10 November 2005DESY PRC – Chris Damerell 1 ILC Detector R&D Chris Damerell Rutherford Appleton Lab  ILC Detector R&D Panel and charge  Addendum to charge,

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012.
Charge to the Workshop Hitoshi Yamamoto March 18, LCWS2005. Stanford.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
9 January 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D Chris Damerell Rutherford Appleton Lab  ILC Detector R&D Panel and charge  Addendum to.
H.Weerts March 10, 2006LCWS06--Bangalore 1 WWS Detector R&D H.Weerts Argonne National Lab Report from the WWS R&D panel For the WWS R&D panel: J-C. Brient,
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
7 th February 2007ILC ACFA workshop - Beijing 1 ILC Detector R&D Tracking Review – Progress Report Chris Damerell RAL On behalf of the ILC Detector R&D.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Report from WWS and charge to the workshop Hitoshi Yamamoto 3/3/05 KEK.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Jim Brau for WWS to ICFA at Uppsala, 3 July Report of WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford March Discussing.
How we’re organizing ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Advisory Meeting December 11, 2006 Tracking Review at Beijing.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
3 rd June 2007Report on Beijing Tracking Review Chris Damerell 1 ILC Detector R&D Tracking Review 5-8 February 2007 Chris Damerell RAL On behalf of the.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
7th November 2006ILC Regional meeting - Valencia 1 ILC detector R&D – new organisation Chris Damerell RAL On behalf of the ILC Detector R&D Panel (a Panel.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
14 April 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D US Funding Needs Chris Damerell  Established funds in FY05 and required funds from FY06 for.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Status of the DCR Detector Chapter International Linear Collider (ILC) Workshop ILC-ECFA and GDE Joint Meeting in Valencia 7 November 2006 Detector Concept.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
How to organize ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Tracking Meeting December 8, 2006 Tracking Review at Beijing.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
7 October 2005SiD tracking – Chris Damerell 1 Chris Damerell Rutherford Appleton Lab  New charge, given to us by ILCSC on 27 th September (following meeting.
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Prospects for ILC Detector R&D Funding
Preparations for the SiD Workshop at Fermilab, April 9-11
The SiD Detector Outline Overview
The DBD: Outline and Scope
Presentation transcript:

10 November 2005DESY PRC – Chris Damerell 1 ILC Detector R&D Chris Damerell Rutherford Appleton Lab  ILC Detector R&D Panel and charge  Addendum to charge, and action plan from Panel  Input from detector R&D groups  Missing Topics  Longer term plans – Preliminary discussion with GDE  Conclusions

10 November 2005DESY PRC – Chris Damerell 2 ILC Detector R&D Panel and charge  9 members appointed shortly before LCWS 2005 by WWS-OC, 3 from each region: Jean-Claude Brient (Ecole Polytechnique, France) Chris Damerell (RAL, UK) chair Ray Frey (U Oregon, USA) HongJoo Kim (Kyonpook National U, Korea) Wolfgang Lohmann (DESY-Zeuthen, Germany) Dan Peterson (Cornell U, USA) Yasuhiro Sugimoto (KEK, Japan) Tohru Takeshita (Shinsu U, Japan) Harry Weerts (Michigan State U, USA)  Our website:

10 November 2005DESY PRC – Chris Damerell 3 Charge for WWS LC Detector R&D Panel 13 th Jan Create and maintain a register of ongoing R&D programs relevant for LC experiments, which should include R&D goals and schedules, names of participating institutions and their responsibilities, relevant publications, level of support, and web-links to current work. The R&D programs should include not only those required for the proposed detector concepts, but also those needed for measurements of luminosity, energy, and polarization (LEP) and those associated with the masking system, possible beam EMI, and other areas which may a overlap with MDI. The registration of such MDI projects should be performed jointly with the MDI panel. Maintain a central web repository for this information, and update it regularly.. 5. Continue these activities, and whatever further activities are judged important to prepare needed R&D for LC detectors, until a global lab assumes these responsibilities

