ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation.

Slides:



Advertisements
Similar presentations
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Advertisements

I-80 Corridor System Management Plan Alameda County Transportation Commission ACTAC Meeting September 7, 2010.
Ohio QuickClear TIM Training subtitle. QuickClear Committee AAA Ohio Buckeye State Sheriff’s Association Ohio Association of Chiefs of Police Ohio Department.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
Presented by: SAGE KAMIYA, P.E., PTOE
Management and Operations In MPO Planning Christopher O’Neill.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
TSP Must Fit Within An Overall Agency ITS Plan. Transit Priority Data Needs Vehicle Location –Speed Door & Lift Status –Predictions Passenger Counting.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Jeffrey F. Paniati Executive Director Federal Highway Administration US Department of Transportation Washington, DC Reducing Congestion Tools of.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
GoBerkeley 1 goBerkeley: Integrating TDM and Parking Management into Downtown Berkeley Monday, October 28 th, 2013 Steer Davies Gleave 970 – 355 Burrard.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
Urban Partnership Agreement Summary August 27, 2007.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration US Department of Transportation Looking Forward to a High Performance.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
Southeast Michigan Council of Governments. Working Together to Improve Regional Operations through Traffic Incident Management Working Together to Improve.
Mn/DOT Metro District 20- Year Highway Investment Plan Update: (Adopted: December 21, 2011) FHWA and Georgia Operations Summit and Planning for.
Georgia’s Intelligent Transportation System
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
FAST Lanes Program Transportation and General Government Policy Committee Association of Metropolitan Municipalities August 16, 2004 Minnesota Department.
ITS PCB T3 Webinar October 21, 2008 Montgomery County, Maryland Advanced Transportation Management System Automated Parking Information System Operational.
Brian Kary Minnesota Department of Transportation.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Integrated Corridor Management (ICM) Brian P. Cronin, P.E.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
Technology Subcommittee November Topical Outline Technology Subcommittee Technology Subcommittee RoleRole Work PlanWork Plan ActivitiesActivities.
Brian Kary – Freeway Operations Engineer Minnesota Department of Transportation.
Brian Kary Minnesota Department of Transportation.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
Pioneer ICM site in Seattle – SoDo Corridor Vinh Q. Dang, WSDOT.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Metropolitan Council Transit Capital Improvement Program October 10, 2007.
Public Transit & Transportation Network Companies
Integrating Transit and Highway Solutions In High Volume Corridors
Using iPeMS Performance Management Data
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Presentation transcript:

ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation

2 Operational – I-394 Existing Corridor Networks

3 Operational – Why our Site needs ICM Locations of Recurring Congestion

4 Operational – Why Are Site Needs ICM I-394 Travel Times Eastbound PM PEAK Westbound

5 Operational – Why our Site needs ICM Gaps in Coordination Between Traffic and Transit Management Centers –During Normal Conditions –During Incident Conditions Gaps in Incident Data On Arterial Network –State Patrol Response –Local PD Response

6 Operational – Why our Site needs ICM Lack of Traveler Information for Arterials and Transit –Comparative Travel Times –Park and Ride Availability Planning for Special Event Congestion –Future Minnesota Twins Stadium –Existing Minnesota Timberwolves Stadium

7 Operational – How ICM will help our Site Provide Traveler Information Across All Networks and Modes –Freeway Travel Times –Transit Travel Times –Arterial Travel Times –Park and Ride Availability Improved Agency Communication and Coordination –Improved Incident Management and Detection on Arterials –Coordinated Incident Signal Timing Plans –Transit Rerouting During Incidents Reduce Congestion and Improve Trip Reliability

8 Institutional – Who are our ICM Stakeholders Mn/DOT (Freeway, Arterials, MnPASS) Hennepin County (Traffic, EMS dispatch) City of Minneapolis (Traffic, EMS dispatch) Transit Agencies (Metro Transit, SW Transit, Plymouth Transit) Minnesota State Patrol

9 Institutional – How our Site defined Roles and achieved Buy-in among ICM Stakeholders Mn/DOT Lead Role Consultant Hired to Write ConOps and SRS Steering Committee and Working Group Meetings Stakeholder Workshop Individual Stakeholder Meetings Project Management Team

10 Technical – What our proposed ICMS will look like Connection of Existing Systems Add-ons to Existing Systems ICMS Data Hub

11 Technical – What our proposed ICMS will look like Logistical Diagram of Metro Transit Control Center

12 Technical – What our proposed ICMS will look like Functional Diagram of Metro Transit Control Center

13 Technical – What our proposed ICMS will look like Logistical Diagram of Mn/DOT Traffic Operations

14 Technical – What our proposed ICMS will look like Planned Instrumentation of Hwy 55 and Hwy 7 with CMAQ Funds Gaps in Providing Arterial Travel Time Gaps Jointly Developed Incident Signal Timing Plans

