Final Rule on Temporary Traffic Control Devices 23 CFR 630 Subpart K Chung Eng, Office of Transportation Operations National WZ Safety Clearinghouse Webinar.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Retroreflectivity: Raising the Nighttime Brightness of Traffic Signs and Markings Office of Technology Applications Peter Hatzi.
Work Zone Traffic Management
How would you like it if people drove their cars thru your office?
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
FHWA Work Zone Program Federal Highway Administration Office of Safety Integration Washington, DC July 22, 2008.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Use of Uniformed Police Officers on Federal-Aid Highway Construction Projects Executive Summary Presentation Prepared by Editor’s Ink Subcontractor to.
Road Safety & Awareness Training Your “Right to Know” 29 CFR 1926 / DOT MUTCD This material was produced under grant number SH22297-SH1 from OSHA. It does.
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Safety for Workers on Foot. Safe Practices  Consider worker behavior when developing the ITCP. Determine locations where workers are likely to go.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Florida Department of Transportation, November 2009
Preventing Runovers and Backovers
Office of Highway Safety Highway Factors David Rayburn.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
11 In Partnership with:. 2 Program Overview l Extent of the Problem l Planning, Multi Agency Communication, Coordination & Response l Legal & Regulatory.
Lesson 6 Traffic Safety Protecting People While Stabilizing The Incident.
Guidelines for Traffic Control at Surface Mines
Road Safety Audits Ghazwan al-Haji PhD student ”On whats goes wrong in road design and how to put it right safely”
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Guidelines for Traffic Control at Surface Mines
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Preventing Runovers and Backovers
Transportation Management Plan Overview Module 3.
Work Zone Safety Awareness. What is a Work Zone?  Work Zone is a term applied specifically to highway and road construction sites involving federal government.
Work Zone Safety and Traffic Management Alazar Tesfaye, PE Traffic Operations Engineer Colorado DOT Transportation Systems Management and Operations Division.
Old Policy – which no one ever seem to have heard of.
1-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Introduction – Session #1.
Wisconsin Contractor-Engineer Conference January 22, 2009 Safety Apparel, FHWA Work Zone Safety Subpart K Rule & Permanent Concrete Barriers Bill Bremer,
1-1 Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations.
MODULE 2 ROLES AND PROCEDURES
FHWA10/1/ MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES REWRITE AND OUTREACH EFFORT TARGET DATE: 2001.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Overview of the Work Zone Safety and Mobility Rule Module 1.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
1 Federal Highway Administration, USDOT Implementing the Rule on Work Zone Safety and Mobility.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Overview of FHWA’s Work Zone Safety Grants (2006 and 2011) Overview of FHWA’s Work Zone Safety Grants (2006 and 2011)
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
Work Zone Rule Virtual Workshop – Rule State of the Practice Overview.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
1 Federal Highway Administration Work Zone Safety and Mobility Rule Implementation of Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Road Ranger / TMC Operator Joint Training Module 101 MODULE 10 MODULE 10 Road Ranger Work Zones.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Understanding Work Zones
5/8/02FHWA Office of Safety1 FHWA Safety Core Business Unit Office-Level Structure Develops and manages programs for the safe operation of roadways, bicycle.
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Introduction – Session #1.
1 IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Greg Davis FHWA Office of Safety RD&T U.S. Department of Transportation.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Work Zone Safety Guidelines For Maintenance, Construction and Traffic Personnel.
2011 Road School Work Zone Traffic Control Handbook.
2009 Manual on Uniform Traffic Control Devices
Georgia Struck By Alliance
Traffic Operations Division
Design Consistency and Positive Guidance
HERO UNIT Training Module
Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing.
MODULE 10 Road Ranger Work Zones
Presentation transcript:

Final Rule on Temporary Traffic Control Devices 23 CFR 630 Subpart K Chung Eng, Office of Transportation Operations National WZ Safety Clearinghouse Webinar – June 26, 2008

Agenda Background Background Overview of New Rule Overview of New Rule Summary Summary Resources Resources

Facts Our highway infrastructure is aging and the need for rehabilitation and reconstruction is growing. Our highway infrastructure is aging and the need for rehabilitation and reconstruction is growing. Much of this work is occurring while traffic is maintained on the facility under repair. Much of this work is occurring while traffic is maintained on the facility under repair.

