GOES-R Program Calibration and Validation (Cal/Val) Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (2), Steve Goodman (1), Changyong Cao (3), Jaime Daniels.

Slides:



Advertisements
Similar presentations
GOES-R Program Calibration and Validation Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (1), Steve Goodman (2), Changyong Cao (3), Jaime Daniels (3),
Advertisements

Brown Bag Lunch Lecture ABI Calibration
1 Scott Gudes Vice President, Legislative Affairs Space Systems & Operations Interdepartmental Hurricane Conference March 2, 2011 W A S H I N G T O N O.
Greg Mandt GOES-R System Program Director 2011 Satellite Direct Readout Conference April 5, 2011.
Reflected Solar Calibration Demonstration System Update J. McCorkel K. Thome D. Jennings B. McAndrew J. Hair D. Rabin A. Daw National Aeronautics and Space.
Geostationary Operational Environmental Satellite (GOES) R Series Anthony Comberiate System Program Director April 2006 Program Overview.
Greg Mandt GOES-R System Program Director 2011 GOES-R Proving Ground Annual Meeting Boulder, CO May 17, 2011.
1 GOES-R Calibration Working Group (CWG) June 16, 2010 Presented By: Changyong Cao 1 NOAA/NESDIS/STAR CWG Progress Update.
An Overview of the GOES-R Program
Bob Iacovazzi Jr. September 20, 2011 GOES-R GLM Calibration GLM Science Meeting 2011.
Calibration Working Group L1b Cal/Val Update 1 Presented by Changyong Cao NOAA/NESDIS/STAR GOES-R Calibration Working Group January 9, 2014.
July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006 Plan for calibration and maintenance of AHAB Uncertainty Budget: Laboratory.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Sensor Calibration/Validation.
Bob Iacovazzi, Jr. GOES-R POSST Ops Manager (POM) January 9-10, 2014 GOES-R Product Operations Science Support Team: Planning for GOES-R Cal/Val AWG Second.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
March 26, 2014 Space Weather Product Team (SWPT) Kick Off Meeting.
GOES-R Calibration & Validation Update
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
GOES-R Instrument Operations Hal Bloom GOES-R Program January 2009 AMS Conference.
2-5 December 2003 International Workshop on Radiometric and Geometric Calibration 1 System Level Approach to Characterization and Radiometric Calibration.
Thanks also to… Tom Wrublewski, NOAA Liaison Office Steve Kirkner, GOES Program Office Scott Bachmeier, CIMSS Ed Miller, NOAA Liaison Office Eric Chipman,
1 Requirements Gathering, Validation, and Concept Studies GOES Users’ Conference Boulder, CO October 1-3, 2002.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Overview of the “Geostationary Earth Radiation Budget (GERB)” Experience. Nicolas Clerbaux Royal Meteorological Institute of Belgium (RMIB) In collaboration.
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
Investigating the use of Deep Convective Clouds (DCCs) to monitor on-orbit performance of the Geostationary Lightning Mapper (GLM) using Lightning Imaging.
2015 AMS Annual Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES- R.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
Near-Real-Time Simulated ABI Imagery for User Readiness, Retrieval Algorithm Evaluation and Model Verification Tom Greenwald, Brad Pierce*, Jason Otkin,
1 Reflected Solar Calibration Demonstration System - SOLARIS K. Thome, D. Jennings, B. McAndrew, J. McCorkel, P. Thompson NASA/GSFC.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 The GOES-14 Science Test Timothy Schmit (GOVERNMENT PRINCIPAL INVESTIGATOR)
1 Solar / Geophysics – 23 February 2015 Solar / Geophysics W. Denig, Chief Solar & Terrestrial Physics Division NOAA/NESDIS/NGDC
V: Instrument & Product Calibration / Validation
Greg Mandt GOES-R System Program Director 2011 OCONUS MEETING July 26, 2011.
SeaWiFS Calibration & Validation Strategy & Results Charles R. McClain SeaWiFS Project Scientist NASA/Goddard Space Flight Center February 11, 2004.
GLM Annual Science Team Meeting Cal/Val Tools Developers Forum 9-11 September 2015 GLM PLT & Cal/Val Status William Koshak, NASA/MSFC.
What does it cover? This session addresses “Why?”, “When?”, and “What Sensors?” will be on GOES- R, and presents examples of what to expect. If is a look.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Double Differences of BTs in AVHRR Ch4 from MICROS Climate Quality Calibration.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS Non-Meteorological Application for Himawari-8 Presented.
