Status of ATLAS commissioning IPRD08 - 11th Topical Seminar on Innovative Particle and Radiation Detectors 1 - 4 October 2008 Siena, Italy Sandro Palestini,

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

ATLAS Trigger "sur le terrain" Physique ATLAS France Evian Octobre 2009 C. Clément (Stockholm University) Evian, Octobre 2009 ATLAS Trigger.
ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
1 Japanese activities in LHC Takahiko Kondo, KEK November 28, 2005 KEK-DESY 1st Collaboration Meeting in Tokyo.
10/26/2005 ATLAS Visit Dr Pierre Coulombe President, National Research Council Canada Short introduction by Peter Jenni and Robert Orr.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Pascal PERRODO, ATLAS-LAPP
The ATLAS B physics trigger
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
ATLAS detector commissioning with cosmics and first beam Alessandro Cerri on behalf of the ATLAS collaboration.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Roger Jones: The ATLAS Experiment Ankara, Turkey - 2 May The ATLAS Experiment Roger Jones Lancaster University.
. APS meeting April 14 h, ATLAS Detector – status and plans David Lissauer Brookhaven National Lab. ATLAS Technical Coordination APS meeting April.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
1 ATLAS installation: Status about 3 years ago…. 2 ATLAS installation: Status half a years ago…
Andrea Ventura University of Salento & INFN Lecce on behalf of the ATLAS Collaboration New Trends in High-Energy Physics Alushta, Crimea, Ukraine, September.
Taming the beast: Using Python To Control ATLAS Software David Quarrie NERSC Division Lawrence Berkeley National Laboratory 3 July 2006.
The Large Hadron Collider project is a global scientific adventure, combining the accelerator, a worldwide computing grid and the experiments, initiated.
Status of ATLAS and preparation for the Pb-Pb run QM 2009, Knoxville Jiří Dolejší Charles University Prague for the ATLAS collaboration.
1 Status of ATLAS 99 th LHCC –23 September th LHCC - Open Session 23 September 2009 C. Clement (Stockholm University) on Behalf of the ATLAS Collaboration.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
8 June 2006V. Niess- CALOR Chicago1 The Simulation of the ATLAS Liquid Argon Calorimetry V. Niess CPPM - IN2P3/CNRS - U. Méditerranée – France On.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
January 21, 2003 Transition from the Construction Project to Pre-Ops and Operations Howard Gordon.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
2003 Conference for Computing in High Energy and Nuclear Physics La Jolla, California Giovanna Lehmann - CERN EP/ATD The DataFlow of the ATLAS Trigger.
ATLAS, ATLAS through first data Fabiola Gianotti (on behalf of the ATLAS Collaboration)
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
TAU08, NovosibirskM. Pilar Casado (IFAE & UAB) 1 ATLAS Tau Trigger Belanger-Champagne, C; Benslama, K; Bosman, M; Brenner, R; Casado, MP; Czyczula, Z;
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
First CMS Results with LHC Beam
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai, Kazuhiko Hara (Univ. of.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Kostas KORDAS INFN – Frascati 10th Topical Seminar on Innovative Particle & Radiation Detectors (IPRD06) Siena, 1-5 Oct The ATLAS Data Acquisition.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
7/6/20101L. Rossi – IPRD10 - Siena Leonardo Rossi (INFN Genova) on behalf of the ATLAS Collaboration IPRD10, Siena, June 7, 2010 ATLAS Status Brief recall.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Establishing large international research facilities: the HEP case 1st ASEPS Summit Tsukuba March 25, 2010 Sergio Bertolucci CERN LHC.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Searching for Compositeness with ATLAS Kaushik De University of Texas at Arlington For the ATLAS Collaboration DPF/JPS 2006, Hawaii November 1, 2006.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
DOE/NSF Project Experience Key Ingredients to Success
ATLAS as an example of a large scientific collaboration
Depleted CMOS Pixel Detectors
ATLAS through first data
CMS muon detectors and muon system performance
for the transition region on behalf of the RPC upgrade group
Kevin Burkett Harvard University June 12, 2001
ATLAS Muon Spectrometer and
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
The First-Level Trigger of ATLAS
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Presentation transcript:

Status of ATLAS commissioning IPRD th Topical Seminar on Innovative Particle and Radiation Detectors October 2008 Siena, Italy Sandro Palestini, CERN for the ATLAS Collaboration