10 November 2005DESY PRC – Chris Damerell 4  Addendum to our charge, given to us by ILCSC on 27 th September (following meeting with Barry Barish et al on 18 th August in Snowmass):  ‘At the request of the chair of the ILCSC, Produce a written report by the end of 2005 which identifies and prioritises the topics and areas of detector R&D which need immediate support. Inputs to this should be collected both from the detector concept teams and from all the detector R&D collaborations and groups interested, via their contact persons with the Detector R&D Panel. Individual proposals should not be identified. This report will initially be submitted to the WWS-OC, and then passed to the ILCSC.’  Could lead to expanded funds for detector R&D in USA (and possibly elsewhere) as early as FY2006  Given this timescale, we needed to move fast … Addendum to charge, and action plan from Panel

10 November 2005DESY PRC – Chris Damerell 5  Action plan, unanimously agreed by our Panel on 11 th October:  A topic is typically a body of work within a subdetector, eg the minimisation of endplate thickness within the TPC subdetector  Priority 1: Results needed urgently for proof of principle, to significantly enhance physics capability and/or reduce costs. Results needed in order to prepare LOI at end of 2008 (or as late as 2010 for lower-cost detector systems, such as BEAMCAL, LUMICAL, vertex detector)  Priority 2: Essential R&D, but not a potential showstopper, so results post- LOI will be OK. Or, R&D with goals on a longer timescale than ILC startup, eg for upgrade to 1 TeV  Some Priority 2 items will eventually evaporate, for subdetector options which aren’t incorporated in an approved overall detector (e.g. at least 8/10 of vertex detector technology options)  To first order, our Panel is simply collecting assessments from our wise contact people. If we have doubts about priorities suggested or sums estimated, we will resolve our differences in discussion with them.

10 November 2005DESY PRC – Chris Damerell 6 Subdetector Project N Project N+1 Min endplate thickness Optimise gas mix New money Secure funding Tbd, 1 or 2 TOPICS Our job: Publish needs for each Priority 1 topic eg TPC, Si tracker, ECAL No question of fiddling around with secure funding Priorities Contact people [See Panel web page for guidelines as to meaning of a ‘project’]

10 November 2005DESY PRC – Chris Damerell 7 CERN Courier November 2005 formerly: ‘Bids to host; site selection’

10 November 2005DESY PRC – Chris Damerell 8 GDE (Design) (Construction) Technology Choice Acc CDR TDRStart Global Lab. Det. Detector Outline Documents CDRsLOIs R&D Phase Collaboration Forming Construction Detector R&D Panel Tevatron SLAC B LHC HERA T2K Done! Detector “Window for Detector R&D Andy White, SiD R&D plans, Snowmass, 20 Aug 2005 Currently (?) Accelerator BCD end 2005 Detector R&D Panel Report end (or 4?) DODs March 2006 Detector CDR end 2006 In practice, detector R&D will extend much later, being continued within the approved collaboration(s) * *

10 November 2005DESY PRC – Chris Damerell 9 Input from detector R&D groups  Dan Peterson and colleagues at Cornell U have set up, maintained and continue developing an excellent website for the R&D reports  Since LCWS2005, our Panel has worked via , phone calls and personal contacts, to establish one contact person per detector collaboration (or per group, if preferred by the groups), and to help that person complete the register for their project  Response rate was slow till end of Snowmass, because we had ‘no carrots and no sticks’  This has changed with the Addendum to our charge. Groups have at last recognised the disadvantages of being left out …  2 nd Nov, 7 projects added from Fermilab 4 th Nov, 6 projects added from from SLAC  More to come, eg from DESY? [Karsten Buesser et al, Ralf Gerhards et al, …]  One extremely laid-back contact person eventually thanked me ‘for my persistence’

10 November 2005DESY PRC – Chris Damerell 10 Funding Inquiry Form has been sent to all our contact people (~40 at Snowmass, now ~70)  Asked them to define topics as: Priority 1 Priority 2  For their Priority 1 work only, asked about level of ‘established’ support for next 3 years (alternatively, support in 2005) broken down as: ‘Equipment’ (meaning all non-staff costs) in $ or € Academics Students in FTEs Support staff  Asked about additional support needed ( or ) to achieve their Priority 1 goals  Requested a separate form for each funding country – NOT funding agency! (with EU considered to be a separate country)  Panel members then spoke to (almost) all our contact people by phone  We introduced ‘escape clauses’ for multinationals, those unable to guess their budget for next year, those with problems separating academics and support staff, people with rivals on our Panel, etc. All our contact people are now satisfied, we hope  Deadline for return of completed forms, and for input of Research Statements to our web page, is set for 25 th November, 1 week after end of ECFA workshop in Vienna.

