Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.

Slides:



Advertisements
Similar presentations
Next Home Visio2 troubleshooting guide Start the slide show then click Next.
Advertisements

H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Cold-Plus™ Refrigerant Enhancer
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
F AEM - 22 Jan 07 Separator Spark History Ron Moore Fermilab – Tevatron Dept.
Next Home EcoCompact troubleshooting guide Start the slide show then click Next.
KEK (High Energy Accelerator Organization), Japan
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
The Whole System. Ford DPFE EGR System 2. Pintle opens 1. vacuum applied 3. EXHAUST GAS FLOWS No Electronics at the Valve.
Pelletron Battle – Field Report All Experimenters’ Meeting August 15, 2011 L. Prost (for A. Shemyakin)
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Source Workshop Pre-accelerator Operations Dan Bollinger.
USA ZAMA BASIC BIS. USA ZAMA What is BIS ?  What does BIS mean? – BIS is an acronym for B alanced I dle S ystem – The BIS system is part of the idle.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Recent FETS Ion Source Measurements UK Neutrino Factory Plenary Meeting 8-9 June 2010 Rutherford Appleton Laboratory Dan Faircloth Faircloth.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Lab Course: Ion Sources Larry Lamm Research Professor Technical Director of the NSL Winter 2008.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Thermionic Valves.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
DC photogun vacuum characterization through photocathode lifetime studies Marcy L. Stutzman, Philip Adderley, Joseph Grames, Matthew Poelker, Ken Surles-Law.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
Low-contamination Rare and Exotic Beams (at CARIBU) Sergey Kondrashev October 16, 2012.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
Studies on 2.45 GHz microwave ion sources Abhishek Nag IISER, KOLKATA Presented By: G.O. Rodrigues IUAC, New Delhi Supervised By:
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
H- ion source development at FNAL Dan Bollinger.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
H - Ion Source Development at FNAL Alejandro Garcia Sosa Proton Accelerators for Science and Innovation Workshop Nov
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
DC Sputtering Disadvantage #1 Low secondary electron yield
Diagnosing & Repair Late model vehicles (OBD II) can be checked with the scan tool for the following problems: Crankshaft Position Sensor Crankshaft Speed.
Completion of the MICE-US construction project
14 Refrigerant Recovery, Recycling, and Recharging.
Hemodialysis Lecture 3.
BEPCII RF POWER SOURCE AND INPUT COUPLER
Fuel Supply System Service
PEP-II RF System Status and Upgrades
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
ISRC and LEBT Vacuum System Design
FNAL Hybrid Testing Status
Presentation transcript:

Proton Source Repairs Dan Bollinger 2/1/10

Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to the entire complex (sans HINS) I- H-

Each Pre- acc consists of 2 main parts H- ion source Accelerating column Ref: C. Schmidt; Proton and H- sources at Fermilab Jan

Negative ion source (magnetron) Ref: Handbook of ion Sources; Bernard Wolf Cesium on cathode lowers work function of molybdenum (Mo) cathode to enhance H- production: Work function for Mo is 4.6eV Work function for Mo + Cs is 1.8eV Lowest work function when there is a 0.6 monolayer of Cs Source operation relies on surface plasma effect Plasma produces energetic particles that strike the cathode surface H- ions are produced by desorption or reflection from a cesium coated cathode surface Ref: C. Schmidt; Proton and H- sources at Fermilab Jan

Negative ion source (magnetron) con’t Source from column perspective Ion source points down. The H- is extracted and bent 90deg to enter accelerating column The ion source resides in the dome at the upstream end of the column Ref: C. Schmidt; Proton and H- sources at Fermilab Jan

Negative ion source (magnetron) con’t Typical source aging related failures Aperture restricted by cathode flakes that have fallen off Cathode erosion Hydrogen inlet/valve blocked by cesium hydride Sources last on the order of 3 months and usually fail from one of these type of problems

H- source since start-up Source has been taken out and rebuilt twice Source output not all that stable over long run New source has a good arc/beam current flattop Old sources have flattops that fall off on the trailing edge which is usually why they are taken out and rebuilt Typical signs of aging source

H- source since start-up con’t Water resistor needs flushed 1/month Conductive material accumulates around electrodes and causes voltage drops/imbalances on the accelerating column

H- source since start-up Ion pump out gassing due to end of lifeOut gassing affects on source operation Increases in gas pressure perturbs feedback loops Instabilities in source take fair amount of time to recover from Increasing frequency and magnitude of ion pump out gassing near end of pump life

H- source since start-up Ion pump was replace during shutdown last week 2400 L/s ion pump We reached a point where we were not able to increase the hydrogen gas pressure to keep the source operating (cesium hydride blocking gas inlet)

I- column failure Prior to shut down the I- column would not hold off above 500kV with out arcing over Hipot of column showed 1 accelerating gap was the problem

I- column repair 1 st time new column has been built in over 25yrs !! Ceramic severely damaged New column built on site Column pulled off of wall New column has been installed and conditioned to 760kV

I- source problems We have installed 2 sources for a total of 7 times into the I- column I- source arc current since we have tried to start sources after rebuilding the column The longest lived source has been about 18hrs The sources die off has been the same every time Possibilities: Cathode poisoning by some contamination Gas leak that is displacing the hydrogen Something with new accelerating column ?

I- source problems con’t Problems so far with sources: Badly eroded cathode Ion gauge Gas valves (both sources) Extractor cable failed Cs power supply failed HV regulation Ion pump occasional out gassing (not as bad as H-) Arc modulator powersupply Work done to try and fix overall problem: Leak checks RGA scan (nothing out to 100amu) Further RGA scans to 200 amu Tried source on test stand (longevity test) Cleaned cesium boiler tubes Lots of tuning Changed hydrogen valves On top of mysterious die off of the sources there have been equipment problems

Shameless Plug….. Based on Brookhaven design: round aperture dimpled cathode vacuum chamber: cube with lots of pumping Operationally: lower arc current higher extractor voltage better vacuum pumping at the source longer lifetime (hopefully) H- current40-60mA Extraction Voltage35kV Arc Voltage V Arc Current~10A Rep Rate15Hz Pulse width100ms Duty Factor0.12% Accelerating Voltage35kV Proposed upgrade to existing 750kV system