Marcello A. Giorgi Università di Pisa & INFN Pisa November 27,2009 Plenary ECFA CERN The status of Project 27 November,20091Marcello A. Giorgi.

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

Sharpening the Physics case for Charm at SuperB D. Asner, G. Batignani, I. Bigi, F. Martinez-Vidal, N. Neri, A. Oyanguren, A. Palano, G. Simi Charm AWG.
Salvatore Fiore University of Rome La Sapienza & INFN Roma1 for the KLOE collaboration LNF Spring School “Bruno Touscheck”, Frascati, May 2006 CP/CPT.
Measurement of non BB Decays of Y(4S) to Y(1S)     and Y(2S)     Silvano Tosi Università & INFN Genova.
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
16 May 2002Paul Dauncey - BaBar1 Measurements of CP asymmetries and branching fractions in B 0   +  ,  K +  ,  K + K  Paul Dauncey Imperial College,
Jan 28th, 2009Colin Jessop at Notre Dame An experiment to measure CP violation in B mesons Colin Jessop University of Notre Dame.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
1 Physics Case of L=10 36 e + e - B Factory Achille Stocchi LAL-Orsay Université Paris-Sud and IN2P3-CNRS.
Blair Ratcliff, SLACSLUO Meeting, Sept. 18, 2008 Blair Ratcliff SLAC SuperB Detector Opportunities Overview Project Status Towards a TDR R&D Opportunities.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Moriond EW, 3 Mar 2008Tagir Aushev (EPFL, ITEP)1  B → K S  0  0  B → K S K S  B → K S  0  B → D *+ D *-  B → a 1 , a 1 K, b 1 , b 1 K...  
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Roger Rusack – The University of Minnesota 1.
The Detector F.Forti, INFN and University, Pisa Pisa, 5 maggio 2007.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
87 th Plenary ECFA Meeting July 2, 2010 SuperB update M.A.Giorgi INFN & Universita’ di Pisa.
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Impact parameter resolutions for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
2 nd workshop on SuperB 16.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Status of the art 2nd Workshop on SuperB.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Comparing Luminosity Scans and Profile Monitor Results The size of the overlap of the two beams can be calculated from the individual beam sizes using:
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
First results from SND at VEPP-2000 S. Serednyakov On behalf of SND group VIII International Workshop on e + e - Collisions from Phi to Psi, PHIPSI11,
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
I nstrumentation of the F orward R egion Collaboration High precision design ECFA - Durham2004 University of Colorado AGH University, Cracow I nstitute.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
Experimental considerations about  physics at DA  NE2 F. Anulli, D. Babusci, G. Pancheri Laboratori Nazionali di Frascati  Physics window at DA  NE2.
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
Update on & SVT readout chip requirements
SVT – SuperB Workshop – Annecy March 2010
Roberto Calabrese Ferrara University and INFN
Status of BESIII and upgrade of BESIII
SVT subchapters & editors
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
M. Sullivan International Review Committee November 12-13, 2007
Budker INP, Novosibirsk
superB Detector Workshop I University of Perugia and INFN
Workshop Goals for the Detector Groups
  at Super tau-charm
SuperB EMC Computing Foreseen activities and software/computing needs
The SuperB Silicon Vertex Tracker
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
3rd Workshop on SuperB SLAC June , 2006
F.Forti, INFN and University, Pisa Paris, May
BINP Tau-Charm Project
Marcello A. Giorgi Università di Pisa & INFN Pisa
Francesco Forti SuperB Workshop LNF, March, 2006
Interaction Region Design Options e+e- Factories Workshop
Dual readout calorimeter for CepC
Summary of Washington DOE Review
IR Lattice with Detector Solenoid
SuperKEKB Proto-collaboration
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Perugia SuperB Workshop June 16-19, 2009
Marcello A. Giorgi Università di Pisa & INFN Pisa
Presentation transcript:

Marcello A. Giorgi Università di Pisa & INFN Pisa November 27,2009 Plenary ECFA CERN The status of Project 27 November,20091Marcello A. Giorgi

SuperB is a project sustained by an international collaboration aiming at a regional project: the construction of a very high luminosity (10 36 cm -2 s -1 ) asymmetric e + e - Super Flavor Factory, with location, inside or near the INFN Frascati National Laboratory. A Conceptual Design Report, signed by 85 Institutions was published in March 2007 (arXiv: [hep-ex]) A TDR is now under construction to be ready by end An Intermediate Document ( White Paper) in the next few months. SuperB: a ≥10 36 cm -2 s -1 e+ e- collider 27 November, Marcello A. Giorgi

27 November,2009Marcello A. Giorgi3 Previous presentations of the Project Manchester (‘07) : Lisbon (March’08) : CERN (Nov’08): REPORT BASED ON CDR Some Highlight on Physics Program Quick update on Detector Accelerator : preliminary results from test on SuperB concepts in Da  ne upgrade at LNF. Quick update on Physics Program and Detector Accelerator test results Update on Process and Organization for TDR 320 Signatures About 85 institutions 174 Babar members 65 non Babar.

To New Physics BSM with Super Flavor Factories The factories program complementary to LHC and LHCb. The optimum is the global approach : Direct evidence: Energy frontier (look for peaks) Indirect : Flavor (look for rare or forbidden processes) Quark Sector (b,c) Lepton Sector (LFV in charged leptons, CPV in , g-2,neutrinos) EDM Astroparticle and non accelerator Physics 27 November,2009Marcello A. Giorgi4

The factories program complementary to LHC and LHCb. The optimum is the global approach : Direct evidence: Energy frontier (look for peaks) Indirect : Flavor (look for rare or forbidden processes) Quark Sector (b,c) [Golden modes B→  and B→s  ] Lepton Sector (LFV in charged leptons, CPV in , g-2,neutrinos) EDM Astroparticle and non accelerator Physics 27 November,2009Marcello A. Giorgi5 Accessible to Factories To New Physics BSM with Super Flavor Factories

27 November,2009Marcello A. Giorgi6 CKM precision measurements 1 ab ab -1

Marcello A. Giorgi 7 Charm FCNC Charm mixing and CP B Y(4S) B s Y(5S)  Physics 27 November,2009

8 Br(B d  K  ) – Z penguins and right hand current   ~[20-40] ab -1 are needed for observation >>50ab -1 for precise measurement SM today If these quantities are <~10% deviations from the SM can be observed Only theo. errors 27 November,2009Marcello A. Giorgi

9 CP Violation in charm from mixing NOW 27 November,2009

Marcello A. Giorgi 10 CP Violation in charm from mixing NOW SuperB 27 November,2009

Marcello A. Giorgi11 Charm Charm events at threshold are very clean: pure DD, no additional fragmentation High signal/bkg ratio: optimal for decays with neutrinos. Quantum Coherence: new and alternative CP violation measurement wrt to  (4S). Unique opportunity to measure D 0 -D 0 relative phase. Increased statistics is not an advantage running at threshold: cross- section 3x wrt 10GeV but luminosity 10x smaller. SuperB lumi at 4 GeV = cm -2 s -1 produces ~10 9 DD pairs per month of running. (using Cleo-c cross-section measurement [  (e + e -  D 0 D 0 )~3.6 nb ] +[  (e + e -  D + D - )~2.8 nb] ~ 6.4 nb) Super tau-charm could well study mixing and CP violation direct/indirect, but not in time dependent analysis as done in in B factories. Time-dependent measurements at 4 GeV only possible at SuperB to extract weak Phase thanks to the improved time measurement and to the option of running at charm threshold. 27 November,2009

