Victaulic Solutions for “YM Mercury” Chemical & oil carrier - IMO No. 9452775 Owner: Chemfleet – Class: BV Built: 2010 Marmara Tersanesi, Turkey.

Slides:



Advertisements
Similar presentations
3/5/14. Work is nearly complete. Containment to be removed in the coming weeks. Hourly checks on the space temperature have ensured proper environment.
Advertisements

East Carolina University Compressed Gas Safety Training Program
LESSON TWO BEFORE YOU GET UNDERWAY. Key Topics Vessel’s capacity Vessel’s capacity Float plans Float plans Fueling a vessel Fueling a vessel Trailering.
Multi-piece Installation Instructions SAFETY WRAP.
Fire Sprinkler Earthquake Protection – Sway Bracing
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.2 Types of Vessels Susan Harwood Grant Number SH F-23.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Safety in the Chemical Laboratory Chemistry 550
ACCIDENTS DON’T HAVE TO HAPPEN Three elements of a successful safety process: Hazard analysis Pro-active planning Employee participation.
Health and Safety Manual Section C3 Cryogens. Cryogens  Fluids which at ambient temperature cannot be liquefied solely by pressure  Include liquid oxygen,
Ship Building Process Su-jin Kim Manufacturing Process
Victaulic Solutions for “China Shipping” 4 out of 17 Container Sister Ships Owner: China Shipping – Class: CCS Built: Dalian Shipyard, China.
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
Crack management Clemens van der Nat Bluewater Energy Services BV.
Agricultural Careers Electrician By: Dr. Frank Flanders and Anna Burgess Georgia Agricultural Education Curriculum Office Georgia Department of Education.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
1 HVACR316 - Piping Safety Solder and Braze Joints Safety Solder and Braze Joints.
Introduction to Current Electricity and Circuits.
To Share & To Absorb The Lessons Vessel Collision Incident Vessel Collision Incident Lecturer – Capt Cao jihui Aoxing Ship Management (Shanghai) Ltd.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
BONAFIDE MARITIME TRADERS. SALES Life Saving Appliances Fire Safety Appliance Communication & Navigational Equipments Deck/Engine/Saloon/Electrical Provisions.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Fire Safety Month Fire Safety Tips for October Department of Risk Management James Madison University.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
TRENTON Casing Filler Presentation
Kngreddykngreddy Marine Engineering Technology & Solutions Pvt. Ltd.
CRIMPING TOOLS. CONTENTS INTRODUCTION EXAMPLES CABLE TIE TOOLS RJ45 CRIMP TOOLS HAND CRIMP TOOLS.
Connecting to industry. Hose Coupling Safety It is important to fully inspect the overall hose assembly both prior to installation, and also after the.
MicroMet Cutting Edge Technology Defence Systems Division.
1 HVACR316 - Piping Safety Solder and Braze Joints Safety Solder and Braze Joints.
Maintenance Safety. Maintenance Problems n Operative usually works in dangerous areas from which others are usually excluded by various safety barriers.
Port Exercise Questions to Think About 1. Make a list of all materials you observe. Is anything hazardous? 2. Estimate how much of total.
Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
Exquisite Heat For Steam Boilers. Time based system  Thermostat Demand Analysis over time will determine the length of burner fire time of the boiler.
C - Series Installation Installation of C-Series signs is quick, easy and can be accomplished by anyone with just a little mechanical aptitude. Before.
Victaulic Solutions for “A2 Yacht” Retrofit by: Pendennis / Falmouth.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Static Electricity Safety Talk 1 Safety Talk Objectives
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
Handyman Services for Maintenance and Repair. At Sympcorp, we offer the best professional handyman services available on the Gold Coast, Queensland, to.
Grounding & Bonding Hazardous Materials Certification Study Guide 2 Definition of Terms (continued) Static Electricity - Electricity present on a surface.
HSE Health, safety and environment. Issues concerning HSE Physical working environment –Ergonomics –Noise –Heat, fire –Work in high places, risk of falling.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Air condition installation
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 7 PowerPoint presentation Supporting information.
Select only one answer– choose carefully.
Part 4 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Installation of the T600 at Fermilab
1.3-GHz Cavity Vacuum Furnace at IB4
Part 2 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Tracking Cargo from Foreign to U.S. Ports
ALPHEUS FLUID TRANSFER SOLUTIONS DOCK HOSE 2017
Are You having trouble with Brother Printer here is the quick solution for all the Errors in Brother Printer let us know call to connect.
One Will Die: The John Martin Story Applying Action Based Safety
East Carolina University Compressed Gas Safety Training Program
Cutting an In-Line Dead-end Single Phase
Firefighting equipment
Installation Binder / IRR – an example
Electricity Module 13.
Start Up Procedures and Recommendations for Factory Authorized Equipment Start Up.
Safety Alert Screwed Fittings 04/95 Background
A1 to A6 Conversion Tangent to Double Dead End
A1 Pole Changeout Energized
Cutting an In-Line Dead-end Single Phase
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Presentation transcript:

Victaulic Solutions for “YM Mercury” Chemical & oil carrier - IMO No Owner: Chemfleet – Class: BV Built: 2010 Marmara Tersanesi, Turkey

Repair of a leak on a pressfit connection System: Oil Piping (1 ½”) on a Nitrogen Generator Requirements: –Oil/Chemical tanker -> no hot works allowed –Quick Repair: Tanker only 24 hours in the port –Nitrogen System out of order -> as short as possible because needed for loading and unloading –Lack of space due to existing piping and electrical wires Products used: Victaulic Couplings Style 77 galva - grade O

Repair of a leak on a pressfit connection

Victaulic Piping Solutions: 1. Safety: no hot works –Existing pipe on board the vessel was cut and rollgrooved by hand. No (fire) hazard. –New piping was cut to length and grooved along the quay –Mechanical pipe couplings style 77 were used to connect the piping at location.

Existing pipe on board the vessel was cut and rollgrooved by hand. No (fire) hazard.

New piping was cut to length and grooved along the quay

Mechanical pipe couplings style 77 were used to connect the piping at location. No risk for the existing equipment (electrical wires etc.)

Victaulic Piping Solutions: 2. Quick Repair -The Victaulic team arrived August 23rd at 8.45 am at the dock, boarded the vessel and met the crew at 9.15 am, inspected the work area and started the repair around 10am. -It took 1 hour and 15 minutes to complete the job. -A pressure test was made together with the crew. All systems where checked. The installation was working well and piping giving full satisfaction.

Victaulic Piping Solutions: 3. Little space needed -Clearance of 180mm was sufficient to let the manual roll groover rotate around the existing pipe.

Final Result

Before After