5th GOES Users’ Conference, New Orleans, January 2008 Geostationary satellites in a WMO perspective Jérôme Lafeuille WMO Space Programme World Meteorological.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
1 CLARREO Advances in Reflected Solar Spectra Calibration Accuracy K. Thome 1, N. Fox 2, G. Kopp 3, J. McCorkel 1, P. Pilewskie 3 1 NASA/Goddard Space.
NOAA GPRC Report 2013 GSICS Annual Meeting Williamsburg, VA 03/04/ /08/2013.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
NWA Annual Meeting Joint Satellite Workshop
Pre-launch Characteristics and Calibration
NOAA VIIRS Team GIRO Implementation Updates
Fangfang Yu, Fuzhong Weng, Xiangqian Wu, and Ninghai Sun
NESDIS-JMA AHI Collaboration
VIS/NIR reference instrument requirements
Lunar observation data set preparation
Technical Expectations from Organizers & Participants B. Fougnie, S
Fangfang Yu and Xiangqian Wu
Enterprise Algorithm Change Process
TEMPO Instrument Update
GOES-16 ABI Lunar Data Preparation to GIRO
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
Fangfang Yu and Fred Wu 22 March 2011
MODIS Lunar Calibration Data Preparation and Results for GIRO Testing
GOES-R Hyperspectral Environmental Suite (HES) Requirements
Data Preparation for ASTER
Using the Moon for Sensor Calibration Inter- comparisons
NOAA Satellite Cal/Val Progress Update
NOAA-KMA Collaboration on Imager Midnight IR Calibration Anomaly
GOES-R Program Systems Engineering (PSE) Cal/Val Lead
Use of GSICS to Improve Operational Radiometric Calibration
goes-16/17 abi lunar calibration
G16 vs. G17 IR Inter-comparison: Some Experiences and Lessons from validation toward GEO-GEO Inter-calibration Fangfang Yu, Xiangqian Wu, Hyelim Yoo and.
Presentation transcript:

GOES-R Program Calibration and Validation (Cal/Val) Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (2), Steve Goodman (1), Changyong Cao (3), Jaime Daniels (3), Kathleen McIntyre (2), Joe Zajic (1) NOAA/NESDIS/GOES-R (1), NASA (2), NOAA/NESDIS/STAR (3) Physical Address - NASA GSFC, Code 417.0, Greenbelt, MD PRE-LAUNCH INSTRUMENT CALIBRATION Spare Visual & IR Imagery Lightning Mapping Space Weather Monitoring Advanced Baseline Imager (ABI) Geostationary Lightning Mapper (GLM) Space Environment in- Situ Sensor Suite (SEISS) Magnetometer (MAG) Solar Ultra-Violet Imager (SUVI) Extreme UV/X-Ray Irradiance Sensors (EXIS) Earth Pointing Sun Pointing In-Situ GOES-R is the next generation of GOES satellites that will provide a major improvement in quality, quantity, and timeliness of data collected. GOES-R INSTRUMENTS Solar Imaging Instrument Calibration Data PG (L2+ ABI) L1b, L2+ Data GRB Product Monitor and PG Product Performance Monitor & Development Environment (WCDAS Only) Product Distr. & Access (PDA) WAN Link to Wallops Command & Data Acquisition Systems (WCDAS)/Remote Back-Up (RBU) Instr. Cal Data CLASS Storage GOES-R L0 Data Pre-launch Data & Data from other satellite assets, field measurements, NWP model output GRB – L1b and L2+ GLM Subject Matter Expert Analysis Mission Manage- ment (MM) External Near-real-time Performance Monitoring/Visualization “Deep-dive” Cal Analysis Updated Cal Tables Instrument Data Acquisition Request Cal/Val PLT Reports L1b Validation Stats and Anomaly Resolution Methods Deep-Dive Tools Operations Managers and Engineers, Vendor Support National Satellite Operations Facility (NSOF) GOES-R Calibration Working Group (CWG) Members CWG Org Network Links CWG Org Net- work Links Ground Segment External Support Agencies Government Validation of Cal Testing Flight Project and Calibration Working Group Provide feedback regarding vendor cal test plans and readiness Analyze vendor cal test reports US National Institute of Standards and Technology (NIST) Support planning for Système international d'unités (International System of Units - SI) traceable calibrations of ABI and EXIS Review vendor cal plans and test setups Establish SI-traceability to