A.Blas AB/RF/FB APC meeting 20/4/2007 1 Status of the PS TFB Upgrade launched in July 2005 L. Arnaudon, A. Blas, F. Caspers, D. Glenat, R. Louwerse, V.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
RF Systems Commissioning O. Brunner AB/RF on behalf of the RF group (LTC – March ’08) Many thanks to L. Arnaudon, Ph. Baudrenghien, W. Hofle, D. Valuch,
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
RITEC MEDARS MULTIPLE EMAT DRIVER AND RECEIVER SYSTEM Your Logo Here Drive Phased Arrays of EMATs at high powers.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Ongoing rf studies in the PSB A. Blas CERN-GSI meeting 22/09/ Transverse blow-up 2.Localization of narrow band transverse impedances 3.Cavity.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Developing fast clock source with deterministic jitter Final review – Part A Yulia Okunev Supervisor -Yossi Hipsh HS-DSL Laboratory, Dept. of Electrical.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
Anders Sunesson RF Group ESS Accelerator Division
Contents Overview of 150 MeV FFAG Accelerator
PSB RF bypasses + PSB TFB electronics A. Blas PSB-LIU meeting04 Jun Executive summary: Components for the PSB rf-bypasses will be installed (Joao.
RF issues with (beyond) ultimate LHC beams in the PS in the Lin4 era 0.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
Requirements for the PS/PSB TFB board 1 Alfred Blas Working group meeting - 07 December Sampling frequency 2.Required Delayed Clocks.
LEIR Transverse Dampers Alfred Blas LIU-ION LEIR Internal Review Associated colleagues: Michel CHANEL Alan FINDLAY Wolfgang HOFLE Reinier.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
 NICA is being constructed  For heavy ions we need very highluminosity level – 10 cm s  For keeping up such level we inevitably need cooling  Stochastic.
4 Channel DAC (Petri): 3 boards available for testing (version 1)-> now Transition board-> 22/12/2010 End of Hardware tests-> 28/01/2011 Attached DDC firmware.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
LFB, LLRF, TFB update Alessandro Drago XIII SuperB General Meeting Isola d’Elba, 5/30-6/
Areal RF Station A. Vardanyan
RF acceleration and transverse damper systems
Phase Feed-Forward Piotr Skowroński (CERN)
Jorge Sánchez-Quesada BE-RF-FB
Status of the PS TFB Hardware Overview Machine results To be done
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
10 MHz amplifier status G. Favia
The ELENA BPM System. Status and Plans.
Transverse Feedback System (LHC Damper)
RF and Sequences Andy Butterworth BE/RF
PS 1TFB preliminary specifications
The LHC25ns cycle in the PS Triple splitting after 2nd injection
PSB magnetic cycle 160 MeV to 2 GeV
AB-RF-FB section meeting
ELENA / AD Pick-ups and Schottky
Impedance of the 2x50 to 100 ohm transformers.
Presentation transcript:

A.Blas AB/RF/FB APC meeting 20/4/ Status of the PS TFB Upgrade launched in July 2005 L. Arnaudon, A. Blas, F. Caspers, D. Glenat, R. Louwerse, V. Rossi 1.Background 2.System block-diagram 3.Hardware overview 4.Planning

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Background 05/05Presentation to the APC to ask for some founding (new amplifiers, Strip line kicker upgrade kicker impedance matching transformers, PLC control system, LHC type electronic core …) System specified for < +/- 2mm injection errors and compatibility with LHC: End 06System expected to be ready

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Blue boxes represent new hardware since 6/05 Block diagram

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Pick-up amplifiers (J. Belleman) Were ready in October 2003 BW: 20 kHz – 40 MHz 80 dB dynamic range (compatible with ions) Remotely programmable gain Located in the ring below concrete slab

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Electronic core Ongoing design using the hardware foreseen for the LHC 1TFB Ready in late 2007 ????.

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Electronic core

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Clock generation (J. Sladen) 1 GHz DDS Available since mid-2004 Receives the frequency program from the PS central building and outputs the 160*Frev (< 80 MHz).

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Pre-Amplifier  Fast Clipping of the output signal  0 and 180 o outputs  Programmable gain  TFM setup  Local / Remote control  Interface with the PLC control  Compatible with analogue systems

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Power Amplifier [2.5 kHz – 23 MHz], 3kW – 5ms, 750W - CW 4 amplifiers required + 2 spares 2 amplifiers ready used in 2006 MDs 3 amplifiers under final tests 1 amplifier under construction waiting for missing material

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Power Amplifier AmplitudePhase Power Response (inactive trace = version used in MD)

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Impedance matching transformers Input impedance: 50 Ω Output impedance: 100 Ω Each coax: 50 Ω Voltage gain = 2 [ 2kHz – 40 MHz] up to 3 kW

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Kicker

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Kicker

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Power loads 50 Ω / 30 dB Attenuator [ DC – 1GHz] 1 kW CW 100Ω to 50Ω resistive transition [ DC – 190 MHz] 1.6 kW CW

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Power Control

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Water cooling Electric valves coupled to leak detectors

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB LHC 26 GeV + MTE MD setup

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB 26 GeV MD setup 2100 ns Notch delay ns 1-turn- delay

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB MTE blow-up at 14 GeV, Oct.2006, A. Franchi, S. Gilardoni, M. Giovannozzi, D. Quatraro See APC slides 9 March GeV, LHC beam transverse damping, Oct. - Nov R. Steerenberg, G. Arduini, E. Benedetto, H.Damereau, A. Grudiev, W. Höfle, E. Métral,M. Morvillo, C. Rossi, G. Rumolo……. (APC slides 22 September and 15 December 2006) - Excitation–Damping test. Observation of the first betatron line amplitude: 5.7 ms damping time instead of 21 ms natural decay (100 to 5 %),with C10 cavities only active. No significant results with C20, C40 or C80 Problem found afterwards: Power resistors (200W CW, 3kW/2ms peak) dead !! MD’s

A.Blas AB/RF/FB APC meeting 20/4/ PS TFB Summary The transverse feedback system is waiting for its VME electronic core to be completed. For this unit, the time table is under discussion The system is ready for another set of measurements on the 26 GeV flat-top. The system is ppm => parallel MDs