TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC E. Top TPC Issues.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Presentation of the proposed Annex 19 – Safety Management
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
Chapter 10 Accounting Information Systems and Internal Controls
Enter System Name AdvancED TM External Review Exit Report Calhoun County School System Jacksonville, Alabama April 27-30, 2014.
AMP Meeting | February 20, 2014GAMA | Washington, DC G. ODA Improvement Action Plan.
Integrating CMC Review & Inspection Industry Recommendations Joe Anisko April 24, 2003.
JAA/FAA 20th Annual JAA/FAA International Conference 1 Repair Data Acceptance Presented by W. Schulze-Marmeling.
JLARC Study of Cost Allocation at Washington State Patrol Preliminary Report Keenan Konopaski, JLARC Staff Presentation to Joint Transportation Committee.
Implementing SMS in Civil Aviation: the Canadian Perspective.
Environmental Management Systems An Overview With Practical Applications.
ISO 9001:2015 “Risk Based Thinking”
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Role of ERCB in Synergy and Public Involvement Synergy Alberta Conference October 28, 2008.
Procurement Transformation State of North Carolina
ISO 9001:2015 “Risk Based Thinking”
FDA’s Perspective Continued - Where We Are ?. GMP Task Groups.
TPC Meeting | April 30 – May 1, 2014GAMA | Washington, DC E. Restructuring of Airworthiness Standards - Status of Part 23 & ASTM Standards - Strategy for.
Release & Deployment ITIL Version 3
Fundamentals of ISO.
AMP Meeting | February 20, 2014GAMA | Washington, DC F. FAA/EASA MAG Requirement for All New Parts.
Internal Auditing and Outsourcing
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
What is Business Analysis Planning & Monitoring?
AVS Repair, Alteration and Fabrication Team (RAFT) Results
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
Continual Service Improvement Process
NPDES Compliance Update NCMA Workshop April 1, 2015.
Engagement + Accreditation + (X) + (X) = Performance Management
Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
MARPA and You Working Together to Make PMA Successful March 31, 2011 Gorham Conference 1 Modification and Replacement Parts Association (MARPA)
Changes without Prior Approval Breakout Session Summary Rick Smith Aventis Pasteur, Inc.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
SMS Implementation Lessons Learned CTA COSCAP-NA Kim Trethewey.
U.S./Europe International Aviation Safety Conference By: Martin Thieringer – TCCA, Roger Simon – EASA, Scott Geddie – FAA Date: June 4, 2008 “Global Safety.
Holistic Approach to Security
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
Environmental Management System Definitions
October 2002 Field Approval Process Improvement. October Topics  Background  FAPIT Recommendations  Status  Volume 2, Chapter 1  M-DAR.
U.S./Europe International Aviation Safety Conference By: James Ballough, FAA, and Claude Probst, EASA Date: June 4, 2008 “Global Safety Management: Revolution.
SOFTWARE PROJECT MANAGEMENT
SMS Implementation Lessons Learned October th Steering Committee COSCAP-SEA, Macau 2 Sources ICAO Regional Workshop on Safety Management.
1. Establish the Client-Planner engagement 2. Gather client data and determine your goals and expectations (interview the person next to you and get the.
Progress in FDA’s Drug Product Quality Initiative Janet Woodcock, M.D. November 13, 2003.
Kathy Corbiere Service Delivery and Performance Commission
ISO 9001:2015 Risk-based thinking
Staying Current with Regulations ! Chris MARKOU Head, Operational Costs Management, IATA October 2015.
An overview of OECD Strategies for Improving Regulatory Performance Regulatory Reform and Building Governance Capacities – New Delhi 3 December 2009 Mr.
Structuring An Effective Project Management Office and IT Governance David Stokes, PMP Jane Matthews, PMP Florida Department of Health Division of Information.
Implementing Program Management Standards at Duke Energy.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Building an Effective Paperless Records Management Governance Structure BADM 559 Enterprise IT Governance Professor Michael Shaw By Moh’d A. Obeidat 12/15/2008.
SMS Implementation Lessons Learned. 2 Sources ICAO Regional Workshop on Safety Management Systems (SMS) and State Safety Programme (SSP) Implementation.
SUNY Maritime Internal Control Program. New York State Internal Control Act of 1987 Establish and maintain guidelines for a system of internal controls.
 P lanning is an intellectual process, consicous determination of courses of action, the basing of decisions on purpose, facts and considered estimates.
JMFIP Financial Management Conference
Implementing SMS in Civil Aviation: the Canadian Perspective
An oil company in Canada
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Improving the Garment Sector in Lao PDR:
IT Governance at the SCO
Roadmap to Enhanced Technical Regulations of WMO
Description of Revision
Human Resources Competency Framework
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
{Project Name} Organizational Chart, Roles and Responsibilities
Process and Procedure Documentation
Presentation transcript:

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC E. Top TPC Issues

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC GAMA Priorities “Top 3”  ODA Improvement and Implementation  Stronger measurement of performance - metrics to measure whether intent is being realized  Help push accountability with FAA  Better understanding of FAA employee union impact on implementation of ODA – change mgmt  Get the most out of it/refine it for a stable platform prior to next quantum leap being defined by ARC 21/SMS  must ensure value and step forward if going to DO and need cost-benefit- analysis for small to medium companies considering DO  Shift from Conformity to Configuration Management  Reduce burden of non-value added FAA legacy system  Update/modernize way to accomplish conformity intent

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC GAMA Priorities “Top 3” cont.  Accountability Framework – FAA Discretion  Better support for concepts to allow showing only compliance for things which are simple or commonly performed without issue  Consistency of Regulatory Interpretation  Employee behavior and culture has huge negative resource and cost impact on both FAA and Industry  ARC 313 – define implementation plan & vetting it between AIR- AFS-industry  Help push accountability with the FAA  AIR policy currently in place – being monitored/enforced?

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC GAMA Priorities “Top 3” cont.  Foreign Validation Efforts and Fees  Ensure Full Utilization and Effectiveness of Agreement/TVP  Unleaded Avgas Replacement  Leadership and proactive support form FAA  CPR – Stabilization, Clarity and Consistency  CPR is out of control and needs to be brought back in  Too many unknowns/unpredictability for future programs  Help drive industry position to FAA and gather backing & harmonization from other regulatory agencies on behalf of industry  FAA GAMA coordination/communication  need to have AFS at the table and part of our cert solutions

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC FAA/AIR Priorities “Top 3”  Full Utilization and Implementation of ODA  Proactive change management  Leadership must continue to drive cultural change throughout the ACO toward full utilization of ODA and systems oversight  Full unencumbered implementation of ODA responsibility per the regulation and Order  Acceptance and activation of pending ODA applications  FAAs resource problems  Sequencing projects  Should not be the way of doing business in the FAA  ACO Certification Project Activity Performance  Establish and monitor turn time metrics (i.e. cert plan approval, issue paper response, ICA review, etc)  Reduction in STC and MRA project PNL response time  AEG last minute evaluations  Implement SOP for resource prioritization  Identify opportunities for improvement

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC FAA/AIR Priorities “Top 3” cont  Reorganization and Restructuring of FAA  Manner that fits within their long term budget projections  Fosters efficient internal processes, inter-agency coordination  Renewed purpose and culture for their workforce How can industry encourage and support such a dramatic but sorely needed change???

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC FAA/AIR Priorities “Top 3” cont.  Harmonize oversight of Inspection UMs to avoid in person oversight  Why cant a DAR oversight by FAA be utilized in Lieu of an On-scene oversight inspection when backed by tele interviews and paper?  The education of FAA ACO/SAD staff on the practical implications of each STC amendment and application  Many problems are created by the FAA’s lack of practical knowledge regarding how the STC is implemented and what it affects on the existing approved design

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC FAA/AIR Priorities “Top 3” cont.  ARC 312 implementation plan  Update implementation status monthly and ensure this top priority within the FAA is successful  Pull ARC back together to pulse and validate FAA’s measures of implementation progress to date  Increased leadership/assistance with international certification projects, especially China and EASA  Bilateral enforcement and following the BMR process  ICA delegation xx.1529  Major/Minor  see some action on is the major / minor white paper that came from the Part 23 ARC  Benefit from getting an endorsement by FAA policy letter

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC FAA/AIR Priorities “Top 3” cont.  Edit existing/Develop New Guidance  Guide to applicants in form of SAE or RTCA guideline to project management based on a WMS system (see MIL-STD-881)  Small company design organization manual (23ARC Rec)  Revised policy and decision on rulemaking for EME/structural lightening protection  Complete this activity per the Part ARC recommendations  SC 216 and Security Policy including proposed special conditions.  Scope of the issue needs GA viewpoint. The SC anticipates one process that fits all – not realistic- risks to low end GA are small and not commensurate with cost and effort proposed.  Non-TSO definition is all over the map in both guidance and policy as well as how it applied. Need appropriate consistent application of Non-TSO function at the appliance level and the aircraft level. Further, the “credit” for non-TSO functions at the installation needs to be clarified

TPC Meeting | October 1 st – 2 nd, 2013GAMA | Washington, DC FAA/AIR Priorities “Top 3” cont.  Improve Communications  Centralized electronic library for all regulations, preamble, guidance, policy, etc (CRI-ARC Rec)  Use of SharePoint to communicate/submit docs with the FAA