PLATO Telescope Optical Units Meeting in Bern March 12 th 2010.

Slides:



Advertisements
Similar presentations
Welcome & Introduction
Advertisements

Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.
Isabella Pagano & Roberto Ragazzoni -
Telescope Optical Units (TOUs)
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
Demetrio Magrin INAF – Astronomical Observatory of Padova Optical Design Catania, 11/06/2014.
Daniele Piazza PLATO TOU Meeting, Catania, PLATO - TOU Mechanical Design & Future Activities Osservatorio Astronomico – Catania June 11 th,
Project Management: A Critical Skill for Organizations Presented by Hetty Baiz Project Office Princeton University.
Stepan Potiyenko ISS Sr.SW Developer.
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
PPA 502 – Program Evaluation Lecture 5b – Collecting Data from Agency Records.
SDW2005, juin, Taormina The Corot Space instrument.
Chapter 2- Software Process Lecture 4. Software Engineering We have specified the problem domain – industrial strength software – Besides delivering the.
S ECRETARIAT Division Secretariat Advisory Preparing Meeting Agendas & Minutes Presented by Myron Iseminger.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Instructional Design Eyad Hakami. Instructional Design Instructional design is a systematic process by which educational materials are created, developed,
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
Agenda Teams Responsibilities Timeline Homework and next steps.
1 BTS330 Vision and Scope. √ Determine a vision for the business √ Create initial use-case model showing key actors and use cases by business area Benefits.
ISO9001 Pre Assessment Team 10 PT Han Jian Da, Alphy Thomas Kanatt, Xia Xi, Wu Jun, May Lwin, Chit Khun, Mohit Srivastava, Kovalan Venkatesan.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
European Commission, Technical Assistance Information Exchange Unit (TAIEX), DG Enlargement in co-operation with The Bulgarian Chamber of Commerce and.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
MICE Target - Risk Lara Howlett University of Sheffield.
Who Tagged This?!!! Ken Black, CPPM Texas Department of State Health Services (or didn’t tag it)
Association of Childrens Welfare Agencies Conference 2006 Improving Care Through Accreditation- The Role of the NSW Children’s Guardian.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Beam screens in IT phase 1
Getting it Right for Every Child The Child and Young Person’s Record Stella Perrott Scottish Executive Symposium 30 th January 2007.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
Educational Measurement and School Accountability Directorate School Online Assessment Registration (SOAR) Phase 1 training.
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Software Project Management Lecture # 2 Originally shared for: mashhoood.webs.com.
Systematic Review: Interpreting Results and Identifying Gaps October 17, 2012.
Roberto Ragazzoni INAF – Astronomical Observatory of Padova PLATO: the TOUs (Telescope Optical Units) Kick Off Meeting KOM-Paris,
Telescope Optical Units (TOUs) Isabella Pagano (TOU PM) TOU Team Meeting Catania 11 June 2014.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
AN UPDATE ON THE EVALUATION OF THE PERFORMANCE OF HEADS OF DEPARTMENT IN THE PUBLIC SERVICE Presentation to the Portfolio Committee on Public Service and.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Returns Guide Returning your goods is a simple 2 step process: Step 1# Your returns Paperwork - This ensures your refunded for any item being returned.
Welcome HEADTEACHERS AND CHAIRS WORKING TOGETHER WORKSHOP.
For the CMS Pixel detector
Thermal Analysis in Zemax
TOU Team PLATO Consortium Campi Bisenzio, 12 Dec 2016.
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
DG Environment, Unit D.2 Marine Environment and Water Industry
Electronics: Demod + 4Q FE
Copyright © Simon Wallace
Release 3 Plan Options Decision
Release 3 Plan Options Analysis
ETS Working Group: January 2006 Item 10
AICT5 – eProject Project Planning for ICT
For the CMS Pixel detector
Presentation transcript:

PLATO Telescope Optical Units Meeting in Bern March 12 th 2010

(proposed) Agenda 9:15 Welcome & scope of the meeting (Ragazzoni) 9:25 Optical design status (Magrin) 9:55 Radhard glass affaire (Ragazzoni) 10:15 Mechanical design status (Piazza) 10:45 Coffee break (careful in Swiss you get 2 coffes..) 11:00 AIV and prototype activity (Farinato) 11:30 Discussion on prototyping (All) 12:15 Setting up of next steps (Catala +All)

Scope of the meeting By 22 nd of March we are supposed to deliver to ESA a nominal design and a plan for prototyping Consolidating (or defining policy to achieve such a goal) the nominal design Protoyping activity is “to be assessed if necessary” accordingly to the ESA document (Nov 12 th 2009) Furthermore in view of talks with industry we should start to establish how TOUs will be splitted among the Alps…

Rad Hard glasses business From beginning we setup an internal catalog of radhard glasses BaF2 was among them and was selected as front lens BaF2 was (properly) criticized and dropped after the Yellow Book released Instead S-FPL-51 by Ohara was choosen for front lesn Other lenses assumed being shielded by 3mm Alluminum

Rad Hard glasses business Thaless design used the same glass as front lens Prophetical words extracted from ESA doc. SRE-PA/ (Nov ): “…radiation hardness.. may generate surprise in the detailed design phase.” Analysis of the L2 environment with a simplified model of the tubes commenced several weeks ago…

Rad Hard glasses business …but (detailed) outcome only yesterday (sigh…). Radation dose in L2 is 3.5 krad/yr inside the tube and 55 krad/yr for the front lens Inside lenses: only one lens significantly affected (dropping transparency to and in 3 years) Outside lens: dramatic deterioration to, and

Rad Hard glasses business The inside lens can be easily substitude by its rad-hard counterpart The front lens glass is to be replaced but this requires careful re-optimization We are confident this can be done in a week time span, but this requires here we define policy on how to choose rather than taking a final decision.

Other issues raised by the ESA document…??? Main concern is on CCD (optomechanics is 2 nd place) and assumes prototyping is being done in the coming year. Criticism of taking Thaless as starting ref. already largely discussed in ESA Pointing stability (but this is to be taken into account by the bus industrial studies) Suggestion of the aspheric being a pure conical is a good one but unfortunatley unfeasible (but we take as action to consider designing a null-lens in our study)

Other issues raised by the ESA document…??? Further to rad hardness “thermal performances and stability at low temperature not properly taken into account” so we take the action to discuss this item with our Milan collegues. “Studying optical methods of assembling optics in barrel segments” is already in place It is missing a “full verification at P/L system level” criticism that we have to take seriously in the coming time