primary standards through NIST supported testing, e.g.,  Validation of ABI filter SRF  Characterization of ABI end-to-end spectral response using Traveling SIRCUS  Characterization of ABI vendor’s integration spheres at FASCAL2  Characterization of external blackbody via thermal transfer radiometer (TXR)  Validation of the ABI vendor’s FEL lamps  End-to-end calibrations of EXIS at SURF-III/Beamline 2 NIST Synchrotron Ultraviolet Radiation Facility (SURF-III) Facility NIST Spectral Irradiance and Radiance responsivity Calibrations using Uniform Sources (SIRCUS) Vendor Cal Gov’t Instr Manager Gov’t CWG/Flight Cal Validaton Cal Reports and RFA Responses Portal Cal Analysis and RFAs Cal Reports/Analysis and RFA/RFA Responses Instrument Calibration Objectives: Verify that instrument calibration and product requirements are satisfied Determine values of semi-static instrument parameters Ensure pre-launch instrument performance is well understood and documented for possible application to on-orbit anomaly resolution PRE-LAUNCH L1B ALGORITHM DEVELOPMENT POST-LAUNCH CAL/VAL Calibration testing and review process (RFA – Request for Action) Radiometric Characterization & Calibration Spectral ResponseImage Navigation & Registration Spatial Resolution & Response System linearity and dynamic range Signal-to-Noise, NEDN, and Coherent Noise Pixel-to-pixel, swath-to-swath, channel-to- channel-, image-to-image, and blackbody calibration-to-calibration repeatability Irradiance to radiance transfer (VNIR) External/Internal calibration target comparison (TIR) Polarization (VNIR) Channel-to-channel and within channel optical cross talk Electronic cross talk In-flight electronic calibration Blooming Quantization step size Hot, marginal and dead pixels Spectral response function (SRF) envelope SRF uniformity over the focal plane detector array Out-of-band response SRF uncertainty Inference of possible SRF shifts Consistency between system-level and integrated component-level SRF Navigation (including star sensing) Frame-to-frame, within frame, swath-to-swath, and channel-to- channel registration System modulation transfer function Spatial response uniformity (e.g., response vs. scan angle) Ringing from a sharp edge Near field scatter Far field scatter Ghosting Pointing knowledge ABI vendor instrument calibration testing GOES-R PROGRAM-LEVEL CAL/VAL PLANS, COLLABORATORS, AND ACTIVITIES Instr and L1b Dev Sat and L1b I&T PLT ACT PLT SPOT Ops Instr and Ground Segment Design Review Instr Cal and Cal Test Report Review L1b Dev and Implementation Pre-launch End-to-End Testing and Post- Launch Cal/Val Preparation Cal/Val On-Orbit Checkout Cal Param and L1b Alg Anomaly Res and Updates “Deep-Dive” Cal/Val Analysis Tools Cal Trending Initialization & Long-term monitoring L1b Validation OSPO Responsible STAR/NGDC/ MSFC Support Vendor Support as Requested Mission CDR LAUNCH Observatory Development Flight Oversight CCT/CWG/OSPO Support Instr. Vendor Responsible Flight/MOST Responsible CCT/CWG/OSPO Support Instr. Vendor Support Ground Segment Development GSP Oversight CCT/CWG/OSPO Support GS Vendor Responsible GSP/MOST/DOST Responsible CCT/CWG/OSPO Support GS Vendor Support Long-term Cal/Val Readiness STAR/NGDC/MSFC Responsible PSE CCT/CWG Responsible MOST/DOST Support Scope, Organizations & Working Groups, Roles & Responsibilities, Resources, and Schedules Calibration and Product Validation Strategy Cal/Val Plan Vol. 1: L1b Data Cal/Val Plan Vol 2: L2+ Product Val Major GOES-R Cal/Val-related Activities in Each Mission Phase [Dev – Development; I&T – Integration and Test; PLT ACT – Post-launch Testing (PLT) Activation and Characterization Test; PLT SPOT – PLT System Performance Operational Test; Ops – Operations] L1b Tiger Team Mandate Proactively identify and mitigate risks associated with implementing GFP L1b algorithms L1b Tiger Team Meetings Instr. Vendor L1b Dev Gov’t Instr Manager Gov’t CWG/Flight