ParameterRequirementComment Luminosity (top-up mode)10 36 cm -2 s  (4S) Baseline/Flexibility wit headroom at cm -2 s -1 Integrated luminosity75 ab -1 Based on a “New Snowmass Year” of 1.5 x 10 7 seconds (PEP-II & KEKB experience-based) CM energy range  threshold to  (5S) For Charm special runs…… Minimum boost  ≈0.28 ≈(4x7 GeV) 1 cm beam pipe radius. First measured point at 1.5 cm e - Polarization60-85% Enables  CP and T violation studies, measurement of  g-2 and improves sensitivity to lepton flavor-violating decays. Detailed simulation, needed to ascertain a more precise requirement, are in progress. 27 November,200912Marcello A. Giorgi PARAMETER REQUIREMENTS FROM PHYSICS

13 SuperB parameter list (updated July 2009) 27 November,2009Marcello A. Giorgi

1.Large Piwinski’s angle F = tg( q)s z / s x 2.Vertical beta comparable with overlap area b y s x / q 3.Crab waist transformation y = xy’/(2 q ) Machine concept : (Crab Waist in 3 Steps) 1. P.Raimondi, 2° SuperB Workshop, March P.Raimondi, D.Shatilov, M.Zobov, physics/ November,200914Marcello A. Giorgi

27 November,200915Marcello A. Giorgi

27 November,200916Marcello A. Giorgi

27 November,200917Marcello A. Giorgi

SuperB Site independent now LNF 27 November,200918Marcello A. Giorgi Polarization included

Damping ring Collider hall SuperB Site independent now LNF 27 November,200919Marcello A. Giorgi Polarization included

5.8 m Damping ring Collider hall SuperB Site independent now LNF 27 November,200920Marcello A. Giorgi Polarization included

Collider Hall (  12x30m) area for cooling towers Existing Building Guesthouse 2 “SLAC type buildings” (20x35m) housing 6 klystrons each plus magnet power supplies Electrical Substation upgradable up to 2x63MVA transformers 27 November,200921Marcello A. Giorgi

Geological Survey 27 November,200922Marcello A. Giorgi

27 November, Marcello A. Giorgi Measurements made by a team of : LAPP Annecy, LNF and PisaVIRGO

SuperB expected LUMI With 7 th year integrated Luminosity can grow at rate of  40 ÷ 60 ab -1 /year >80ab-1 after 6 years 27 November, Marcello A. Giorgi

Background Issue : sources Cross sectionEvt/bunch xingRate Beam Strahlung~340 mbarn ( E γ /Ebeam > 1% )~8500.3THz e + e - pair production~7.3 mbarn~187GHz e + e - pair (seen by 1.5 cm) ~0.07 mbarn~0.270 MHz Elastic BhabhaO(10 -4 ) mbarn (Det. acceptance)~250/Million100KHz Υ(4S)O(10 -6 ) mbarn~2.5/Million1 KHz Loss rateLoss/bunch passRate Touschek (LER)4.1kHz / bunch (+/- 2 m from IP)~3/100~5 MHz 27 November,200925Marcello A. Giorgi radiative Bhabha  dominant effect on lifetime Two colliding beams : e+e- e+e- production  important source for SVT layer-0 synchrotron radiation  strictly connected to IR design Single beam : Touschek  negligible in BaBar, important in SuperB beam-gas intra-beam scattering Collimators, dynamic aperture and energy acceptance optimization solve the problem of Touschek Background in LER

Beam Strahlung Single shared QD0 (conventional design): the beam lines are displaced w.r.t. the quadrupole magnetic axis. The off-energy particles are diverted into the vacuum chamber producing bkg. Double QD0 (Siam Twins Quadrupoles): the beam lines are tilted w.r.t. the quadrupole magnetic axis. Only the softer particles produces bkg. (smaller rate, easier shielding) CDR: QD0 shared by HER & LER Mike Sullivan Double QD0 for HER & LER 27 November,200926Marcello A. Giorgi