Exposure Approximately 20% of NHS under construction during peak construction season Approximately 20% of NHS under construction during peak construction season More than 3,000 WZs are expected to be present on the NHS during the peak More than 3,000 WZs are expected to be present on the NHS during the peak Approximately 12 billion vehicle miles of travel a year will be through active work zones Approximately 12 billion vehicle miles of travel a year will be through active work zones Motorists can expect to encounter an active work zone 1 out of every 100 miles driven on the NHS Motorists can expect to encounter an active work zone 1 out of every 100 miles driven on the NHS

Safety Over the last 10 years, WZ fatalities increased 45% (up to 1,010 in 2006) Over the last 10 years, WZ fatalities increased 45% (up to 1,010 in 2006) More than 40,000 people are injured each year as a result of crashes in WZs More than 40,000 people are injured each year as a result of crashes in WZs This translates to: - One WZ fatality every 8.7 hours (almost 3 a day) - One WZ injury every 9 minutes (160 a day)

The need for rehabilitation and reconstruction is not going away We must do better when we design our work zones so that they work better

Regulations Work Zone Safety & Mobility Rule (Subpart J) Work Zone Safety & Mobility Rule (Subpart J) - Published September Effective October Established framework for systematic consideration and management of WZ safety & mobility impacts Temp. Traffic Control Devices Rule (Subpart K) Temp. Traffic Control Devices Rule (Subpart K) - Published December 5, Effective December 4, Supplements Subpart J with additional safety considerations

SAFETEA-LU Section 1110 Requirements Mandates rulemaking to establish conditions for appropriate use of, and expenditure of funds for: Mandates rulemaking to establish conditions for appropriate use of, and expenditure of funds for: 1. Positive protective measures between workers and traffic; 2. Uniformed law enforcement officers; 3. Installation & maintenance of temporary traffic control devices Mandates separate pay items in contracts to ensure projects include costs for these safety measures when the measures are necessary Mandates separate pay items in contracts to ensure projects include costs for these safety measures when the measures are necessary

Overview of Subpart K NPRM published November 1, 2006 NPRM published November 1, 2006 Comment period closed February 16, 2007 with 60 substantive comments received Comment period closed February 16, 2007 with 60 substantive comments received Final Rule published December 5, 2007 Final Rule published December 5, 2007 Implement by December 4, 2008 Implement by December 4, 2008 Goal: Decrease Work Zone fatalities & injuries to workers and road users Approach: Build on processes, procedures, and/or guidance implemented under Subpart J Build on processes, procedures, and/or guidance implemented under Subpart J Establish minimum requirements and provide guidance Establish minimum requirements and provide guidance

Key Components of New Rule Added emphasis on safety in WZ policy Added emphasis on safety in WZ policy Positive protection devices Positive protection devices Exposure control measures Exposure control measures Other traffic control measures Other traffic control measures Uniformed law enforcement Uniformed law enforcement Safe entry/exit for work vehicles and equipment Safe entry/exit for work vehicles and equipment Payment for traffic control features & operations Payment for traffic control features & operations Quality guidelines Quality guidelines

Work Zone Policy The policy and related processes, procedures, and/or guidance established under Subpart J shall include consideration of road user and worker safety by addressing: Use of positive protection devices to prevent intrusions; Use of positive protection devices to prevent intrusions; Exposure control measures to minimize exposure; Exposure control measures to minimize exposure; Other traffic control measures to minimize crashes; Other traffic control measures to minimize crashes; Safe entry/exit of work vehicles and equipment onto/from the travel lanes Safe entry/exit of work vehicles and equipment onto/from the travel lanes

Work Zone Policy Agency processes, procedures, and/or guidance should be based on consideration of standards and/or guidance in the MUTCD and the AASHTO Roadside Design Guide, as well as project characteristics and factors. Agency processes, procedures, and/or guidance should be based on consideration of standards and/or guidance in the MUTCD and the AASHTO Roadside Design Guide, as well as project characteristics and factors.