L1b Validaton L1b Alg and Test Data and RFA Responses Portal RFA & RFA Responses L1b Alg Reviews and RFA Gov’t GS Manager L1b Alg and Test Data and RFA Responses RFA & RFA Responses L1b Alg and Test Data and RFA Responses GLM Data ABI Data Space Weather Data Fill Packets Mbps GOES-R DATA THROUGHPUT GOES-R PRODUCTS Level 1b (L1b) Products (9) Level 2+ (L2+) Products [from ABI (24) & from GLM (1)] Calibration is applied to GOES-R raw instrument data to transform them into L1b measurements … the fundamental building blocks for all L2+ products. ABI provides 3x spectral, 4x coverage, and 5x temporal resolution of current imager GOES-R Cal/Val Collaborators Flight Project - Gov’t oversight of SC/Instr. Development SC/Instr Vendor - SC/Instr. Development Ground Segment (GS) Project (GSP) - Gov’t oversight of GS Development GS Vendor - GS Development Mission Ops Support Team (MOST) - Gov’t SC/Instr/GS Testing Data Ops Support Team (DOST) - Gov’t GS Testing Cal Coordination Team (CCT) - Gov’t Cal/L1b Val Management Cal Working Group (CWG) - Gov’t Cal/L1b Val Technical Support Algorithm Working Group (AWG) - L2+ Product Dev and V&V NESDIS Office of Satellite and Product Operations (OSPO) - Ops Support to Cal/Val Validation provides user confidence that GOES-R data can be used for their intended purpose, e.g., weather forecasting or numerical weather prediction. L1b algorithm evolution process (RFA – Request for Action) Key L1b algorithm quality assurance activities Evaluate L1b algorithm completeness Identify and track L1b algorithm issues to be resolved by the developer Assess fidelity of L1b algorithm implementation by the GS vendor Develop instrument calibration data and product metadata definitions On-Board Cal DevicesVicarious Targets Space-based Inter- Calibration ABI IR Cal 0.1K all but 13.3  m, 0.3K for 13.3  m ) – Blackbody VNIR Cal (5%) - Solar Diffuser Self-Emission - Space View Electronics Linearity - Electronic Stimulus VNIR Cal - Moon, Stars, Deserts, Test Sites, Deep Convective Clouds (DCCs), Rayliegh Scattering, etc. MTF, B2B Reg - Moon VNIR/IR Cal - GEO and LEO Imagers Spectral Cal – Hyperspectral Sounders GLM NoneResponse Cal - DCCs, Deserts, Sun-glint Response Cal - GEO and LEO Imagers EXIS Response Linearity - Light Sources Dark Measurements and Flatfields - Off-point Mechanism Electronics Linearity - Electronic Stimulus Response Flatfield - Sun Response Cal – GEO Solar Sensors SUVI Aliveness - Light Source Dark Measurements and Flatfields - Off-point Mechanism Out-of-band Rejection - Glass/Analysis Filters Electronics Linearity - Electronic Stimulus Response Flatfield - Sun Response Cal - EXIS and other GEO Solar Sensors (e.g., SDO/EVE) SEISS Electronics Linearity - Electronic Stimulus NoneResponse Cal – GEO Particle Sensors MAG Electronics Linearity - Electronic Stimulus NoneResponse Cal - GEO Mag Sensors GOES-R observatory on-orbit cal/val assets GOES-R cal/val infrastructure Calibration input parameter evaluation GOES-10 Ch. 4A Corrected and uncorrected Radiance vs. scan angle. (Beaucom et al., Proceedings of SPIE, 1999) Radiance [mW/(m^2-sr-cm^-1)] GS Vendor L1b Implem (Wu et al., GSICS Monthly Web Seminar, Dec. 2011, Development/ ) Long-term product monitoring Application of ABI long-term radiometric performance tool to GOES-10 Imager VNIR channel. GOES-10 ATC WCDAS /RBU Link via WAN GOES-13 Hemispheric Image Tiles Product quality evaluation Ch. 2 Ch. 3 Ch. 5Ch. 4 On-board calibration system evaluation Instrument Noise, Blackbody Temp and Cal Slope Monitoring On-orbit calibration and L1b anomaly resolution GOES-13 Eclipse Season Stray Light Before Fix (Top) and After Fix (Bottom) (Courtesy of J. Paul Douglas, OSPO) Application of GLM Long-term Radiometric Performance tool to the Tropical Rainfall Measuring Mission Lightning Imaging Sensor (LIS). Application of ABI Co-Registration Validation tool to the GOES Imager. Cal/Val Methods and Processes