10 November 2005DESY PRC – Chris Damerell 11 Layout of the ILC Detector R&D Panel Report, to be completed by 31 st December:  Executive Summary  Detector Systems LEP (Ray Frey, …) Vertexing (Chris D, …) Tracking – gaseous (Dan Peterson, …) Tracking - silicon (Harry Weerts, …) plus 1 page per project: information Calorimetry (Wolfgang Lohmann, …) including ‘Research Statement’ Muon tracking (Harry Weerts, …) contributed by each contact person PID (Chris D, …) to the Panel website DAQ [OMIT?] Electromagnetic Interference (Chris D, …) Solenoid (Harry Weerts, …)  Current funding levels and urgent needs for expansion To be presented by topic and by country, not by project. But we will list the projects that have identified their needs, and those that have not, the latter under the heading: [No information provided; assumed to have no requirements for future support]  Reports from Concept Groups as submitted to Snowmass, or updated if they like  Contact people will be sent the draft report after 25 th November. Those who have provided nothing will be given a couple of days to provide input, if they wish to  By this means, we are hoping for a full response from the community

10 November 2005DESY PRC – Chris Damerell 12 ‘Missing’ Topics  Example: PID based on advanced DIRC could be important, given the possible use for heavy quark sign-selection, and excellent recent progress on focusing DIRC (Jerry Va’Vra et al) and on MPPCs (multi-pixel photon counters) by Hamamatsu photonics in collaboration with Shinsu U and Kyoto U  Are there others who have been discouraged by lack of support, from pursuing potentially important R&D studies for ILC?  ‘System integration’ – inner electronics, cables, connectors, cooling, etc is unfashionable but could be decisive between subdetector options. This was left far too late in case of LHC experiments. Claimed by some in ILC to be covered by detector concepts, but each subsystem should work through this in order to be considered for an LOI.

10 November 2005DESY PRC – Chris Damerell 13  Most seriously, could these issues threaten the PFA concept?  To satisfy the needs of ILC physics (where many important event types will appear as multi-jet topologies) PFA must continue to perform extremely well in the forward region Dave Burke LCWS 1991 Saariselka Idealised PFA over 4 pi sr

10 November 2005DESY PRC – Chris Damerell 14  Given the mediocre record of LEP detectors and SLD for forward tracking, excellent performance in this region should not be taken for granted …  PFA has been advertised for ILC since LCWS 1991, and jet energy resolution of 30%/sqrt(E jet ) has been suggested since Snowmass 1996  Isn’t it about time it was demonstrated? Note comment from one great expert on jet energy measurement a few years ago that ‘these people are completely crazy…’  First problem: requires full simulation and reconstruction software. We have three of these monsters, but after 15 years, are any of them yet up to the job? [Is this a case of divide and be conquered?]  Note that ‘reconstruction’ should include effects of secondary interactions of tracks in jets, and missing neutrinos in heavy-quark jets (possible VXD- related patchup) as well as photon conversions (which is the easiest of the 3 to deal with)

10 November 2005DESY PRC – Chris Damerell 15 Admittedly, pbar-p annihilation in the endplate of the vertex detector or TPC, to 8 pions, is an extreme example … But secondary interactions of pions will be common: pi-N elastic scattering pi-N charge exchange scattering pi-N inelastic scattering will all need to be handled differently..

10 November 2005DESY PRC – Chris Damerell 16  Minimising the thickness of TPC endplate/electronics/cooling (and corresponding R&D for silicon tracker) is surely a Priority 1 topic  But what are the requirements (in interaction lengths, presumably) in order to reach the necessary precision in measurement of E jet ?  At Snowmass, Sonja Hillert introduced the concept of the ‘luminosity factor’, the factor by which the integrated luminosity would need to be increased, to compensate for a less performant detector  For the vertex detector, she showed that L-factors of about 2 could result from an increase in R bp from to 25 mm. Given the cost of running ILC (circa $120 M p.a.?) one can justify a very extensive R&D effort by the MDI people in order to guarantee the small radius beampipe  What is the corresponding luminosity factor if one would accept an ‘endplate system’ for barrel tracking which is easy to build, compared with one that needs substantial R&D?  Is it unfair to describe these R&D activities as ‘missing topics’?