2 15-April-2008 ATLAS RRB 2 37 Countries 169 Institutions 2500 Scientific Authors total Talk presented on behalf of the ATLAS Collaboration 1 Oct 2008S. Palestini: ATLAS Albany, Alberta, NIKHEF Amsterdam, Ankara, LAPP Annecy, Argonne NL, Arizona, UT Arlington, Athens, NTU Athens, Baku, IFAE Barcelona, Belgrade, Bergen, Berkeley LBL and UC, HU Berlin, Bern, Birmingham, UAN Bogota, Bologna, Bonn, Boston, Brandeis, Bratislava/SAS Kosice, Brookhaven NL, Buenos Aires, Bucharest, Cambridge, Carleton, Casablanca/Rabat, CERN, Chinese Cluster, Chicago, Chile,Clermont-Ferrand, Columbia, NBI Copenhagen, Cosenza, AGH UST Cracow, IFJ PAN Cracow, UT Dallas, DESY, Dortmund, TU Dresden, JINR Dubna, Duke, Frascati, Freiburg, Geneva, Genoa, Giessen, Glasgow, Göttingen, LPSC Grenoble, Technion Haifa, Hampton, Harvard, Heidelberg, Hiroshima, Hiroshima IT, Indiana, Innsbruck, Iowa SU, Irvine UC, Istanbul Bogazici, KEK, Kobe, Kyoto, Kyoto UE, Lancaster, UN La Plata, Lecce, Lisbon LIP, Liverpool, Ljubljana, QMW London, RHBNC London, UC London, Lund, UA Madrid, Mainz, Manchester, CPPM Marseille, Massachusetts, MIT, Melbourne, Michigan, Michigan SU, Milano, Minsk NAS, Minsk NCPHEP, Montreal, McGill Montreal, FIAN Moscow, ITEP Moscow, MEPhI Moscow, MSU Moscow, Munich LMU, MPI Munich, Nagasaki IAS, Nagoya, Naples, New Mexico, New York, Nijmegen, BINP Novosibirsk, Ohio SU, Okayama, Oklahoma, Oklahoma SU, Olomouc, Oregon, LAL Orsay, Osaka, Oslo, Oxford,Paris VI and VII, Pavia, Pennsylvania, Pisa, Pittsburgh, CAS Prague, CU Prague, TU Prague, IHEP Protvino, Regina, Ritsumeikan, UFRJ Rio de Janeiro, Rome I, Rome II, Rome III, Rutherford Appleton Laboratory, DAPNIA Saclay, Santa Cruz UC, Sheffield, Shinshu, Siegen, Simon Fraser Burnaby, SLAC, Southern Methodist Dallas, NPI Petersburg, Stockholm, KTH Stockholm, Stony Brook, Sydney, AS Taipei, Tbilisi, Tel Aviv, Thessaloniki, Tokyo ICEPP, Tokyo MU, Toronto, TRIUMF, Tsukuba, Tufts, Udine/ICTP, Uppsala, Urbana UI, Valencia, UBC Vancouver, Victoria, Washington, Weizmann Rehovot, FH Wiener Neustadt, Wisconsin, Wuppertal, Würzburg, Yale, Yerevan

Outline Last phases of detector installation Tests of full magnet system Detector commissioning Combined cosmic runs DAQ/data flow Commissioning of computing model Preparation of physics studies Experience with first beams on Sept Oct 20083S. Palestini: ATLAS

The ATLAS detector 24 m 45 m 7000 T 1 Oct 20084S. Palestini: ATLAS Ref.: “The ATLAS Experiment at the CERN LHC”, 2008 JINST 3 S08003 (

Installation of the last components Installation of Small Wheels of Muon End- Cap in Feb- Mar 08 Cabling of Pixel detector in spring 08 Completion of outer station of Muon End-Cap in June 08 LHC beam-pipe closed in June 08 1 Oct 20085

6 Test of the full magnet system Test of End-Cap Toroid side A on July 20 (after leak repair) Test of Barrel Toroid and Solenoid on July Test of all (3) Toroids together on Aug 4 All magnets (4) tested together tested together repeatedly from on Aug / 7.63 kA

