NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of Tully, New York Region 3 PIN 3501.76, Contract No. D900023 Onondaga.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Procurement Management
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
New York State Department of Transportation Rochester Station PIN , Contract DH34463 Design-Build Project Request for Qualifications Informational.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028) Saratoga, Warren, and Washington Counties.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project PIN , Contract No. D Town of Babylon, Suffolk County.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 146 Over the Mohawk River Design-Build Project PIN , Contract No. D Town of Niskayuna, Schenectady.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
New York State Department of Transportation
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN , Contract No. D Town of Chemung, Chemung County.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-190 & NY Rt. 265 Over NY Power Authority Reservoir Design-Build Project Draft Request for Proposals RFP Informational.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements At Various Locations in Regions 2 & 9 PIN , Contract No. D
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 Route 111 to Mount Pleasant Road Design-Build Project Request for Qualifications Informational.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure (4) and Bridge (3) Replacements At Various Locations in Region 9 PIN , Contract No. D
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
New York State Department of Transportation
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Office of Procurement Services.  Vendor Application Website: 
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 8 Bundled Bridges (Columbia & Dutchess Counties) PIN 8BOW.0A, Contract No. D Draft Request for.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Preparing & Evaluating RFPs The PMO Role Kim Brain Senior Project Manager, Brain Works Consulting, LLC.
PRE-PROPOSAL CONFERENCE Welcome! Conference Room A/B NYSDOT 50 Wolf Rd, Albany NY Monday July 15, :00 to 12:00 Noon NEW YORK STATE DEPARTMENT.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Green Line Extension Project
Designers’ Manual Overview and Chapter Contents
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Presentation transcript:

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of Tully, New York Region 3 PIN , Contract No. D Onondaga County Draft Request for Proposals RFP Informational Meeting September 3, 2014

Catherine Traina Attn: Interstate 81 Bridges Over Route 80 in R3 Design-Build Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Rules of Contact 2

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Agenda  Project Overview  Department’s Goals & Project Requirements  Scope of Work  Status of ROW and Utilities  General Contract Information  Procurement Schedule  RFP Content  Quality Control & Quality Assurance  Evaluation and Selection  Additional Information and Submission Guidelines  Questions and Answers 3

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) General Location 4 Interstate 81 over Route 80 Town of Tully, Onondaga County N

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) BIN Interstate 81 SB Over Route 80 (BIN )

6 Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) BIN Interstate 81 NB Over Route 80 (BIN )

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Goals 7  Ensure a long service life for all Project elements to satisfy long term preservation goals  Ensure the safety of the traveling public  Maximize the impact of public investment by: Providing cost-effective solutions that maximize value over the lifespan of the project Sequencing construction to minimize effects on vehicular traffic operations Reducing future maintenance requirements Minimizing effects on the local community Minimizing impacts on the environment

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Goals (Continued) 8  Deliver the Project safely, on schedule, and within budget  Ensure coordination with utility owners, third parties, the surrounding community, Project stakeholders, and any adjacent construction projects  Ensure compliance with the Project’s environmental commitments and conditions  Provide best value to the Department

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) General Scope of Work  Full bridge replacement (substructures and superstructures) of the following bridges:  BIN – I-81 SB over Route 80  BIN – I-81 NB over Route 80  Removal of existing substructures and superstructures, including potential remediation and disposal of lead paint and asbestos- containing materials  Approach roadway reconstruction as required to connect the existing roadways to the new bridges, including guide rail replacement  Construction of asphalt paths on the north and south sides of Route 80 between the Route 11 intersection and the Route 11A intersection 9

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D ) General Scope of Work (Continued)  Cleaning of existing ditches along both sides of Route 80 between the Route 11 intersection and the Route 11 A intersection  Replacement of ground-mounted signs along Route 80 between the Route 11intersection and the Route 11A intersection  Coordination of utility relocation and/or preservation of existing utilities with utility owners  Development of a Work Zone Traffic Control Plan  Any additional Environmental and Construction Related Permits by Design-Builder 10

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D ) Right-of-Way  The Department owns all Right-of-Way for the existing structures.  No additional Right-of-Way acquisitions or temporary easements are anticipated to be required for this project.  Any Right-of-Way fencing damaged or removed by the Design-Builder during construction shall be replaced with new Right-of-Way fencing meeting current Department standards. 11

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D ) Utility Coordination – Existing Utilities In accordance with Part 4 – Utility Requirements, Design-Builder is responsible for:  Verifying utility facility locations  Identifying & resolving any conflicts not yet documented  Coordinating with utility owners for utility relocations  Providing stakeout and final layout of utility relocations  Protecting existing utilities  Cost of repairing damages to utilities caused by Design- Builder  Informing the Department of all meetings and correspondence with utility owners 12

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Utility Coordination – Existing Utilities  Known utilities located in the Project area:  National Grid 6-Inch gas line 18’+/- south of Route 80 centerline Primary aerial lines on the north side of Route 80 that cross over Interstate 81  Verizon of NY Duct bank 28’+/- north of Route 80 centerline  Time Warner Aerial lines on the north side of Route 80 attached to the National Grid poles - These cross under Interstate 81 and are attached to the underside of the Interstate bridges. 13

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Utility Coordination – Existing Utilities  Time Warner Cable shall be responsible for any necessary relocation of its aerial facilities within the project limit. The Design-Builder shall be responsible for negotiating a three-party agreement between the utility, the Department and the Design-Builder.  Impact on other utilities is dependent on the approach taken by the Design-Builder.  A meeting will be scheduled between the utilities and the short listed firms. The Department will invite the short listed firms and the utilities within the project limits to this meeting within the next two weeks. 14

