Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SIGNAL TIMING WITHOUT TRAFFIC COUNTS Zong Z. Tian, Ph.D., P.E.

Slides:



Advertisements
Similar presentations
Transportation Impact Analysis Presented By Katy Flynn, P.E. Fehr & Peers February 19, 2008.
Advertisements

Signal Patterns for Improving Light Rail Operation Wintana Miller, Associate Transportation Engineer With Mark Madden, P.E., P.T.O.E. DKS Associates.
1. Green Lights Program Objectives Improve Quality of Synchronization in a Short Timeframe Noticeable Improvements to Motorists Appropriate Allocation.
INTEGRATING SIGNAL AND LANE CONTROL Edward Lieberman, P.E. Jinil Chang, Ph. D Annual Meeting Panel 5: Emerging Technologies June 9, 2006.
Automated Bicycle Data Collection: A Case Study from Portland, OR Western District Annual ITE Meeting June 26th, 2012 Presenter: Sirisha Kothuri
Fixed Time Signal Coordination
ACS-Lite Offset Tuning Algorithm. Collect data from advance detectors on coordinated approaches Develop a Statistical Flow Profile correlated to the phase.
1 FHWA Traffic Signal Management Reviews Puget Sound Portland/Vancouver Ada County Minneapolis Nebraska Wisconsin DOTColorado Springs Boston TMC/EMC Puerto.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
1 Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 10/18/11.
Current Practices in Traffic Signal Coordination
CEE 764 – Fall 2010 Topic 7 Special Issues on Signal Coordination.
1 Travel Model Application for Highway Vehicle Emission Estimation Ho-Chuan Chen, Ph.D., P.E. King County Department of Transportation Seattle, Washington.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Lec 15, Ch.8, pp : Signal Timing (Objective)
PASSER II SOFTWARE.
CEE – Spring 2005 Lectures 16, 17 (Handouts, Chapter 24) Signal Timing and Coordination.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
Garmin GPS III Plus Data Collection. Objectives Collect: - Waypoints -Average Position Waypoints -Reference Waypoints - Multiple Tracks in One Track Log.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
CATER-Center for Advance Transportation Education and Research University of Nevada, Reno 2012 ITE Western District Annual Meeting ROUNDABOUT EXPERIENCE.
Adaptive Traffic Light Control For Traffic Network.
2015 Traffic Signals 101 Topic 7 Field Operations.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Applied Transportation Analysis ITS Application SCATS.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Original TSI was created for Electromechanical Controllers November the New TSI Format was released Format included Modification to allow for better.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
Assessment of Urban Transportation Networks by integrating Transportation Planning and Operational Methods /Tools Presentation by: Sabbir Saiyed, P.Eng.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
Silent Classroom Timer
Classroom Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
Coordinated Operations, notes from the field Edward Fok Resource Center Operations Technical Service Team 2005 TRB Annual Meeting.
Chapter 20: Actuated Signal Control and Detection
Southwest Washington ITS Traffic Data Collection & Analysis: A Tale of 3 Projects Jill MacKay ITE Traffic Simulation Roundtable October 4, 2012.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
2010 Fall Transportation Conference A Guideline for Choosing Cycle Length to Maximize Two-Way Progression in Downtown Area Saeedeh Farivar Zong Tian University.
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
CEE 764 – Fall 2010 Topic 3 Basic Signal Timing and Coordination Principles.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
New Uses for Archived Data Cathy McGhee, PE Senior Research Scientist Brian L. Smith, Ph.D. Associate Professor ITS America Annual Meeting May 2, 2005.
Stochastic Optimization Method for Coordinated Actuated Traffic Control May 16, 2008 Joyoung Lee and Byungkyu “Brian” Park, Ph.D Presented at VISSIM UGM.
Robust Synchronization of Actuated Signals on Arterials Project # : Simulation-Based Robust Optimization for Actuated Signal Timing and Setting.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
SCATS 6.10 Release Review SMUG, March 2013 Sydney.
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
Advancing Traffic Signal Management Programs through Regional Collaboration T3 Webinar -- July 23, 2009 Jim Poston Regional Transportation Commission Reno,
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
Urban Traffic Management System OPTIMIZATION OF URBAN TRAFFIC CONTROL SYSTEM Riza Atiq Abdullah bin O.K. Rahmat.
Thinking Inside the Box
Outline Sensys SensMetrics Solution SensMetrics Performance Measures
SUMMARY AND CONCLUSIONS
GREEN WAVE TRAFFIC OPTIMIZATION
* Topic 7 Field Operations
Transit Signal Priority: The Importance of AVL Data
CE 3500 Transportation Engineering Elements of Traffic Signals
School of Civil Engineering
Interlocal Cooperative Agreement FY 20
The Use Of Hard Shoulders As A Turning Lane: A Safety Evaluation
Presentation transcript:

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SIGNAL TIMING WITHOUT TRAFFIC COUNTS Zong Z. Tian, Ph.D., P.E. University of Nevada, Reno 1 Presented by Jim Poston Jim Poston Regional Transportation Commission of Washoe County

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Overview   Signal timing practice   Case study   My magic tool   Results   Conclusions 2

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Signal Timing Practice 3   Turning movement counts (15-30% total cost)   Computer model and timing optimization (50~70%)   Field implementation and fine tune (10~20%)   Timing maintenance (<5%)

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Coordination parameters 4   Cycle length   Phase sequence   Phase split   Phase offset

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting What Is Really Needed? 5   Phase demand/split   How to obtain phase split   estimate based on volumes   existing timing   controller log   Existing splits are generally good if no cycle change is needed

6

7 Intersection and distance NB

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Real-world Issues 8   Variable speeds   Early releases   Wrong offset reference   Start or end of coordinated phases   TS2-1 st Green or First Ring   Signal out of coordination   Preemption   Pedestrian   Loss communication   Clock time

9 Cycle = 120

10 NB

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Before-After 11 AfterBefore

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Before-After 12 AfterBeforeTotal = 4’04”Total = 6’15”

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting Before-After 13 AfterBeforeTotal = 4’04”Total = 6’15”

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SMRT S ignal M onitoring & R etiming T ool 14

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting 15

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting 16 GPS

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SMRT 17

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SMRT 18

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SMRT 19

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting CONCLUSIONS 20   Signal timing can be done without traffic counts (15%+ saving)   Significant improvement by simply changing phasing sequences   15% travel time saving   20~80% saving in stops  “Timer”  My magic “Timer”

Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting ? 21