Detector commissioning The commissioning of the detector started in 2006 with the first Milestone Run and Technical Runs: – Operate together the various subsystems (with local and central Detector Control System), verify stability of hardware – Develop and test data monitoring – Check channel mapping, noise, timing – Integrate into DAQ – Commission and operate trigger systems (cosmic rays) – Develop and test calibration procedures – Acquire and process data, make first test of track-based calibration and alignment 1 Oct 20087S. Palestini: ATLAS

Inner Detector Design and goals: Si pixels, Si strips, straw tubes, |  |<2.5 (<2 TRT) Pixel: 80 M channels, 3 layers SCT: 8 layers, stereo pairs, 6.3 M ch. TRT: 350 k ch., typically 36 hits/track, transition radiation (e/  : GeV) Operate in 2 T solenoid field  p T /p T  0.05% p T  1% Status of commissioning: Pixel delayed by difficulties with cooling, could only start in August after beam-pipe bake-out Currently 94 % of the module are active Cosmic ray tracks have been detected together with SCT from mid-September. 6+1 points in Pixel, 8 points in SCT 1 Oct 20088S. Palestini: ATLAS

TRT commissioning Hit map (many events) in TRT/barrel, projected to z = 0, from cosmic-ray run in June 08. Color maps different track time (within  35 ns, due different triggering devices). 1 Oct 20089S. Palestini: ATLAS

Design: “Barrel” calorimeters Electromagnetic: |  |<3.2 Lead-liquid argon, 3 sampling depths in precision region |  |<2.5; Presampler |  |<1.8 ~175k channels Hadronic: Barrel: steel-scintillating tiles |  |<1.7, 3 sampling depths, 10k channels Endcap: 1.5<|  |<3.2, copper-liquid Ar, 4 sampling depths, 6k channels Forward: 3.1<|  |<4.9 (1 Copper+2 tungsten)-liquid Ar depths for e.m. and hadronic measurements, 3.5k channels Calorimeters Goals: precision measurements of e/  for |  |<2.5  /E ~ 10%/  E  0.7% Linearity to ~0.1% Coarser granularity in the forward region Total energy resolution for Jet and E T miss measurements  /E ~ 50%/  E  3% (barrel/endcap)  /E ~ 100%/  E  10% (forward)

Calorimeters commissioning Stability LAr Barrel side A: Difference of amplitude between two calibration runs taken one week apart vs. channel number (14*32 FEB channels each) LAr dead/noisy channels: – Dead channels: EMB: 0.5%, EMEC: 0.2%, HEC (15%), FCAL (0%) – Noisy channels: > 10  w.r.t.  average: 0.003% Between 5  and 10  : 0.09% – Uncalibrated or badly calibrated channels: 0.3 / 0.2 % – Most problems recoverable during a shutdown (exchange of FEB) Tile muon cosmics Muon in LAr Muons in calorimeters: energy scale and uniformity verified at  2 % Tile timing corrections:  triggered by RPC’s

Muon Spectrometer Air-core toroid magnet system Barrel: ~ Tm in 0<|  |<1.4 Endcaps: ~1-7.5 Tm in 1.6<|  |<2.7 Precision tracking chambers Track coordinate in bending plane 3 barrel layers, 3 end-cap wheels ~370k readout channels Monitored Drift Tubes (MDT) |  |<2.7 (innermost layer |  |<2.0) Cathode Strip Chambers (CSC) innermost layer 2.0<|  |<2.7 Trigger chambers Bunch-crossing ID, triggering, coordinate orthogonal to tracking measurement ~680k readout channels Resistive Plate Chambers (RPC) |  |< double layers Thin Gap Chambers (TGC) (4+4 wheels) 1.05<|  |<2.7 (2.4 for triggering) MDT Big Wheel (Intermediate EndCap station) during installation 1 Oct S. Palestini: ATLAS

Muon spectrometer commissioning Correlation between MDT and RPC hits in cosmic data Ready Missing timing adjustment Missing CAEN boards Noise on clock propagation Commissioning of RPC sectors track projections from RPCs to surface 1 Oct S. Palestini: ATLAS

TGC chambers Red : Previous Black : Current Blue : Next Green : Current or next Efficiency with hits at “current” or “next” bunch-crossing: r Flammable gas system allowed only since July 2008: very low efficiency before that time. Studies of efficiency (and timing) started recently and are still underway. 1 Oct S. Palestini: ATLAS

