1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
“Opening the Door to Bonding” U.S. Small Business Administration Surety Bond Guarantee Program.
CONSTRUCTION DEFECT RECOVERY FROM SURETY: THE SINKING BUILDING TALE PRESENTATION AT DES CLIENT WORKSHOP OCTOBER 8, 2014 BOB BOURG, DES CLAIMS AND DISPUTES.
DESIGN INVESTIGATE REHABILITATE Design and Quality Assurance of CFRP Repair of Concrete Pressure Pipes Rasko Ojdrovic Murat Engindeniz Mehdi.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Renting vs. Buying Housing. Rental Terminology Landlord Owner of property –Expects rent to be paid on time and for tenant to keep the property in reasonable.
Surety Bond Claims State of Colorado 05/15/2013. State of Colorado Surety Bond Overview Construction Contract Surety Bonds  Bid – Guarantees bidder will.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
ALL STORM PIPING PRODUCTS ARE NOT CREATED EQUAL! Rigid Vs Flexible Presentation by:
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
PIPE INSPECTION AND REPAIR
City of Bloomfield Hills 2015 Road Improvement Program.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Elements of a Good Concrete Pipe Specification David JP Matocha Technical Resource Manager Hanson Pipe & Precast.
TransCanada Corporation (TSX/NYSE: TRP)
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Gwinnett County’s Post Development Stormwater Management Program
Increased load capacity of arch bridge using slab reinforced concrete T.G. Hughes & M. Miri Cardiff School of Engineering Arch 04, Barcelona, Nov ,
Chapter 17 Construction Bonds Vanessa S. Werden
The Great Depression. What was the Great Depression? Time of economic crisis characterized by high unemployment during the 1930s, the beginning is marked.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
TRENCHLESS TECHNOLOGY
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
You Should Know Bulletin No. 135 © ACPA All Rights Reserved.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Quality in Manufacturing and Service Systems
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Building Industry Game B.I.G. - Building oror Building/Heavy Associated Schools.
Introduction to Construction General Permit Inspections.
Master Policy and Unit Owner Policy June 11, 2015 Insurance.
EnE 301: ENVIRONMENTAL ENGINEERING
Chapter 17 Property Management A property manager is also a people manager and relationships are important. This manager may be checking a property’s plans.
Stick This in Your Pipe. Information Found at the Following Website
Supply Chain Management: From Vision to Implementation Chapter 4: New Product Development Process: Managing the Idea Infrastructure.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
WATERTIGHT STORMWATER SYSTEMS CREATED BY USING FLEXIBLE CONNECTORS USING FLEXIBLE CONNECTORS.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Chapter 22: The Competitive Firm Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 13e.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
PIPS!!! Performance Information Procurement System.
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
City of San Jacinto 7th Street Pavement Repairs
City of Bloomfield Hills
Rehabilitation Program impact on Sewer Management
AASHTO LRFD Section 12 Standards
4th Annual Construction Law Summit
DOT Panel Discussion Quality Acceptance Programs & Inspection Guidelines
Pipe Post Installation Inspection Demonstrations
UKRAINE, KYIV REGION, BARYSHIVKA plant was put into operation in 2007
Investigation of pipeline failure
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Understanding our Competition - Part B Metal Pipe
Insert local association
Pike Creek Dam Conduit Repair
AASHTO LRFD Section 12 Standards
A Look At Rigid & Flexible Pipe Products
ABC Company ABC Chemical Complex Engineering Specification
Fiber Reinforced Polymer Systems
Presentation transcript:

1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer Hancock Concrete Products

2 August 12, PRESENTER BIOGRAPHY SLIDE Scott Hofer is the Sales Manager for Hancock Concrete Products a Manufacturer of Pre-Cast concrete pipe and products with 6 locations in the upper Midwest. He is a 30 year veteran of the concrete products industry and also spent 8 years in distribution of water, sewer and fire protection products. Mr. Hofer is a past president of the South Dakota Associated General Contractors of America and past chairman of the SE South Dakota Chapter of the American Public Works Association. He is a past winner of the American Concrete Pipe Association’s Presidents Award for Marketing Excellence and is a current member of the City of Sioux Falls Infrastructure Review Advisory Board. Scott and his wife Becky reside in Sioux Falls, SD. They have 4 children and 3 grandchildren.