QD0: Siam Twin Design Iron Free SC quadrupole: 120 T/m (HER) 52 T/m (LER) Sim. 2D Total Field Left Coil Field Right Coil Field External coil Left External Coil Field Right The desired linear fields are produced by the superposition of the inner and outer fields of the coils determined in 2D in algebraic way. 3D Finite elements analysis (Tosca) shows good field quality (Sextupole less than w.r.t. the r = 1 cm to be further optimized) Challenging design: Prototype construction will start in 2010 Simona Bettoni Eugenio Paoloni 27 November,200927Marcello A. Giorgi

Pair Production The detector solenoidal field is the main trap to keep low p t particles away from the detector Geant 4 simulation to predict the rate on Layer0 in progress Preliminary : 7.8 MHz/Cm 2 crossings in L0 (300mm Si) 7.3 mbarn Dominant Feynman graph gamm a e+e+ e-e- Geant4 Sim SVT Layer 0 Beam pipe Riccardo Cenci SVT Layer 0 radius (cm) Track rate (Hz/cm 2 ) Generator level predictions SuperB L 0 at 13 mm & Beam pipe at 10 mm (1mm Be 5 m m Au) No Beam Pipe : CDR 27 November,200928Marcello A. Giorgi

Developed a light L0 module support with cooling microchannel integrated in the Carbon Fiber support: 0.35 % X 0 –Total support thickness = 0.35 % X 0 –Consistent with the requirements TFD Lab ready in Pisa First thermoidraulic measurements in good agreement with simulation and within specs. ½ MIP DETECTOR: SVT- Layer0 R&D Status Successfully tested two options for L0 CMOS MAPS matrix with fast readout architecture (4096 pixels, 50x50  m pitch, sparsification and timestamp) – Hit efficiency up to 92% with room for improvement – Intrisinc resolution ~ 14  m compatible with digital readout. Thin (200  m) striplets module with FSSR2 readout chips – S/N=25, Efficiency > 98% First demostration of LVL1 capability with silicon tracker information sent to Associative Memories MAPS Hit Efficiency vs threshold Carbon Fiber Support with 3 channels 12.8 mm 1.1 mm SLIM 5 CERN (Sept 2008) 90% 27 November,200929Marcello A. Giorgi

DETECTOR: Particle Identification Hadronic PID system essential for P( ,K)>0.7GeV/c (use dE/dx for p<0.7GeV/c) Baseline is to reuse BaBar DIRC barrel-only design – Excellent performance to 4GeV/c – Robust operation, Elegant mechanical support – Photon detectors outside field region – Radiation hard fused silica radiators Photon detector replacement – Baseline: Use pixelated fast PMTs with a smaller SOB to improve background performance by x with identical PID performance 27 November,200930Marcello A. Giorgi

DETECTOR: Forw/Back PID option Extending PID coverage to the forward and backward regions has been considered Possibly useful, although the physics case needs to be established quantitatively Serious interference with other systems – Material in front of the EMC – Needs space cause displacement of front face of EMC Technologies Aerogel-based focusing RICH –Working device –Requires significant space (15 cm) and thickness (about 28%X0) Time of flight –Need about 10ps resolution to be competitive with focusing RICH –15-20ps already achieved. 27 November,200931Marcello A. Giorgi

DETECTOR: The electromagnetic calorimeter *Barrel *BaBar barrel crystals not suffering signs of radiation damage. They’re sufficiently fast and radiation hard for SuperB needs  They can be reused. (Would have been) most expensive detector component *Background dominated by radiative Bhabhas. IR shielding design is crucial *Endcaps *Best possible hermiticity important for key physics measurements *New forward endcap *backward endcap is an option BaBar Barrel 5760 CsI(Tl) Crystals Essential detector to measure energy and direction of g and e, discriminate between e and p, and detect neutral hadrons 27 November,200932Marcello A. Giorgi