Muon alignment system The support structures in our air- core toroid are light enough that the relative alignment of the Muon stations changes with time (e.g.: turning on/off the magnets, temperature variations – effects  0.1 – 1 mm) Need alignment system (optical devices, calibrated and accurately positioned on chambers to determine the geometry of the spectrometer. Barrel: limitations in positioning accuracy and calibration requires that the alignment system will be used in relative mode, referred to alignement data and tracks measured with toroids off. EndCap: the implementation has been accurate enough so that the geometry of the spectro- meter can be achieved from the alignment system alone (absolute mode) with precision as good as  40  m in the bending plane. 15

Combined cosmic runs LAr Tile Muon  ID -  MS (rad) 1 Oct

First attempts of alignment in Inner Detector SCT alignment with small sample of cosmics, only layer-to-layer alignment Pixel to SCT/Pixel alignment (layer-to-layer) Small samples of cosmics, no B-field, no vertex cut, alignment of layers and not single modules yet, units in mm 1 Oct S. Palestini: ATLAS

Cosmic events taken with magnets on And even something like this (TRT/barrel projected to z=0): 1 Oct

ATLAS Trigger / DAQ Data flow SDX1 USA15 UX15 ATLAS detector Read- Out Drivers ( RODs ) First- level trigger Read-Out Subsystems ( ROSs ) UX15 USA15 Dedicated links Timing Trigger Control (TTC) 1600 Read- Out Links Gigabit Ethernet RoI Builder pROS Regions Of Interest VME ~150 PCs Data of events accepted by first-level trigger Event data requests Delete commands Requested event data stores LVL2 output Event data ≤ 100 kHz, 1600 fragments of ~ 1 kByte each Second- level trigger LVL2 Super- visor SDX1 CERN computer centre DataFlow Manager Event Filter (EF) pROS ~ 500~1600 stores LVL2 output dual-CPU nodes ~100~30 Network switches Event data pulled: partial ≤ 100 kHz, full ~ 3 kHz Event rate ~ 200 Hz Data storage Local Storage SubFarm Outputs (SFOs) LVL2 farm Network switches Event Builder SubFarm Inputs (SFIs) 19 1 Oct 2008

DAQ commissioning DAQ/data flow system implemented and running Only a fraction of CPUs installed (  35%) in 2008 – Recent result, overnight run with menu (800kB event*) Data preloaded in 136 ROS 4 L2SV - 12 L2PU racks - 94 SFIs - 10 EF racks – Measured Lvl2 rate : 60 kHz – limited by RoI request rate to ROS (50% of LVL1) – Max expected at high luminosity is 20 kHz (20% of LVL1) EB rate : 4.2kHz (LVL2 driven) Aggregate effective EB bandwidth 3.3GB/s * Event size. Expected : 1.6 MB - normally today : 3 MB (LAr 5 samples for all cells in a cluster) 1st-beam “splashes” : 7 MB - max seen : 13 MB (LAr 32 samples) 1 Oct S. Palestini: ATLAS

Commissioning of computing model FDR I and II (Full Dress Rehearsals) realistic test of the computing model, from online (SFO) to analysis at Tier-2's all major steps included exercise the full & final software infrastructure (CondDB, TAGDB, trigger configuration, simulation, etc) implement the calibration/alignment model and data quality assessment provide samples of mixed events which look as much like data as possible for emulations of early analyses focused on two “FDR run weeks”, each emulating a few fills of data – FDR-1, simulating data with L  cm -2 s -1 Feb 08, Express and bulk reconstruction, data export to Tier-1s and Tier-2s – FDR-2, simulating data with L  cm -2 s -1 June 08, Including calibration and alignment operation, second express stream, derived-physics-data 1 Oct S. Palestini: ATLAS

FDR II RAW data export to all ten Tier-1 sites (18h data in 19h) Data rate (MB/s) Example dimuon mass plot made from Tier-0 DPD (5 days after data “taken”) In summary, chain works, although many details require more work. 1 Oct S. Palestini: ATLAS