10 November 2005DESY PRC – Chris Damerell 17 Longer term plans – preliminary discussion with GDE  An initial discussion between a few R&D Panel members, all WWS- OC chairmen, and Barry Barish for GDE took place on Aug 18 th at Snowmass  Suggestion is being considered of evolving to a second phase, where our panel would be replaced by a committee under the GDE  This committee would review individual proposals, hold open session presentations, appoint referees, set milestones, require progress reports, etc.  Current composition of Detector R&D Panel would not be appropriate – we are all ILC ‘insiders’ with potential conflicts of interest

10 November 2005DESY PRC – Chris Damerell 18  Wise advice from Enzo Iarocci, who chaired the DRDC for 3 years, starting 1990, in the phase that led to the formation of the LHC detector collaborations (4 proposals that condensed into ATLAS and CMS) Panel should have a modest budget (DRDC had approx 6M euros p.a.) in order to provide initial backing for approved projects. Could FALC help with such a central pool of funding? Endorsement by this Panel would be a powerful stimulus for support from national funding agencies Panel should organise Open Sessions, for presentation of proposals and status reports. For 3 years, the Open DRDC meetings at CERN were the main public platform for many LHC-related matters To minimise costs and guarantee large audiences, it may be good to schedule these meetings as part of regional and international ILC gatherings (such as the ECFA/DESY workshop in Vienna next week, LCWS2006 in Bangalore) DRDC was effective in rejecting a number of proposals, and in helping to focus R&D in the critical period before the formation of the LHCC, and of the detector collaborations

10 November 2005DESY PRC – Chris Damerell 19 Conclusions  The urgent task of the Detector R&D Panel is to establish the current levels of support in different countries, and quantify the needed expansion, in order for the urgent Priority 1 goals to be realised in time  It hasn’t been easy, but we are now on track to achieve this by the end of the year  There are dangers, the most extreme expressed to our Panel being that the ‘haves’ could be reduced to the level of the ‘have-nots’, but one has to be somewhat optimistic, or one would not work in our field  Creation of a global peer review panel with a modest budget to support projects could help to stimulate the expanded programme that everyone in the ILC detector community knows to be urgently needed  >90% of support will continue to be supplied by national funding sources, in any circumstances

10 November 2005DESY PRC – Chris Damerell 20 Additional Material

10 November 2005DESY PRC – Chris Damerell 21 The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Bids to Host; Site Selection; International Mgmt LHC Physics

10 November 2005DESY PRC – Chris Damerell 22 Henri Videau Pb-Si sandwich Moliere radius 2.1 cm

10 November 2005DESY PRC – Chris Damerell 23 * * [Jet charge] Vertex charge (S Hillert) Charge dipole SV/TV + lepton SV/TV + kaon Charge of tertiary D Places highest performance requirements on vertex detector, and need R_bp ~ mm. Such measurements of differential cross-sections and angular correlations in multi-jet processes are entirely inaccessible at LHC S Riemann LC-Th

10 November 2005DESY PRC – Chris Damerell 24 Input from Concept Groups  Groups were requested by Snowmass to deliver reports describing their current R&D activities and future needs, in order to turn their studies into proposals based on established detector technologies  The SiD group provided a detailed document including a spreadsheet covering all their detector subsystems. Thanks to Andy White for this  We received outlines from the other concept groups. Thanks to Ties Behnke and Yasuhiro Sugimoto  These (possibly updated) will be published as part of the overall R&D Panel Report, at end of this year

10 November 2005DESY PRC – Chris Damerell 25 Received 2 nd November via Marcel Demarteau active pixels: Ray Yarema Fermilab active pixels based on SOI technology: Ron Lipton Fermilab hybrid pixels: Dave Christian Fermilab vertex detector mechanical studies: Bill Cooper Fermilab 5 T Solenoid studies: Rich Smith Fermilab Particle-flow algorithms and related simulation software Adam Para Ferimilab Beampipe design Bill Cooper Fermilab

10 November 2005DESY PRC – Chris Damerell 26 Received 4 th November 2005 via John Jaros and Mike Woods Si/W ECAL conceptual design Yannis Karyotakis SLAC/Annecy Microstrip sensor, mounting, cabling Tim Nelson SLAC VXD expected performance, technology selection, EMI issues Su Dong SLAC Background calculations Takashi Maruyama SLAC IR design Tom Markiewicz SLAC Polarimetry Ken Moffeit SLAC Any more to come, from DESY, CERN, etc?