Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP 10300 Instrument.

Slides:



Advertisements
Similar presentations
© 2003, Cisco Systems, Inc. All rights reserved..
Advertisements

University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 iBTF module Prototyping Version.
SALT RSS-NIR MID-TERM REVIEW MAY 20 & 21, 2009 ANALYTIC OPTICS KENNETH NORDSIECK UNIVERSITY OF WISCONSIN.
University of Colorado at Boulder – ECE Capstone – CDR – October 16, 2007.
OPTICAL COMPONENTS 9/20/11. Applications See notes.
Available at: – Program Optical Quad Encoders in Autonomous Mode Program optical quad encoders in autonomous mode.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Dispersion Measurements Lecture-3. Dispersion Measurements Measurement of Intermodal Dispersion The most common method for measuring multimode fiber bandwidth.
Near Infrared Tunable Filter System for ATST Big Bear Solar Observatory & Solar Research Center, NJIT Aug. 25, 2003.
IFTSUV: an Imaging Fourier Transform Spectrometer in the UV Anne Millard, 3 rd year PhD student, directed by P. Lemaire and J.-C. Vial.
G.Chiozzi European Southern Observatory Trieste 04/10/1999 Icalepcs 99 Tutorial Use Cases for Requirements Capture and Tracing.
5 Components Common to All Optical Spectrometers Source Transparent Sample Holder Wavelength Selector Radiation Detector Signal Processor and Readout.
Kris Horn Santhoshi Smitha Thota Uday Chandra Karrotthi.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Engineer Training Motion Control TJ8300 / TJ8500 Motion Control.
UPC/SHMEM PAT High-level Design v.1.1 Hung-Hsun Su UPC Group, HCS lab 6/21/2005.
Advanced Optics Lab at San Jose State University Ramen Bahuguna Department of Physics.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Software Giseli Ramos.
1 Solar-B Data Co-Alignment Plan T.Shimizu (NAOJ) Solar-B MO&DA Working Group Solar-B 4 th Science
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Stabilization of Focus at ATF2 David Urner University of Oxford.
The Prime Focus Imaging Spectrograph Design and Capabilities
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
DDRIII BASED GENERAL PURPOSE FIFO ON VIRTEX-6 FPGA ML605 BOARD PART B PRESENTATION STUDENTS: OLEG KORENEV EUGENE REZNIK SUPERVISOR: ROLF HILGENDORF 1 Semester:
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Slide 1 2/22/2016 Policy-Based Management With SNMP SNMPCONF Working Group - Interim Meeting May 2000 Jon Saperia.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
© 2002, Cisco Systems, Inc. All rights reserved..
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Software Overview Sonja Vrcic
l 66TH MEETING OF THE ESRF l May 2014 l Author
OpSim4 vs OpSim3 Francisco Delgado
Launch and On-orbit Checkout
USP-IAG Universidade de São Paulo
LightBend™ 1xN Fiber Optic Switch Module
CrystaLatchTM High Power 1x1,1x2 Solid-State Fiberoptic Switch (5W CW)
CrystaLatchTM 1x1,1x2, Solid-State Fiberoptic Switch
CrystaLatchTM 1x8 Fiberoptic Switch
Performance Specifications
CrystaLatchTM Mini 1x3,1x4 Solid State Fiberoptic Switch
Performance Specifications
CrystaLatchTM 1x1, 1x2, Solid-State Fiberoptic Switch
CrystaLatchTM Bi-Directional 1x1,1x2 Solid-State Fiberoptic Switch
CrystaLatchTM 1x2 PM Bidirectional Fiberoptic Switch
CrystaLatchTM 1x2 Multicasting Solid-State Fiberoptic Switch
CrystaLatchTM Single Stage 2x2 Series Fiber Optical Switch
CrystaLatchTM 1x16 Bidirectional Solid State Fiberoptic Switch
Performance Specifications
Performance Specifications
Quanta FIB Basic Training xT Microscope Control
Performance Specifications
CrystaLatchTM 1x4 Fiberoptic PM Switch
CrystaLatchTM Mini 1x3,1x4 Solid State Fiberoptic Switch
Performance Specifications
CrystaLatchTM 1x1,1x2, Solid-State Fiberoptic Switch
CrystaLatchTM 1x3,1x4 Solid State Fiberoptic Switch
CrystaLatchTM Bidirectional 1x8 Solid State Fiberoptic Switch
Task Manager & Profile Interface
Presentation transcript:

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP Instrument Control System Cosentino, R., Romano, P. Belluso, M., Comparato, M., Giorgi, F., Grivel, C., Laforgue, D., Paez, E.

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 2 Instrument Control Software Overview The instruments are designed and constructed to be used simultaneously and synchronized. There will be also a deep interaction among the ICS and some external sub- system developed by other sub-WPs

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 3 EST ICS architecture Two options are available to send a command to ICS. In the former case an already defined configuration, i.e., list of commands and parameters, can be send to the ICS through the sequencer. In the latter case a generic user can select a configuration by the GUI. Moreover, the user can download a complete configuration and can use the GUI to modify some parameters or part of the setup.

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 4 ICS coordinator classes

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 5 Broad Band Imager

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 6 Devices Numbe r of devices Type of movement Comments Mechanism to insert appropriate optical targets 1TBD TBD if it will be common for all the instruments Linear stage to switch between the two different resolution modes 22 positions Mechanism: linear stage TBC Focus system1or 2Linear TBD, along the optical axis Filter wheels or linear stages 2TBD The number of slots is TBD Instrument sensorsTBDN/A hw controlled; temperature monitoring; environment monitoring (TBD at ICS level?) Filter electronic device TBDN/A hw controlled; temperature monitoring Linear stage for out of focus detector 1LinearAlong the optical axis Detector controller3N/A1 controller per detector Crossed polarizer drive 1 or 2rotation 1 in continuum sub channel and 1 (TBC) in “narrow band” sub channel Broad Band Imager

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 7 BB class diagram

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 8 BB use case

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 9

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 10

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 11 Narrow Band tunable filter Spectropolarimetr Devices Number of devices Type of movement Comments Stop wheel1rotationalwith 4 slots Filter wheel for filtergram channel 1rotationalthe number of slots is TBD Filter wheel for continuum channel 1rotationalthe number of slots is TBD Pre filter tilt device2tilttuning purpose Focus drive2linear for focusing purposes; with 2 linear stages Linear stage for laser channel1linear to insert and remove the laser flip mirror ICOS / controller of each FP3piezo 3 actuators and 5 air capacitors; hw controlled and monitoring Instrument sensorsTBDN/A hw controlled; temperature monitoring Modulator package2linear to remove and insert the modulator and the Wollaston prism Linear stage for etalons3linear to remove and insert an individual etalon Tilt device for etalons3tiltto tilt an individual etalon Tilt devices for collimator mirrors 2tiltfor collimation purposes High precision rotation table1rotationalfor alignment purposes Crossed polarizer drive1rotationalto adjust the light level Detector controller2N/A1 controller per detector (TBC) Linear stage for out of focus detector (TBC) 1LinearAlong the optical axis

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 12 NB class diagram

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 13 NB use case

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 14

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 15 Grating Spectropolarimeter

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 16 SP class diagram

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 17 GS use case

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 18

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 19 Deployment diagram

Freiburg, May 2011 EST Design Study. End of Phase-III Meeting 20 Plan for the next future Detailed definition of classes and methods Implementation of instrument simulator Development of instrument control system in “simulation mode” (prototyping) Test of the communication software Final design of the node deployment Reliability and failure analysis of critical parts Development of instrument user interfaces (GUI)