You Should Know Bulletin No. 135 © ACPA All Rights Reserved.

Slides:



Advertisements
Similar presentations
Material Selection Central Office Hydraulics
Advertisements

2013 Construction and Material Specifications Hydraulics and Environmental Summary Gary Angles, Office of Construction Administration.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
KRAH AG : STRUCTURED WALL PIPE TECHNOLOGY
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Supplemental Specification 802: Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures Ted Strickland, Governor Jolene Molitoris,
By: Adil Godiwalla, P.E. Houston Airport System
VOBUG Conference August 3 rd, 2010 Nashville, Tennessee Robert LeFevre, P.E. Adam Price, P.E. Tennessee Department of Transportation Structures Division.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
ALL STORM PIPING PRODUCTS ARE NOT CREATED EQUAL! Rigid Vs Flexible Presentation by:
PIPE INSPECTION AND REPAIR
1 PRESENTATION FLOWABLE FILL Presented By: Mac McArthur, P.E. Construction Engineering Services Bureau Mike Lynch Materials Bureau Highways and Engineering.
First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, Eliminated need for concrete thrust blocking Case History:
Elements of a Good Concrete Pipe Specification David JP Matocha Technical Resource Manager Hanson Pipe & Precast.
Gas Transmission Pipelines
Joint Types and Behavior. Rigid Pavement Design Course Jointing Patterns.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
CRACK CONTROL IN CONCRETE MASONRY WALLS
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
Underground Systems: Hydraulic Design
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
Developing a Mixture-Based Specification for Flexible Base.
Pavement Analysis and Design
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Underground Systems: Hydraulic Design
WATERTIGHT STORMWATER SYSTEMS CREATED BY USING FLEXIBLE CONNECTORS USING FLEXIBLE CONNECTORS.
Backfilling new sewer line trench/excavation Multitask sewer installation: trenching and installing new sewer line followed by trench backfill and compaction.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
JSC CTC Metallokonstruktsiya Corrugated structures.
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
Eastside Reservoir Site Drainage and Leakage Issues Attachment 4A.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Basic Structural Considerations Bridge Inspection Course.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
Precast Concrete Septic Tanks
Installation and Inspection of Concrete Pipe Joining / Joints
Sanitary Engineering Lecture 13
City of Clarksville Storm Water Management Manual Revisions 2014.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Water Drainage System Harris County, TX
2016 Construction & Materials Specifications
City of San Jacinto 7th Street Pavement Repairs
Site Grading Site Grading Civil Engineering and Architecture
What is an on-lot sewage system?
WATER MAIN REHABILITATION
AASHTO LRFD Section 12 Standards
4th Annual Construction Law Summit
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
Navigating FDOT Specifications and Standards
American Concrete Pipe Association Short Course School 2014
TRENTON Casing Filler Presentation
Investigation of pipeline failure
PIPE TESTING
Understanding our Competition - Part B Metal Pipe
Joints John Kallemeyn.
Polypropylene Pipe (PP)
2013 Construction and Material Specifications Hydraulics and Environmental Summary Gary Angles, Office of Construction Administration.
Pipe Joints.
AASHTO LRFD Section 12 Standards
A Look At Rigid & Flexible Pipe Products
Alabama & Georgia DOT Perspectives
SCITEQ End closure series
ACEC Designer Training
Gas Transmission Pipelines
Presentation transcript:

You Should Know Bulletin No. 135 © ACPA All Rights Reserved

Performance History Planning Hydrology Hydrology Hydraulics Hydraulics Structural Structural Installation Installation Specifications Specifications Life Cycle Costs Life Cycle Costs VALUE ENGINEERING

PIPE JOINT PERFORMANCE Provide Pipeline Continuity Assure a Smooth Flow Line Resist Exfiltration of Effluent Resist Infiltration of Groundwater and Backfill Material Accommodate Lateral and Longitudinal Movement Resist Shear and Deformation

Notice here how the tie holding the nested pipe in place is causing distortion in the joint bell.

So, what happens when a contractor attempts to put together pipe that has distorted bells. Joint leakage allowing backfill infiltration and ultimately pipe failure.