Memory and CPU for event processing Memory < 2 GB (=2 GB when triggers are run for simulated data) CPU – 16 kSI2k sec (FDR2b) (ESD, AOD,DPD and monitoring)(*) – 20% due to DPD creation (to improve) ; additional 10% overhead – Spikes with pile-up for luminosity 1 Oct S. Palestini: ATLAS (*) Acronyms: EventSummaryData(output of reconstruction), AnalysisObjectData(selected output for analysis, DerivedPhysicsDatasets (further selected events/selected information)

Production and calibration streams  18 h  30 h 1 Oct S. Palestini: ATLAS

wLCG Grid: Tier-0 and the 10 ATLAS Tier-1s 1 Oct S. Palestini: ATLAS

Common Computing Readiness Challenge CCRC Phase 2 Data transfer Tier-0  Tiers-1 1 Oct S. Palestini: ATLAS

Preparation of physics studies ATLAS has recently completed a new set of physics studies, the CSC Notes (CSC=computer system commissioning) based on up-to-date detector description and tools for reconstruction and analysis. Focus on physics searches achievable with integrated luminosities in the range of  10  100 pb -1. Chapters cover performance studies of trigger, ID, Muon system, b-tagging, electron/photon, jets/missing E T, and physics studies in the areas of SM, b physics, top, Higgs, SUSY, exotics. This effort will be published altogether as : – Expected performance of the ATLAS experiment, detector, trigger and physics, CERN-OPEN (and available on arXiv) 1 Oct S. Palestini: ATLAS

Detector and trigger for first LHC beams Beam pickups Minimum-bias (MBTS) LUCID, BCM, etc Level-1 triggers had been set-up using cosmic rays. In addition, we had ready a beam-pick-up trigger (BPTX), and a dedicated scintillator hodoscope trigger (MBTS), from a device installed against the front face of the end-cap calorimeters. tertiary collimators 140 m BPTX 175 m ATLAS was “on” on Sep. 10, although many components operated with reduced HV (e.g.: SCT/barrel at very low bias), Pixel was off (safety and late commissioning), CSC were off (late commissioning or read-out), the luminosity detector LUCID was on and saw the beam. The three toroid systems were on. 1 Oct S. Palestini: ATLAS

First beams from LHC on Sept The first event recorded by ATLAS in the morning (a “splash” event, with the beam substantially dumped on collimators) A more readable event collected later (a “halo” event, with the beam passing through the experimental area) 1 Oct

Timing of Level-1 triggers Morning: MPTX is the time reference. All other triggers affected by time-of-flight effects (most visible for TGC wheels – one was receiving beam from the “wrong direction”) Afternoon: fewer events, cleaner situation, time offsets better defined. 1 Oct S. Palestini: ATLAS

Bunch crossing units Splash events: Calorimeter trigger-towers timing vs. MPTX time: Some effects are instrumental, but time-of-flight trend due to beam is clearly visible Tile-Cal timing for splash events: Trend within modules entirely due to time-of- flight for splash events 1 Oct S. Palestini: ATLAS

Halo event: tracks in TRT/end-caps projected on cylindrical (unrolled) surface, tracks in TRT/barrel projected on plane z=0 TRT/Barrel-A timing from splash events 1 Oct S. Palestini: ATLAS

Conclusion After the impressive progress in installation and commissioning of the different subsystems in previous years, 2008 has seen a very significant progress in the overall commissioning of the detector altogether, and the ability of data handling, processing and analysis. Few hardware items remain to be integrated, and several software procedures have been tested successfully. The exercise on September 10 th found us ready, and we are looking forward to collecting LHC data. 1 Oct S. Palestini: ATLAS

Additional ATLAS presentations at this workshop Nicoletta Garelli, Commissioning of the Pixel detector Benjamin Trocme, Commissioning and performance of the LAr calorimeter Danilo Banfi, Electron and photon reconstruction and identification Pawel Bruckman de Renstrom, Alignment of the ID Jose Enrique Garcia, Commissioning of the SCT Paul Dervan, SCT upgrade for SuperLHC Enrico Giulio Villani, SCT upgrade for SuperLHC Andrea Bocci, Commissioning of the TRT Zachary Marshall, ATLAS simulation software Christian Schmitt, Commissioning of reconstruction software Elena Solfaroli Camillocci, Data quality assessment in MDT calibration Wainer Vandelli, Readiness of Trigger and DAQ Jiri Masik, Trigger system in first collisions 1 Oct S. Palestini: ATLAS