9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Temperature Uncertainty Budget and Calibration Fred Best 9 March 2004.

Slides:



Advertisements
Similar presentations
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
Advertisements

Thermal Control Subsystem Passive Techniques Paints – White and Black Multi-layered Insulation 15 layers Betacloth, aluminized Kapton Dacron Netting, Kapton.
Primary Noise Calibration Systems (DC - 110GHz) – Accuracy and Advantages Sathya Padmanabhan Maury Microwave Corp. For electronic copy of presentation.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Traceability and Quality Control in a Radiation Thermometry Laboratory Frank Liebmann – Tom Kolat NCSLi 2011.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Distillation Heat Analysis ENCH 435 September 20, 2005 Jason Hixson Michael Hickey Don Scott.
Pre-launch Characterization of the CERES Flight Model 5 (FM5) Instrument on NPP S. Thomas a, K. J. Priestley b, M. Shankar a, N. P. Smith a, M. G. Timcoe.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
© 2014 Fluke Corporation Fluke Calibration Web Seminar Series Principles and practical tips about electrical, flow, pressure, RF and temperature calibration.
DAQ Calibration for Heat Exchanger Calibration of Cold/Hot Flow Rate and Temperature UTC ENCH/ENEV /25/03 Greg Kirton Kevin Zitzow Phuong Mai.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Improving Uncertainties of Non-Contact Thermometry Measurements Mark Finch Fluke Calibration.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
1 CNS/GSS/2008/M4 1 Module 4 Metal Enclosures – Various types.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Mechanical Design Doug Adler 9 March 2004.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Emissivity Modeling and Uncertainty Budget 09 March 2004.
GC-HR-ToF Instrument overview 7/16/2015 JDC. Instrument Systems.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Pot 32x16 channels = 512 Readout a pair of rows on one end and the next pair on the other. Connect the fibers to “SiPM cassettes” in 2 row by 16 channel.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
Alan Hinton March, 2006 Slide 1 NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Development Plans, Logistics, and Facilities Fred Best 9 March 2004.
High Altitude Imaging and Atmospheric Data Collection Experiment by SABRE (Scientific Aerospace and Balloon Research Engineers) Team Advisor:Atin Sinha.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Action Items From PDR Fred Best 9 March 2004.
CLARREO UW & Harvard Team Proposed IIP Activities (with description of underlying research) Fred Best CLARREO Meeting at NIST 12 June, 2008 University.
Digital Temperature Switches The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
A Method for Correcting for Telescope Spectral Transmission in the Geosynchronous Imaging Fourier Transform Spectrometer (GIFTS) John D. Elwell, Deron.
Introduction to Thermal Radiation and Radiation Heat Transfer.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Thermal Control Subsystem (TCS)—Intro Lesson 37 Spring.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
SPP Fluxgate MAG input to FIELDS Quarterly Review – 7/18/2013 Bob MacDowall, Ron Oliversen, Dave Sheppard, Scott Murphy, Jim Odom, Jack Connerney.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Multiple Module Vacuum Oven Productivity Enhancement System.
Summer Student 2003Ferro Livia1. Summer Student 2003Ferro Livia2 Contents Experimental setup Thermal behaviour and cooling performance of the TOB structures.
Testing of Highly Accurate Blackbodies Harri Latvakoski Mike Watson Shane Topham Mike Wojcik SDL/
Hot Disk Transient Plane Source (TPS) Technique
Calibration of a Thermistor Voltage Divider Portland State University Department of Mechanical Engineering ME 121: Engineering Problem Solving.
2003 NCSL INTERNATIONAL ANNUAL WORKSHOP AND SYMPOSIUM TAMPA, FLORIDA INAMPUDI L. KOWLINI, Dr. HARISH CHERUKURI, Dr. EDWARD MORSE & Dr. KEVIN LAWTON THE.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
Linescanner MP150 Infrared Temperature Measurement for Quality Control and Process Automation Raytek Confidential 10/2010, Rev. B.
ATLAS Internal ID Service Integration
TEMPERATURE DISTRIBUTION ACROSS THE EXTENDED SURFACE
KEYWORD FLASH - CARDS Topic: TEMPERATURE
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
Mission Statement... The Space Wolverines will;
PS3D culture Polycarbonate filter, 0.2µm
Thunderbird Water Pump Upgrade
Barrel TRT Module Cooling
Date of download: 11/11/2017 Copyright © ASME. All rights reserved.
LAT Requirements Verification in TVAC
VISUAL AIDS for instruction in VACUUM TECHNOLOGY AND APPLICATIONS
GIFTS System Calibration Requirements Flowdown
Tests on a dummy facet of PIX upgrade using CO2 cooling
GIFTS Blackbody Subsystem Critical Design Review Blackbody Requirements Flowdown Fred Best 9 March 2004.
THERMAL CONTROL SYSTEM
Conductors and Insulators (1:46)
3 x Transformer boards ISO View Fans Oriented as in Super Micro Case
Presentation transcript:

9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Temperature Uncertainty Budget and Calibration Fred Best 9 March 2004

9 March 2004 Slide 2 Temperature Error Budget

9 March 2004 Slide 3 Blackbody Section – Side View Enclosure Tube (Aluminum) Front Cover (Alum) Multi-layer Insulation (not shown) Cavity Support/ Insulator (Noryl) Electrical Connector Mounting Base (Noryl) Circumferental Heater Thermistors 4 Temperature Measurement 2 Redundant Temp Control 1 Overtemp Blackbody Cavity (Aluminum) Chemglaze Z306 Paint

9 March 2004 Slide 4 Blackbody Temperature Calibration Configuration

9 March 2004 Slide 5 GIFTS BB Calibration Scheme

9 March 2004 Slide 6 Blackbody Temperature Calibration The Blackbody and Controller will undergo end- to-end calibration. The temperature of the Blackbody and Controller can be independently controlled. Ambient Blackbody calibrated over the range from: -40 C to 0 C. Hot Blackbody calibrated over the range from: 0 C to +40 C. For calibration the Controller will be maintained at near 0 C. {The system will be calibrated at other Controller temperatures if a temperature dependence is discovered during EM-2 testing.

9 March 2004 Slide 7 Temperature Calibration Standard Absolute Temperature Calibration of end- to-end System at Hart has Uncertainty Of +/ K (k=2) Thermometrics SP-60 Probes (2) Hart 2563 Standard Thermistor Module Hart 2564 Thermistor Scanner Module Hart 3560 Extended Communications Module Calibration Computer