3 August 12, Risk Assessment Underground Utility Construction Pipe - Product Options Engineering 101 Buried Flexible & Rigid Pipe Design Case History – Tyndall, SD Storm Drain Pipe Failure Lessons Learned

August 12, Conduit & Structure Traffic Load Earth Load

August 12, Pipe Product Options Rigid Pipe RCP (Reinforced Concrete Pipe) Flexible Pipe HDPE High Density Polyethylene PVC Polyvinyl Chloride CMP Corrugated Metal Pipe

August 12,

Reinforced Concrete Pipe Load TEST 48” ASTM C-76 Class IV 8’ D 0.01 = 2000 D 0.01 = 2000 D ULT = 3000 D ULT = 3000 Total Load Required: D 0.01 = (48/12)(8)(2000) = 64,000 lbs. = 64,000 lbs. D ULT = (48/12)(8)(3000) = 96,000 lbs. = 96,000 lbs. 48” ASTM C-76 Class IV 8’ D 0.01 = 2000 D 0.01 = 2000 D ULT = 3000 D ULT = 3000 Total Load Required: D 0.01 = (48/12)(8)(2000) = 64,000 lbs. = 64,000 lbs. D ULT = (48/12)(8)(3000) = 96,000 lbs. = 96,000 lbs. August 12, 2014

8 FLEXIBLE PIPE IN FIELD TESTING Go-No-Go device (Mandrel)Go-No-Go device (Mandrel) 5% Deflection5% Deflection Stuck if deflection exceededStuck if deflection exceeded Pipe Portion repaired and retestedPipe Portion repaired and retested 30+Days30+Days Prior to Final AcceptancePrior to Final Acceptance

August 12,

10 MINIMUM PIPE STIFFNESS AT 5% DEFLECTION PVC ( SDR 35) vs HDPE

August 12,

August 12, How many contractors know the difference between how a rigid pipe and a flexible pipe perform?How many contractors know the difference between how a rigid pipe and a flexible pipe perform? How many contractors know that less than 10% of the design strength comes from the flexible pipe?How many contractors know that less than 10% of the design strength comes from the flexible pipe? Do all contractors know that backfill techniques for flexible pipe are more demanding than those for rigid pipe?Do all contractors know that backfill techniques for flexible pipe are more demanding than those for rigid pipe? How many contractors monitor the shape of a flexible pipe during backfill?How many contractors monitor the shape of a flexible pipe during backfill? How many contractors know that large diameter HDPE has less structural stiffness than small diameter pipe.How many contractors know that large diameter HDPE has less structural stiffness than small diameter pipe.

August 12, City of Tyndall, SD South Main Street Utility and Street Improvements Schedule A, B, C and D Ivy Street Storm Sewer Improvements Schedule E and F 4,400 LF – 48” STORM SEWER Engineering Firm: 45 Years Experience Contractor: Over 20 Years Experience

August 12, DISCUSSION POINTS ISSUES RAISED WITH THE ENGINEER PRIOR TO THE BID 48” diameter HDPE stiffness is less than in smaller diameters. As the pipe diameter. increases the stiffness of the pipe decreases. The twin line of 48” was particularly difficult to construct due to the large trench width. Post installation deflection testing was not specified. Inspection during construction would be vital and would be very expensive. Often municipalities limit the amount of inspection they will pay for. Very little of this size HDPE pipe has been used in this area. Most contractors bidding this job have had no experience with this size of flexible pipe. The cost difference between HDPE and RCP is minimal if you take into consideration the material & labor it takes to build the soil envelope. ENGINEER’S RESPONSE We prefer to use Concrete Pipe, but its more expensive than HDPE and the City of Tyndall has limited funds for the project.

August 12, Yr Old Asphalt Street Initial signs of pipeline failure Depressions in roadway Cracks along roadway above pipeline

Failed HDPE Pipe Severe Deflection Buckling Cracking August 12, 2014

17 Removing Failed HDPE Installing New RCP

August 12, Disposal of Failed HDPE Landfill

August 12, Who was affected by the Tyndall, SD Pipeline Failure? The Contractor Litigation Costs Settlement ? Reputation The Engineer Litigation Costs Settlement? Reputation The Pipe Manufacturer Litigation Costs Settlement? Product Reputation The Pipe Supplier Litigation Costs Settlement? The City of Tyndall Litigation Costs Disruption to Traveling Public The Home Owners (near the project) Road Closure Construction Activity The Surety Company Litigation Costs Bond Claim Settlement? The Bonding Agent Loss of Potential Profit Sharing with Surety Company. Loss of Relationship with Customer

August 12, LESSONS LEARNED You must be aware of the types of products being specified on all projects. Not all pipe products are equal. There is a big difference in how flexible and rigid pipe is to be installed. Successful installation of some flexible products is 95% dependent on the Contractor installing it correctly. A Contractor’s knowledge or experience with large diameter flexible products may be limited. Its important to know what experience your client has with specific pipe products. It is important to become educated on the risk involved on projects, including the depth at which pipe is to be installed. Inspection during construction is important, but everyone should understand that the Inspector is there for the benefit of the owner not to stop or correct a mistake as it happens. In many cases the Inspector is documenting the construction activity and may use that if problems arise. While cost is a concern, limiting risk should be paramount. What could go wrong? What will it take to fix it.

21 August 12, Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD YOUR QUESTIONS? If you do not have the opportunity to have your question addressed during the seminar, you may contact the presenter directly: Scott Hofer Hancock Concrete Products