National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.

Slides:



Advertisements
Similar presentations
Issue 1 It can be argued that the complexity problem associated with the current IP control plane has arisen because of ever evolving network service requirements.
Advertisements

Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Monthly Management Report February By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Aspirated Smoke Detection
Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Heat Recovery for Commercial Buildings
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Randy Benson Executive Director Rural Healthcare Quality Network.
Suppression products.
The Life Safety Surveyor Facility Tour
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
SAFETY IN THE WORKPLACE Created by : Chelsea Leppanen.
Spray Finishing Operations/Spray Booth March 9, 2009.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 30, 2013 Clean room administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
Fire Protection John Giefer. Statistics In the Drilling Industry In the Drilling Industry 25% of all inspections found violations of (21 inspections.
Physical Security Chapter 9.
Home & Family Safety. Things to Think About… Would you what to do if a fire started in your home? Have you practiced what to do in case of a fire? Do.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
WELCOME The Fixed Fire Suppression Systems. We carry out the supply installation & Annual required maintenance in regard to the fixed.
Control Rooms  Serve as operations centers for the control and monitoring of a service or process  Flight control rooms  Power generation control rooms.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Fire Detection Presentation
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Cleanroom Admin Committee Meeting Prabhakara Rao April 28,
STUDY OF BOILER’S ACCESSORIES
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
Atrium Fire Protection
Security and backups GCSE ICT.
LABORATORY DESIGN AND SAFETY EQUIPMENT. 1. LABORATORY DESIGN a. Egress b. Traffic Patterns c. Floor Surfaces d. Master Controls e. Automated Detection.
Copyright© Underwriters' Laboratories of Canada. All rights reserved. No portion of this material may be reprinted in any form without the express.
20 June 2013 Prague, Czech Republic Russell Kemp Atlanta, Georgia USA Advances in US Lead Producer Emission Controls.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Monthly Management Report Submitted By Facility Management Team
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
1 Company Profile Oct, Agenda Company Introduction Pacific Sense - Fire Safety Introduction Our Customers Environmental and Safety.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Sept 25, 2013 Clean room administrative committee.
FIRE SERVICES AT DATA CENTRE
Micro and Nano Characterization Facility Girish Kunte October 28 th 2014.
Associated detection/extinction systems D. Swoboda.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
Newmont’s Safety Journey. Behaviors Systems Involvement.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee.
Questions to Ask Before you Move Out and Signing the Lease.
Micro and Nano Characterization Facility Girish Kunte May 28 th 2014.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
FIRE SAFETY Fire Extinguisher Training. Fire Statistics in the U.S. More than 150,000 fires in the workplace every year On average, more than 100.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Welcome to the Safeguard IndustriesSafeguard Industries.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
Safety and Prevention of Typical Fire Plan
Home Safety Survey Program
Presentation transcript:

National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting

TUMS Murthy Analysis of IISc users (other than MITO84) – 53 users average around 35K/year – Top 10 users average around 97 K /year – Maximum usage by Suman Lakhs – Only 5 people exceed 1.0 Lakh User Statistics Oct 28, 2014 Cleanroom Admin Commitee Meeting

TUMS Murthy Order placed for cleanroom management system software with FOM networks – Installation to be completed by the end of this year – Software and hard ware locks will be installed – Automatic invoice generation will be possible Starting to invoice for precious metals from October usage Decision to be taken for Wafers Cleanroom Highlights Oct 28, 2014 Cleanroom Admin Commitee Meeting

TUMS Murthy – Order being placed for a water mist fire extinguisher to be located in the outer corridor of the cleanroom – Order being placed for smoke generators for testing smoke detectors – RFQs sent out for – Shifting of VESDA from utility building into the cleanroom – Installation of conventional fire/smoke detectors in utility building in UPS and chemical storage areas Oct 28, 2014 Fire Safety Cleanroom Admin Commitee Meeting

TUMS Murthy Annual clean room maintenance is being planned for December Major work planned is the arresting of leakage of fresh air at the AHUs Rework the thermal insulation of chilled water lines Wet exhaust scrubber Relaying the flooring of cleanroom outside corridor Oct 28, 2014 Annual maintenance Cleanroom Admin Commitee Meeting

TUMS Murthy Oct 28, 2014 Thank You Cleanroom Admin Commitee Meeting