For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.

Slides:



Advertisements
Similar presentations
IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
Advertisements

Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
From Research Prototype to Production
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Compressor status AWAKE Technical Board meeting 19 August 2015.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Chiller control system Lukasz Zwalinski – PH/DT.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
60kW Thermosiphon control system
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
Michele Battistin Elena Perez Rodriguez 10 November 2010
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Demineralised water cooling system
IBBelle: Status & Plans
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
Bidder’s conference – 21st May 2013
ATLAS Thermosiphon Electrical Distribution and Run Modes
Status of the cryogenic system for B180
Low temperature chiller Market Survey
Presentation transcript:

For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez

Index Introduction Purchase procedure – Schedule – Documents Technical specification – Technical specification – Configurations and options Purchase – Scope of the purchase – MS results (List of selected firms) – Adjudication (DQE and Tender Form) Conclusions 19/11/2010Thermosiphon project2

Introduction 19/11/2010Thermosiphon project3 The chiller is a CRITICAL part of the Thermosiphon installation. – In terms of cost – In terms of reliability and maintenance INDUSTRIAL STANDARD SOLUTION

Purchase procedure Schedule 19/11/2010Thermosiphon project4 Market Survey Evaluation of the firms Invitation to Tender Internal thermosiphon review Specification committee Selection of the firm Technical evaluation of the answers Adjudication formula Installation and commissioning of the chiller April 2010 November 2010 January st semester 2012 February - March 2011

Purchase procedure Documents 19/11/2010Thermosiphon project5 EDMS

Technical specification Define precisely the required equipment technically Objective Scope of the tender General conditions for tendering and contracting Technical requirements Design Assembly Commissioning Delivery and installation Maintenance Quality assurance Safety Main points 19/11/2010Thermosiphon project6

Scope of the tender 19/11/2010Thermosiphon project7 Chilled water Chiller and brine : design, construction, purchase of components, installation and commissioning Thermosiphon condenser and piping Thermosiphon condenser and piping Spares (1 year & h) Functional analysis, cabling and electrical cabinets Documents PLC and software (UNICOS)

General conditions for tendering Pre-tender discussions Bidders conference Questions and answers sent to all bidders Alternative proposals Sent with the compliant offer 19/11/2010Thermosiphon project8 Technical and design P&ID, P-h diagram Dimensions and weights, general assembly drawings. Electrical power, compress air and water supply needed. MSDS for refrigerants and TDS for compressors, pumps and heat exchangers. Technical questionnaire. Reliability and risk analysis. Organization Work site organisation, preliminary schedule, project team. Working methods, protection means and test methods for commissioning. Purchase Price List Tender form. Documents to be sent with the tender

General conditions for the contract The contractor has responsibility for Design, components and performance. No deviations from this technical specification. Allow CERN factory access if requested. Manpower and tooling, including training for the manpower, management and supervision. Contract follow-up (Contract engineer, progress report). The design approval and production be done by CERN. Delivery schedule Functional analysis and detailed design by end of April Delivery of the skids at CERN by end of September Installation finished by end of October Commissioning completed by end of December /11/2010Thermosiphon project9

Technical requirements Chiller units – Two circuits in cascade (high and low temperature) – Refrigerant to be chosen by contractor 19/11/2010Thermosiphon project10 Brine circuit – Mono-phase liquid C 6 F 14

Chiller configuration A 19/11/2010Thermosiphon project11 C3F8 condenser 180 kW -70 °C liquid tank USA15 cavern Surface C6F14 brine circuit Primary water 25°C First 50% power chiller Second 50% power Chiller First cycle for Emergency diesel powered Third 50% power Chiller First cycle for Emergency Diesel powered Air cooled ATLAS ID Detector UX15 cavern Back-up 50 kW -20 °C Brine circuit Redundant pumps

P&I for the configuration A 19/11/2010Thermosiphon project12

19/11/2010Thermosiphon project13 Chiller configuration B liquid tank USA15 cavern Surface C6F14 brine circuit Primary water 25°C Main 100% Redundant chiller First water cooled back-up chiller Diesel powered Running only in case of main chiller failure Second air cooled back-up chiller Diesel powered Running only in case of first back-up chiller failure and water maintenance periods ATLAS ID Detector UX15 cavern C3F8 condenser 180 kW -70 °C Back-up 50 kW -20 °C Brine circuit Redundant pumps

P&I for the configuration B 19/11/2010Thermosiphon project14

Design Operation and reliability Power regulation – 20 ÷ 100% Temperature regulation – 20°C ÷ -70°C – Precision ± 1 K Compressor – MTBF > 40,000 h – MTTR < 10 h Chiller system – MTBF > 20,000 h Other Seismic requirements Sound level Integration 19/11/2010Thermosiphon project15

Assembly and commissioning Assembly Skids and electrical/control cabinets will be pre-assembled 19/11/2010Thermosiphon project16 CommissioningIn the contractor premises Welding inspection X-rays (10%) Pressure and leak tests Electrical mapping At CERN Performance tests

MS results 19/11/2010Thermosiphon project17

Adjudication 19/11/2010Thermosiphon project18 The adjudication formula must be defined BEFORE the invitation to tender is sent. It shall be an OBJECTIVE way of comparing the bidders and judging the offers. Even if there are different options in the tender. A penalization can be applied only for adjudication to some of the options. Purchase proposed different ways of doing the adjudication (next slide)

Adjudication 19/11/2010Thermosiphon project19 Adjudication on one option The adjudication is done comparing the price of one of the options. Risk: the company has no incentive whatsoever to put a low price in the other options. Adjudication on the cheapest option for each supplier The adjudication is done comparing the cheapest option for each supplier. Risk: the technical option that will be purchased is not decided by us but by the cheapest of all the offers. Adjudication on the global price The adjudication is done on the global price for all the options Risk: the chosen company could not be the cheapest for the technical option required.

Adjudication Practical example CompanyConfiguration A Configuration B (penalization 10%) Price for Adjudication I (price)100 I (adjudication) II (price)11080 II (adjudication) III (price)90100 III (adjudication) /11/2010Thermosiphon project20 Adjudication price Configuration A + 1.1*Configuration B + Spare comps 2

Conclusions The chiller is the CRITICAL component of the installation. The purchase process is taking place. – A detailed analysis of the firms has been done – The documents can be consulted in EDMS – Contact persons: Elena Perez Rodriguez and Bjorn Jenssen 19/11/2010Thermosiphon project21

Thank you for your attention 19/11/2010Thermosiphon project22 Any questions ?