DETECTOR: Forward and backward EMC *Forward endcap –BaBar CsI(Tl) endcap inadequate for higher rates and radiation dose of SuperB Need finer granularity Faster crystals and readout electronics comparable total X0 –Option 1: LYSO crystals frees 10cm for a forw. PID system radiation hard, fast, small Moliere radius, good light yield expensive at the moment, although reduction possible –Option 2: retain 3 outer rings of CsI(Tl), LYSO the others less expensive no space for forw. PID system *Backward endcap (option) –Pb plates and scintillating tiles with fiber readout to SiPMs 27 November,200933Marcello A. Giorgi

Provides discrimination between  and  ±. Help detection and direction measurement of K L (together with EMC) Composed by 1 hexagonal barrel + 2 endcaps as in BaBar Add absorber w.r.t. BaBar to improve  /  separation. Amount and distribution to be optimized – 7-8 absorber layers – reuse of BaBar IFR iron under evaluation Use extruded scintillator a la MINOS coupled to geiger mode APDs through WLS fibers – expected hit rates of O(100) Hz/cm 2 d – single layer or double coord. layout depending on the x-y resolution needs DETECTOR: The Instrumented Flux Return 27 November,200934Marcello A. Giorgi

Detector simulation 27 November,200935Marcello A. Giorgi Fast simulation –Parametrized, for evaluating physics impact of detector choice Full simulation (Bruno) –GEANT4 full description, for background effect evaluation

Marcello A. Giorgi Detector Geometry Working Group forward PID device between DCH and EMC backward EM calorimeter SVT/DCH transition radius, internal geometry of SVT amount and distribution of absorber in IFR Effects of energy asymmetry. Group setup to quantify the impact of several detector options/parameters, including: Golden mode for a given scenario Non-golden, but still sensitive to deviations from the SM requires high precision on CKM parameters (obtainable with SuperB) -CKM:    + “Breco”: reconstruction of flavour-tagging B decays is crucial ingredient for SuperB physics program + possibly include channel at Psi(3770) work started on these channels Strategy: study the impact of detector options on a set of key measurements 27 November,

Marcello A. Giorgi Detector configurations Main tool: fast simulation generate/simulate/reconstruct physics events analysis tools inherited from BaBar  = cm space estimate for DCH electronics EMC solenoid IFR DCH SVT DIRC bwd EMC fwd PID examples of simulated detector schemes 27 November,

Computing FastSim: used for physics studies 27 November,200938Marcello A. Giorgi

27 November,2009Marcello A. Giorgi39 Process: Before 2009

Process: Reviews 27 November,2009Marcello A. Giorgi40 Since 2007 the Project: Physics motivation and Machine Design have been revewed by several International committees: CDR (Physics and concepts) by IRC (J.Dainton Chair) ECFA appointed committee (T.Nakada Chair) Machine (design, progress and organization for future steps) by Mini-Mac (J.Dorfan Chair) No one has identified any showstopper preventing the accomplishment of the project. From J. Dorfan report of MINI MAC April 24,2009 …. “Mini-MAC now feels secure in enthusiastically encouraging the SuperB design team to proceed to the TDR phase, with confidence that the design parameters are achievable” SuperB is now in TDR phase with commitment: TDR delivery end 2010 Shorter White Paper end 2009

27 November,2009Marcello A. Giorgi41 The President of INFN has presented the SuperB as a regional project in the European Strategy session of Cern Council. End July The Italian Minister of Science has presented the SuperB proposal for funding to the Economic Ministers Committee (CIPE) Process: 2009

27 November,2009Marcello A. Giorgi42 The President of INFN has presented the SuperB as a regional project in the European Strategy session of Cern Council. End July The Italian Minister of Science has presented the SuperB proposal for funding to the Economic Ministers Committee (CIPE) Process: 2009

27 November,2009Marcello A. Giorgi43 The President of INFN has presented the SuperB as a regional project in the European Strategy session of Cern Council. End July The Italian Minister of Science has presented the SuperB proposal for funding to the Economic Ministers Committee (CIPE) Process: 2009 Wait decision about funding!!

END 27 November, Marcello A. Giorgi