15 Technical – What our proposed ICMS will look like Existing AVL System on Metro Transit Plymouth Metrolinks and Southwest Currently Do Not Have AVL Systems Challenge in Providing Accurate Park and Ride Lot Vehicle Counts Comparative Travel Times Between Transit and Freeway –Historical Data Vs. Real-time Data –Planned UPA Transit Travel Time Comparison Project

16 Technical – What our proposed ICMS will look like OBJECTIVEPERFORMANCE MEASURE Reduce the variation in travel times Buffer Index – The amount of time travelers must allow to ensure they are on-time 95% of the time. Maximum travel times experienced by travelers throughout the corridor Range of travel times (and variability) experienced by travelers Percentage of ‘late’ bus routes throughout the corridor. Maintain options for travelers’ Average parking availability per facility and time of day Comparisons of transit, HOV/HOT lanes, Freeways, and arterial route performance Percentage of corridor (routes and modes) reported on in real-time (travel times, delays, space availability, speeds etc.) Monitor and understand the ever changing available capacity Percentage of corridor (routes and modes) reported on in real-time (travel times, delays, space availability, speeds etc.) Encourage pattern changes to better utilize spare capacity Percentage of drivers altering route or mode based on traveler information Average capacity utilization across all modes during incidents and normal conditions.

17 Technical – What our proposed ICMS will look like OBJECTIVEPERFORMANCE MEASURE Inform travelers of incidents & impacts Number of events where viable alternates are delivered to travelers (either via. phone, web or push) Number of callers receiving alternate route/mode information Web page hits and call volumes during incident events Manage traffic around events Number of closures where vehicles are routed onto appropriate alternate routes Number of times alternate plans are implemented, and the real-world results. Response/ clearance times for major events. Travelers are aware of their modal and route options Web page hits, phone requests, and push deliveries of specific route/mode options Travelers do not experience delays without also being informed of options Travelers’ feedback after incidents and events.

18 Lessons Learned – Operational Difficult Not to Focus on Technology Use of Operational Scenarios to Engage Stakeholders –Recommend Developing Operational Scenarios First –Assumed Connectivity or Coordination Between Centers –Recognized New Partners During Discussions Near Term Strategies to Achieve Benefits of ICM Sooner

19 Lessons Learned - Operational Incident Data Sharing Example –Near Term Strategy Manual sharing of incident data via , phone or radio. –Long Term Strategy Automated sharing of incident data via integrated CAD/AVL systems. Came From Meetings with Stakeholders! Either: –Require Basic Agreements / Procedural Changes –Already Existing or Funded Development in process

20 Lessons Learned – Operational I-35W Bridge Collapse Improved Coordination and Communications Between Stakeholders in Responding to Changing Traffic Conditions Weekly Traffic Operations Meetings Including Freeway, Arterials, and Transit Staff – likely to continue as biannual meetings.

21 Lessons Learned – Operational I-35W Urban Partnership Agreement Conversion of I-35W HOV Lanes to MnPass HOT Lanes Arterial Traffic Management on Hwy 13 Transit Traveler Information –Park and Ride Lot Availability –Next Bus Arrival Times –Travel Time Comparisons Improved Traveler Information Across All Networks and Modes.

22 Lessons Learned – Institutional Stakeholder Concerns of Usefulness of ICM Lack of Spare Capacity on Alternate Routes Focus More on Incident Management and Buffer Time Index Overcoming the Legacy of Past Project Failures

23 Lessons Learned – Institutional Ownership, Maintenance, Operations Legal Issues Allowing Joint Control Equipment Assigning Agency Responsibility – eliminate wish list Virtual System – Enhancements to existing systems

24 Lessons Learned – Institutional Maintaining Stakeholder Interest in ICM Making ICM a Priority What’s in it for me? Major Incident Debriefing Related to ICM

25 Lessons Learned – Institutional January 9 th Tanker Rollover Occurred at 9:10 AM Tanker carrying 8,000 gallons of fuel Interchange of I-94 and I-394 Multi-agency response –Minneapolis Police and Fire –State Patrol –Mn/DOT –HazMat –Ambulance –Minneapolis Traffic –Transit

26 Lessons Learned – Technical Develop Functional Diagrams and Logistical Diagrams Early Defining Requirements for New Techniques –TT calculation frequency –How often do you really need it? –Storage of data? Associated cost?