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Contract Information  Project Completion Date shall be the earlier of:  October 31, 2016 or  The number of days past NTP proposed by the successful Proposer on Form SCD (ITP Appendix E)  Special Provision 6 -  Liquidated Damages will be imposed for not meeting the Project completion date and for days in excess of the number of calendar days indicated to complete the Milestones shown on Form SCD.  Up to 3 Early Completion Bonuses will be awarded: For the number of calendar days that all traffic in permanently transferred onto each new structure earlier than the respective Interim Completion Milestone Dates (with no further lane closures) and/or For the number of calendar days that Project Completion is achieved earlier than the Project Completion Date 15

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Contract Information (Continued)  Lump Sum Design-Build Contract  Best Value Selection Process (50% Price, 50% Quality)  Payment Schedule provided in the RFP  Stipend to Unsuccessful Proposers - 50% of Qualified Costs up to $45K* max. (Must satisfy criteria in ITP General Instructions)  Escrow Submission of Bid Documents for Successful Proposer  Buy America Clause  Iran Divestment Act Clause  DBE Participation Goal - 12% 16

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Anticipated Procurement Schedule ActivityDue Date Draft RFP Info MeetingSeptember 3, 2014 Final RFP to Shortlisted FirmsSeptember 19, 2014 Final Date for Requests for Changes to Proposer’s Organization and PersonnelNovember 24, 2014 Final Date for Receipt of Proposer QuestionsNovember 26, 2014 Issue Date for Final Addendum and/or Answers to Proposer QuestionsDecember 3, 2014 Proposals DueDecember 22, 2014 Post Proposal Meetings (if required)TBD Selection of Best ValueMid-January 2015 Execution of Contract AwardLate February 2015 Notice to ProceedMarch 12,

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Request for Proposals (RFP) Documents  RFP Documents:  Instructions to Proposers General Instructions Appendix A – Project Information Appendix B – Administrative Submittal Requirements Appendix C – Technical Submittal Requirements Appendix D – Price Proposal Submittal Requirements Appendix E – Forms Appendix F – Conflict of Interest Policy Appendix G – Abbreviations and Definitions 18

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Request for Proposals (RFP) Documents (Continued)  Part 1:D-B Agreement  Part 2: General Provisions, Section DB 100 and Appendices  Part 3: Project Requirements (Scope of Work)  Part 4: Utility Requirements  Part 5: Special Provisions  Part 6: RFP Plans  Part 7: Engineering Data  Part 8: Special Specifications (Including New DB Specifications)  Part 9: Design-Builder’s Proposal  Part 10: RFP Addenda (If Any)  Reference Documents on Department’s web site (Not part of the Contract Documents) 19

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Quality Control (QC)  QC is Design-Builder’s Responsibility.  Design-Builder shall appoint a QC Manager responsible for the QC Plans for both Design and Construction.  Design QC shall be performed by the Designer in accordance with the QC Plan.  Construction Inspection shall be performed by an Independent Engineering Firm hired by the Design-Builder.  Materials Testing shall be performed by an Independent Materials Testing Firm or Laboratory hired by the Design-Builder.  The Materials Testing Firm shall report to the Construction Inspection Firm.  Offsite Plant Quality Control shall be performed by the Department. 20

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Quality Assurance (QA)  Design and Construction QA is the Department’s Responsibility.  The Department may perform QA on any of the Design- Builder’s Design and Construction activities.  The Department will utilize an Independent Consultant to perform QA of the Design-Builder’s Designs.  Construction QA will be performed by Department staff.  Offsite Plant Quality Assurance will be performed by the Department. 21

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) RFP Evaluation and Selection Pass/Fail Evaluation Factors  Legal – Financial – Administrative – DBE Compliance - Price Proposal (Bond/Conformance) Quality Evaluation Factors (50%)  Key Personnel (30 points)  Management Approach (25 points) Overall Design-Build Team Organization (7 points) Design Management Plan (5 points) Construction Management Plan (6 points) Quality Control Plan (7 points)  Technical Solutions (35 points) Design Approach (10 points) Construction Approach (10 points) Initial Baseline Schedule (15 points)  Project Support (5 points)  Proposal Format(5 points) Price (50%) Design-Builder must obtain a minimum score of 60 points on Quality Evaluation factors 22

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Additional Information – Submission Guidelines  All proposals must be self-contained. Proposals should not have links to external web sites. Proposals should contain all information needed for evaluation.  Do not assume the Department “knows” your firm and its experience/qualifications. 23

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Additional Information – Submission Guidelines  Submit ALL Forms required.  Do not alter any Form unless indicated on the Form.  Do not add any appendices or attachments to the Forms.  Do not include photographs or illustrations unless specifically indicated.  Do not submit: Form SA (Stipend Agreement) Form BDEA (Bid Document Escrow Agreement) PAB (Payment Bond (Labor and Material Bond)) PEB (Performance Bond (Faithful Performance Bond)) 24

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Additional Information  Responses to Proposer Questions will be posted on the Department’s Project Web Site.  Reference Documents are Posted on the Department’s Project Web Site:  Reference Documents include:  Design Report (When Available)  Bridge Inspection Reports  Record Plans  Asbestos Survey Reports  Soil Boring Logs  Archaeological Monitoring and Data Recovery Plan (Pending) 25

Catherine Traina Attn: Interstate 81 Bridges over Route 80 in R3 Design-Build Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Rules of Contact 26

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN ; D900023) Questions and Answers Questions ? 27