Positive Protection Devices Use shall be based on an engineering study Use shall be based on an engineering study An engineering study may be used to develop positive protection guidelines, or to determine appropriate measures for an individual project An engineering study may be used to develop positive protection guidelines, or to determine appropriate measures for an individual project The engineering study should be based on consideration of factors and characteristics such as: The engineering study should be based on consideration of factors and characteristics such as:

Example factors and characteristics to consider: 1. Project scope and duration; 2. Anticipated traffic speeds through the work zone; 3. Anticipated traffic volume; 4. Vehicle mix; 5. Type of work (as related to worker exposure and crash risks); 6. Distance between traffic and workers, and extent of worker exposure; 7. Escape paths available for workers to avoid a vehicle intrusion into the work space; 8. Time of day (e.g., night work); 9. Work area restrictions (including impact on worker exposure); 10. Consequences from/to road users resulting from roadway departure; 11. Potential hazard to workers and road users presented by device itself and during device placement and removal; 12. Geometrics that may increase crash risks (e.g., poor sight distance, sharp curves); 13. Access to/from work space; 14. Roadway classification; and 15. Impacts on project cost and duration.

Positive Protection Devices Examples of conditions that may warrant use of positive protection: WZs that provide workers no means of escape from motorized traffic; WZs that provide workers no means of escape from motorized traffic; Long duration WZs that result in substantial worker exposure to traffic Long duration WZs that result in substantial worker exposure to traffic Projects with high anticipated operation speeds Projects with high anticipated operation speeds Work operations that place workers close to travel lanes open to traffic Work operations that place workers close to travel lanes open to traffic Roadside hazards that will remain in place overnight or longer Roadside hazards that will remain in place overnight or longer Use of positive protection shall be considered where workers are at increased risk from traffic and where positive protection devices offer the highest potential for increased safety for workers and road users

Exposure Control Measures Exposure control measures should be considered to avoid or minimize exposure for workers and road users Full road closures Full road closures Ramp closures Ramp closures Median crossovers Median crossovers Full or partial detours or diversions Full or partial detours or diversions Protection of WZ setup and removal using rolling road blocks Protection of WZ setup and removal using rolling road blocks Performing work at night or during off-peak periods Performing work at night or during off-peak periods Accelerated construction techniques Accelerated construction techniques

Other Traffic Control Measures Effective, credible signing; Changeable message signs; Arrow panels; Warning flags and lights on signs; Longitudinal and lateral buffer space; Trained flaggers and spotters; Enhanced flagger station setups; Intrusion alarms; Rumble strips; Pace or pilot vehicle; High quality work zone pavement markings and removal of misleading markings; Channelizing device spacing reduction; 13. Longitudinal channelizing barricades; 14. Work zone speed management (including changes to the regulatory speed and/or variable speed limits); 15. Law enforcement; 16. Automated speed enforcement (where permitted by State/local laws); 17. Drone radar; 18. Worker and work vehicle/equipment visibility; 19. Worker training; 20. Public information and traveler information; and 21. Temporary traffic signals. Other traffic control measures should be considered to reduce WZ crashes and risks and consequences of intrusions into the work space.

Uniformed Law Enforcement Basic interagency agreements between the highway agency and appropriate law enforcement agencies to address work zone enforcement needs; Interaction between highway and law-enforcement agency during project planning and development; Conditions where law enforcement involvement in work zone traffic control may be needed or beneficial, and criteria to determine the project-specific need for law enforcement; 4. General nature of law enforcement services to be provided, and procedures to determine project- specific services; 5. Appropriate work zone safety and mobility training for the officers, consistent with the training requirements in 23 CFR (d); 6. Procedures for interagency and project-level communications between highway agency and law enforcement personnel, and 7. Reimbursement agreements for law enforcement service. Each agency, in partnership with the FHWA, shall develop a policy addressing the use of uniformed law enforcement on Federal-aid highway projects. The policy may consist of processes, procedures, and/or guidance. The processes, procedures, and/or guidance should address the following:

Uniformed Law Enforcement In general, the need for law enforcement is greatest on projects with high traffic speeds and volumes, and where the work zone is expected to result in substantial disruption to or changes in normal traffic flow patterns. Specific project conditions should be examined to determine the need for or potential benefit of law enforcement, such as the following: i. Frequent worker presence adjacent to high-speed traffic without positive protection devices; ii. Traffic control setup or removal that presents significant risks to workers and road users; iii. Complex or very short term changes in traffic patterns with significant potential for road user confusion or worker risk from traffic exposure; iv. Night work operations that create substantial traffic safety risks for workers and road users; v. Existing traffic conditions and crash histories that indicate a potential for substantial safety and congestion impacts related to the work zone activity, and that may be mitigated by improved driver behavior and awareness of the work zone; vi. Work zone operations that require brief stoppage of all traffic in one or both directions; vii. High-speed roadways where unexpected or sudden traffic queuing is anticipated, especially if the queue forms a considerable distance in advance of the work zone or immediately adjacent to the work space; and viii. Other work site conditions where traffic presents a high risk for workers and road users, such that the risk may be reduced by improving road user behavior and awareness.

Work Vehicles and Equipment The agency processes, procedures, and/or guidance established under Subpart J should also address safe means for work vehicles and equipment to enter and exit traffic lanes and for delivery of construction materials to the work space, based on individual project characteristics and factors.

Payment Payment for traffic control features and operations shall not be incidental to the contract, or included in payment for other items of work not related to traffic control and safety Payment for traffic control features and operations shall not be incidental to the contract, or included in payment for other items of work not related to traffic control and safety Separate pay items shall be provided for major categories of traffic control devices, safety features, and WZ safety activities Separate pay items shall be provided for major categories of traffic control devices, safety features, and WZ safety activities For method-based specs, unit price pay items, lump sum pay items, or a combination thereof may be used For method-based specs, unit price pay items, lump sum pay items, or a combination thereof may be used Specs should include provisions to require and enforce compliance with implementation and maintenance of the project TMP and related traffic control items Specs should include provisions to require and enforce compliance with implementation and maintenance of the project TMP and related traffic control items

Quality Guidelines Each agency shall develop and implement quality guidelines to help maintain the quality and adequacy of the temporary traffic control devices for the duration of the project Each agency shall develop and implement quality guidelines to help maintain the quality and adequacy of the temporary traffic control devices for the duration of the project A level of inspection necessary to provide ongoing compliance with the quality guidelines shall be provided A level of inspection necessary to provide ongoing compliance with the quality guidelines shall be provided

In Summary New Rule provides for supplementing the WZ processes and procedures developed under Subpart J to specifically address appropriate consideration of positive protection devices, exposure control measures, and other traffic control measures in order to help reduce WZ fatalities and injuries. New Rule provides for supplementing the WZ processes and procedures developed under Subpart J to specifically address appropriate consideration of positive protection devices, exposure control measures, and other traffic control measures in order to help reduce WZ fatalities and injuries. A policy addressing the use of uniformed law enforcement on Federal-aid projects is required. A policy addressing the use of uniformed law enforcement on Federal-aid projects is required. Specific provisions are included that address appropriate payment and quality assurance for necessary safety features. Specific provisions are included that address appropriate payment and quality assurance for necessary safety features. Quality guidelines are implemented along with appropriate level of inspection. Quality guidelines are implemented along with appropriate level of inspection.

What We Expect to See Increased consideration and management of worker and motorist safety in WZs Increased consideration and management of worker and motorist safety in WZs More strategic and effective use of uniformed law enforcement in WZs More strategic and effective use of uniformed law enforcement in WZs More clarity on and better provisions for safety features needed on projects More clarity on and better provisions for safety features needed on projects Better quality devices Better quality devices Safer WZs Safer WZs

Resources FHWA Website NPRM NPRM Final Rule Final Rule Questions & Answers Document Questions & Answers Document WZ Peer-to-Peer Program

Additional Resources WZ Safety Grant Products WZ Positive Protection Toolbox (6/08) WZ Positive Protection Toolbox (6/08) Laminated Cards for Shadow Vehicle Placement (8/08) Laminated Cards for Shadow Vehicle Placement (8/08) Decision Tool for When to Use Positive Protection (11/08) Decision Tool for When to Use Positive Protection (11/08) WZ Safety Audits (in development) WZ Safety Audits (in development) National WZ Safety Information Clearinghouse

Additional Resources Workshop Development of Policy on Use of Law Enforcement in WZs (in development) Development of Policy on Use of Law Enforcement in WZs (in development)Contacts: FHWA Division Offices FHWA Division Offices Chung Eng (202) Chung Eng (202) Ken Wood (708) Ken Wood (708)

Questions??