and life management Failure cause analysis April 20, 2017

Benefits of TMS Major cost savings possible by deferring plant upgrades-achieved using dynamic rating to work assets harder Further large cost savings by reducing risk and frequency of unplanned outages, achieved using dynamic rating and condition monitoring together to avoid plant failures, expensive repairs, loss of revenue April 20, 2017

Benefits (cont) Longer life of assets, achieved by reliability centred maintenance based on condition monitoring Reduced maintenance costs, avoiding unnecessary maintenance inherent in fixed interval scheduling Objective data for planning Insurance premium reductions April 20, 2017

Equipment Categories: Gauges Temperatures April 20, 2017

TMS TEMPERATURE MONITOR VS CONVENTIONAL WTI OTI April 20, 2017

Electronic Temp Monitoring (ETM) “Basic” Temperatures April 20, 2017

Electronic Temp Monitoring (ETM) “Advanced” Temperatures Cooling System LTC Monitoring April 20, 2017

Transformer Management System (TMS) Temperatures Cooling System LTC Monitoring/Control Load Monitoring Connection to other IEDs April 20, 2017

Evolution of Transformer Controls Control House Control Alarms Communications Temp Expert Software Protocol Converters Data Logging Event Recording Temp LTC Control Oil Level Condition Monitoring LTC Monitoring DGA Moisture Direct Winding Temp Other Monitoring Input LTC Paralleling Sudden Pressure April 20, 2017

Overview of TMS Integrated microprocessor-based system with: Dynamic Rating - real time thermal limit predictive loading capacity-real time aging Monitoring -data acquisition & storage of all data for the entire transformer Operating data: volts, amps, watts, vars, tap position, temperatures - ambient, oil and winding hot spot, etc Condition monitoring probes - DGA, water in oil, bushing and OLTC condition Control –Voltage(OLTC) and Cooling Communication –Web server(at sub or LAN / WAN), IU, SCADA, modem, TCP/IP, DNP 3.0, Modbus April 20, 2017

Converting Data into Information Dynamic Transformer Rating 60 2 Hr Overload 50 FA 40 FA 30 OA OA/ FA/FA = 30/40/50 (ONAN/ONAF/ONAF) PTLoad (software to calculate overload) DRMCC is specifically tuned to each transformer, as apposed to an average transformer of same value. Actual ambient is measured. Top oil temp is monitored. DRMCC will automatically derate loading if a cooling bank/pump/fan motor is lost. Thermal Model Tuned to this specific S/N Transformer Ambient Actual Ambient Top Oil Temp Starting Top Oil Temp Cooling System Health Fans/pumps/breakers/contactors April 20, 2017

April 20, 2017

What is Dynamic Rating? Real-time on-line calculation of loadability Based on thermal model (modified IEC / IEEE) Guide for Loading Mineral-Oil-Immersed Transformers IEEE C57.91,IEC354 Transformer thermal parameters from design or test Retrofits, thermal model from recorded site data and mathematical modeling Uses measured ambient & top oil temperatures, tap position & load current Can typically enable 20% increased loading with reduced risk and number of outages April 20, 2017

Collecting the Data Data typically collected LTC (OLTC) Top Oil Temp Position Temperature LTC Motor Current Oil Level Sudden Pressure Vacuum Bottle Fail Filter clogged/excessive pressure The following if equipment fitted DGA Dissolved Moisture, MIO Direct Winding Temperatures Bushing PF Partial Discharge Top Oil Temp Winding Hot Spot (if fibre probes) Load Amps per phase Voltage Ambient Temperature Cooling Status Operating Status Amp Draw Contactor Operation Control Switch Positions Alarm Contacts & Ancillaries Sudden Pressure Pressure Relief Main Tank Oil Level Nitrogen Pressure April 20, 2017

Converting Data into Information Information typically calculated/determined Alarm Contacts & Ancillaries Oil Leak Nitrogen Leak LTC (OLTC) Time Since Last Through Neutral LTC Delta T LTC Counter Total LTC Counter Per Tap Position LTC Contact Wear (I Squared) LTC Drive System Fail Filter clogged/excessive pressure Internal Transformer Problem/Threshold monitoring DGA Dissolved Moisture, MIO Direct Winding Temperatures Bushing PF Partial Discharge Winding Hot Spot (for all windings) Forecasted Temperatures Ultimate WHS Ultimate Top Oil Temp Insulation Loss of Life Dynamic Rating Max Load Max Time “What If” Load Amps* Voltage* Watts Vars Cooling Status Cooling Efficiency Problem Fan or Pump Fail Contactor Fail Control Switch Not In Auto April 20, 2017

Accurate WHS Determination Methods of Winding Hot Spot (WHS) Measurement Simulated (inaccurate, local EM or analog measurement) Calculated (via DRMCC using the customized thermal model) Direct Measurement (fibre probes in coordination with DRMCC) The DRMCC “calculated” and the “direct measurement” methods complement each other in specific conditions April 20, 2017

Insulation Aging Rate April 20, 2017

Cooling System Features Cooling Control - dynamic predictive control of the operation of fans and pumps Cooling System Monitoring Continuously confirms operation of each fan and pump. Cooling System Exercise Exercises cooling system and checks the operation of fans & pumps. Run Hour Meter for Each Cooling Stage Ensures equal mechanical wear on all fans/pumps. April 20, 2017

Voltage Control Modes Independent Master Follower-(fibre optic comms)* Circulating Current-(fibre optic comms)* VAr Sharing Reverse Reactance SCADA control and SCADA set points *between transformers/DRMCCs April 20, 2017

Gathering Downstream Data, Storage, Interpretation & Communication Condition Monitoring Equipment -DGA -MIO -PD -Tan Delta -Fibre optic temperature

Getting the Right Information to the Right People Connect to the front with serial cable using terminal server. Connect to the LAN/WAN with ethernet using internet explorer Connect to SCADA using DNP, or Modbus using RS-232, RS-485 or fiber Other options: Modem (Pacificorp has an installation in UT monitored from OR via modem). Wireless from Xformer to control room. April 20, 2017

SUGGESTED SCENARIO Management Substation Environment April 20, 2017 SCADA Control centre Utility intranet Control room F ibre optic cable and Comms Retrofit cubicle Transformer Condition sampling device Management Environment April 20, 2017

April 20, 2017

April 20, 2017

April 20, 2017

Benefits of TMS Major cost savings possible by deferring plant upgrades-achieved using dynamic rating to work assets harder Further large cost savings by reducing risk and frequency of unplanned outages, achieved using dynamic rating and condition monitoring together to avoid plant failures, expensive repairs, loss of revenue April 20, 2017

Benefits (cont) Longer life of assets, achieved by reliability centred maintenance based on condition monitoring Reduced maintenance costs, avoiding unnecessary maintenance inherent in fixed interval scheduling Objective data for planning Insurance premium reductions April 20, 2017