NEW CONSTRUCTION USING HDPE PIPE WITH JOINT DEFORMATION DURING SITE STORAGE AND ULTIMATELY PIPE FAILURE & REPLACEMENT DEFLECTION RESULTING IN BACKFILL INFILTRATION AT JOINTS

CONCRETE PIPE JOINTS OFFER SEVERAL OPTIONS Confined O- Ring Rubber Gasket Joint Single Offset Rubber Gasket Joint Mastic Sealant Joint Mortar Joint

CONCRETE PIPE JOINTS OFFER SEVERAL ADVANTAGES OVER HDPE PIPE JOINTS Joints are thick and rigid to prevent any deformation Joints and gaskets are governed by national specifications Joints combine great shear strength and flexibility Joints provide excellent watertightness Joints can withstand up to13 psi pressure – the equivalent of 30 feet of groundwater pressure head

Toledo Zoo

Sample Installations

TOLEDO ZOO PARKING LOT DRAINAGE PIPE SIZES & QUANTITIES DRAINAGE PIPE SIZES & QUANTITIES Pipe Size Quantity Pipe Size Quantity (inches) (feet) (inches) (feet)

STORM SEWER PLAN LAYOUT 50,000 Gallon Storage Capacity 8” OUTLET 30”27”24”21”18”15”12” 12” LATERALS

ASTM Standard of Practice D2321 Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications Restrictions on use of Classes of embedment and backfill material Restrictions on use of Classes of embedment and backfill material Maximum particle size Maximum particle size Restrictions on mode of dewatering Restrictions on mode of dewatering Requirements on minimum trench width Requirements on minimum trench width Restrictions and details for support of trench walls Restrictions and details for support of trench walls Specific restrictions on methods of compaction Specific restrictions on methods of compaction Minimum embedment density Minimum embedment density Minimum cover requirements Minimum cover requirements Detailed requirements for manhole connections Detailed requirements for manhole connections Requirements on methods of testing compaction and leakage Requirements on methods of testing compaction and leakage Requirements on deflection and deflection testing Requirements on deflection and deflection testing Limits on usage of trench boxes Limits on usage of trench boxes Select backfill and compaction required to 6”-12” above top of pipe Select backfill and compaction required to 6”-12” above top of pipe

“If the pipe product is approved by the State Department of Transportation, it must be an acceptable pipe material, and, therefore, appropriate for our particular application.” Famous Last Words

Immediately after pipe installation and paving, significant pavement settlement occurred at every 20-foot joint length. Initially, attempts were made to patch the settlement areas, but the pavement settlement became progressively worse after every rain storm. PATCH Saw-cut pavement to remove HDPE pipe PAVEMENT PATCH PATCH PAVEMENT PATCH PATCH

Pipe Joints

TEARING UP NEW PAVEMENT, EXCAVATING and REMOVING FAILED HDPE PIPE REMOVING FAILED HDPE PIPE

STRUCTURE REPLACEMENT

PARKING LOT PARTIAL PAVEMENT REPLACEMENT FOR REMOVAL OF HDPE PIPE and INSTALLATION OF RCP

D E S I G N E N G I N E E R L I A B I L I T Y

Conduit Pipe Structure

Concrete Pipe Structure Conduit

Flexible Pipe Conduit Structure ? ? ? ? ?? ? ? LOW BID INC.

LAWSUITS REPORTED BY ADS for TUBULAR PROFILE WALL HDPE PIPE for TUBULAR PROFILE WALL HDPE PIPE Is It Worth The Risk?

REFERENCES American Concrete Pipe Association You Should Know: #121 Installation Anomalies #128 A Case In Point #131 When is the Correct Pipe Material Important? Concrete Insights: Handling & Installation Comparisons Concrete or HDPE: Strength versus Stiffness Concrete Pipe Joints – Your Best Choice Brochures: Concrete Pipe Joints, Your Best Choice Standard Installations The Infrastructure is Collapsing! Dispatch: A Case in Point for Choosing Concrete Pipe National Specifications: ASTM D 2321, Standard practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity–Flow Applications AASHTO Section 30, LRFD Bridge Construction Specifications