PSS test conducted twice a year to verify operation of PSS enables and operation ARC1 Fails PSS certification. Will not turn off when PSS signal is disabled.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

SPILL – RESISTANT VACUUM BREAKER ASSEMBLY SVBA TESTIN G.
January 7, 2013 Changing or replacing G460 sensors Slide 1 November 9, 2012 Changing or replacing G460 sensors.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
CHREID 2008 ELECTRICAL SAFETY Introduction and Overview of Safety Clayton H. Reid September, 2010.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
©2011, The McGraw-Hill Companies, Inc. Chapter 4.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Gas Furnace Controls Part 4.
Circuit Analysis and Troubleshooting A Six Step Procedure Created by Jimmie Fouts Houston County Career Academy for.
Operating System Customization
Lecture 10: Amplifiers and Comparators Today, we will Learn how to design op-amp circuits to perform a task  Piece together basic op-amp circuits and.
1. Scope of the Project Diagnostic tools are already being used by GE for compressor performance, but they are… – Too expensive – Time Consuming – Hazardous.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
MCDST : Supporting Users and Troubleshooting a Microsoft Windows XP Operating System Chapter 9: Troubleshooting Power Management and I/O Devices.
Objective 3.01 Understanding Diagnostic and Therapeutic Services
A+ Guide to Software, 4e Chapter 11 Supporting Printers and Scanners.
Take 5 for Safety E. Lessard April 14, Power Disturbance on Sixteen 3-Phase Motors Failed due to “Single Phasing” 2 Arrow pointing to.
The First Central Emergency & Standby Lighting System Combining Storage Batteries & Generator Input 1 1.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
Troubleshooting Electric Control Devices
Booting in Windows XP Presented and Designed By: Luke Ladd.
By: Seth Flynn & Coleman Gross..  Doing preventive maintenance will increase components life and decrease their downtime.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Starter System Service Chapter 33 Page 439. Service Begins with Checking System Check the battery first –Voltage should be 12.6 and while the starter.
Confidential Battery Operated Photoelectric Detector AX-100TFR (30m) AX-200TFR (60m)
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 4 1 Chapter 4: Basics of Preventive Maintenance and Troubleshooting IT.
Register Digital Multimeter Usage Click Register to begin the course.
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
E2 Motors and Motor Starting
March 2010 Target Group Control System of production furnace for SPES project Results and progress status march 2010.
Brian Goepfert District Staff Assistant Metal/Non-metal Rocky Mountain District Denver, CO
IT Essentials: PC Hardware and Software v4.0. Chapter 4 Objectives 4.1 Explain the purpose of preventive maintenance 4.2 Identify the steps of the troubleshooting.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Basic Input/Output System
Why Maintenance Tasks are Important Produced by Joe Marchese.
Basic Electrical Contactors.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
Troubleshooting Equipment Containing Integrated Circuits Jimmie Fouts Houston County Career Academy.
INDICATORS 11 AND 13 Bureau of Indian Education Division of Performance and Accountability WebEx March 22, 2011 DESK AUDIT.
Loading a Sensor Plug-In 1 - From the BTAC Home Screen SELECT the Contact Name, i.e. bfd.samsung4.0 at the TOP of the SCREEN 1.
FEB Slide 1 Task No.:Point(s):1Only one answer is correct.Cat. No. To measure electrical … A current, the ammeter must be in line with the current.
PROGRAMMABLE LOGIC CONTROLLER
Last updated: 6/6/2016www.alto-shaam.com Halo Heat Training Cook & Hold OvensHolding Cabinets.
Actuators and Control, Part 4 Grant Agreement No LLP UK-LEONARDO-LMP Project acronym: CLEM Project title: Cloud services for E-Learning.
A Simple Fuzzy Excitation Control System for Synchronous Generator International conference on emerging trends in electrical and computer technology, p.p.
Level 1 – Maintenance activities Produced by Neil Liggett.
The Troubleshooting Process. Hardware Maintenance Make sure that the hardware is operating properly.  Check the condition of parts.  Repair or replace.
Chapter 16 GMAW and FCAW: Equipment Assembly and Adjustment Miller Electric Mfg. Co.
Freestyle Precision Pro
Inspection and test data analysis
14 Refrigerant Recovery, Recycling, and Recharging.
K TO 12 CHS MODULE FOR GRADE 9, PP
Maintenance masterdrive siemens
Most Effective Methods to Replace a Brake Light Switch.
HP Printer Technical Support Number
Loops and Switches Pre-Quiz
Circuit Analysis and Troubleshooting
Lecture 10: Amplifiers and Comparators
Over speed Trip Issue in unit 3
Grounds Tester GT400 or GT600.
Chapter 11 Supporting Printers and Scanners
Automotive Testing Automation
Confidential Oilfree Scroll Compressor   Simplex/Multiplex SRL kW   Troubleshooting Hitachi Industrial Equipment Systems Co., Ltd. Air Compressor.
Presentation transcript:

PSS test conducted twice a year to verify operation of PSS enables and operation ARC1 Fails PSS certification. Will not turn off when PSS signal is disabled Power Supply computer indicates that off signal has been sent, but hardwired signal indicates that Main Contactor is not de-energized. PSS will not drop to OFF/Safe status Main contactor disables after a while, and problem is not easily repeatable.

Main Contactor is sticking and does not decouple when control voltage is disabled. Investigation finds that Auxiliary contacts have been attached onto Main contactor using screws that were too long Long screws break through Bakelite material and small pieces onto rails of the armature assembly of the Main Contactor. This may have contributed to some of the “stickiness”, but not conclusive.

ALL power supplies with Auxiliary contacts have been checked for correct screw lengths. 9 Additional Supplies found to have incorrect screw length and minute debris in the Main Contactor All Contactors cleaned, voltage tested and replaced Additionally, power supply schematics are being revised for quicker diagnostics in the future

Changes or additions to existing equipment must be fully analyzed for correct configuration Non-routine tasks must be evaluated before work is conducted Test all equipment before installing Update schematics