SAGE USER ODI MAY 15 TH 2013 Defacto Solutions Limited sl-ect Limited.

Slides:



Advertisements
Similar presentations
We, at Vispara Technosoft specialize in delivering high quality, flexible, cost effective, reliable, result-oriented applications which can be capitalized.
Advertisements

1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Product Specialist Sage 1000 & CRM Sage UK
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Order Based Production Management
Intracompany Stock Transfer Scenario Overview
V2 1 E1 – Indirect Purchases Session 2 (V4) HAREFIELD.
REP: Reports and Enquiries Pack for Sage Line 500 & 1000 User Guide Version Supply – Demand & MRP PFS WO Trial Kit – Single WO WO Trial Kit Shortages.
Lab 7 MERP 4/14/2010 BC Kwon Lab 7 You are appointed as a CEO of a manufacturing company for a year Your mission is to generate profit.
Authorised Software Solution Provider. Take Sage Pastel beyond accounting with Job-SYS, a fully integrated, REAL TIME, job costing module for Pastel Xpress.
Channel Partner Conference 2013 Yarra Valley ABM Annual Channel Partner Conference 2013 WELCOME.
Inventory, job costing, manufacturing service and distribution Ostendo® adds advanced Add-on solution for MYOB, Quickbooks and Sage OSTENDO.
GARMENT INDUSTRY – Keys to Improve Supply Chain Efficiency Simon Lum Chief Operating Officer MSC Limited Date : 30th May, 2005.
SAGE USER NETWORK Defacto Solutions Limited ECOM Software Limited Sl-ect.
SQL Reporting Services SSRS Presentation for Sage User Network Sept 11 th 2008.
The story of Preactor at Universal Products Tim Buck Steve Littlewood Contact: SUN Meeting Dec 9 th.
Defacto Solutions Defacto Solutions – 2010 Sage User Network Update Discussion.
Priority Mobile Solutions – Stepping away from the keyboard... eMerge offers a range of mobile solutions to meet the different connectivity requirements.
Improving Your Business Processes Process Improvement = Profit and Growth Management Software Solutions We help businesses manage for success Cleveland.
The Production Process
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 6 Production and Operation Information System Ir. Ekananta.
The Production Process
High Lights of SAP Business One for Manufacturing.
ECOM Software Limited INTRODUCING THE MAGNIFICENT 7.
Sage User Network February Rixonway Kitchens Company was founded in 1978 Employs 500 staff £35 million turnover Private equity backed due to MBO.
Production Scheduling: What Tool is Right for You?
Production Logistics and ERP
November 11 th 2013 Preactor and Sage ERP integrated as never before. Defacto Solutions Limited sl-ect Limited.
SALES ORDER MANAGEMENT SYSTEM. According to the current global status, companies can't waste time sourcing suppliers or waiting for information on the.
Sage User Network Sage Auditing Presentation September 17 th
Plex Training. 2 Course Objectives Learn how to Log on and Change Passwords in Plex Learn the Common Functions on the Control Panel Learn how to Log into.
Pinnacle Seven Technologies - Gateway to Solutions Pinnacle Seven Technologies - Gateway to Solutions.
By AutoSimply Co. Ltd.. Manufacturing Suite for Manufacturers –Manufacturing Order (M/F) –Production Planning (P/P) –Manufacturing Lot (M/L) add-on –Shop.
Session 12 System Transactions
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
QuikTrac 5.5, a validated Motorola Software Solution, allows you to take your Host ERP screens and extend them out to fixed or mobile devices including.
Barcodes and MDS Easy ways to speed up and increase accuracy using barcodes in MDS Monday June 14, 2010.
The Advanced Manufacturing System Advanced Dealer Training Version 3.0.
Production Process Contents: Maintaining bills of material (BOM) Production process.
Microsoft Management Seminar Series SMS 2003 Change Management.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Sage User Network The Sage February 22nd
Functional Overview Getting started with Sage ERP X3 Production (Manufacturing) module.
SYSPRO ERP for all Manufacturing Types and Processes
How PromoServe can save you at least 25% of your admin costs Andy Barton
CONTRACT CONTROL. IPM Global – Why IPM Exists We believe Project Management Software should be easy to use. We believe Software should be flexible, and.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Manufacturing Management Module For Tally ERP.9 Introduced By Globo Soft Tech Solutions.
Benefits Get complete real-time visibility of demand, supply, costs and trends Web access allows users in different locations to log in Eliminate manual.
AXUG Partner Showcase – Introducing Preactor
A Brief Overview Of Contract Controller
Wholesale Distributors Campaign Briefing
Facility Inventory Old Facilities Modern Facilities Classroom Size
Dynamics GP Manufacturing
Intracompany Stock Transfer Scenario Overview
Intracompany Stock Transfer Scenario Overview
The Production Process
Innovia Consulting Customer Conference 2018
Reserved for Intro Picture
Material Requirements Planning (MRP)
MS Dynamics NAV – nothing simpler
Intracompany Stock Transfer Scenario Overview
Tour - session 9 Work Order Release and Production Activity Control
2019 Innovia Customer Conference
Set Up For Success : Reviewing Manufacturing Best Practices
Presentation transcript:

SAGE USER ODI MAY 15 TH 2013 Defacto Solutions Limited sl-ect Limited

 Final Session - Defacto Solutions with in association with Sl-ect  Preactor and Sage ERP 1000 integrated as never before

YOUR PRESENTERS TODAY  Nigel Tyrrell  Steve Littlewood

CLIENT STORY – PART 1  Our customer was implementing Preactor in a manufacturing company in Oxfordshire  Many Works Order operations are just a person at a bench assembling items  Lots of run times of less than 1 hour  Therefore they needed real time SFDC to inform management of progress against the plan  And of course to track labour  DefCapture WIP Start / Stop for barcode scanner devices / screens  With an interface to Preactor

CLIENT STORY – PART 2  Complex multi level Bills Of Material (BoM)  Not running MRP  Considering “Works Orderless” to make things easier in the factory  But this went against their need to give fast and accurate answers to customer enquiries – they needed WO to do this  Planning 1 sales order could take 11 hours!  Which is why they went for Preactor

BUSINESS SCENARIO’S  Quote Raised by Customer Services – When can we deliver?  Sales Order Received – When can we deliver?  Single or Multi Line  Single Product Ad-hoc Enquiry – Sales Director out to lunch with Key Client  Single Product Ad-hoc Enquiry – If we order today when can you deliver?  Factory managers want to know what’s happening on the shop floor – are we sticking to the plan

IN THE DEMO  We’ll show fast creation of works orders to aid planning  We’ll show operators signing on to their shift and booking works orders  Collecting time and quantity

CUSTOMER ENQUIRY PROCESS - TRADITIONAL Traditionally Preactor / ERP integrations had a process flow like this:  Customer Requests 500 of X by July 30 th  Or multi-line orders / quotations for multiple products or multiple dates added to Sage  Create WO(s) in Sage, manually or via MRP (could be multi-level complex BoMs!)  Import WO to Preactor  Schedule them  Find the end dates  Inform customer services

? How long did that take? So we invented the “PRO” system “PRoduction Orders” Where we START the process in Preactor…….

CUSTOMER ENQUIRY PROCESS – PRO SYSTEM  Customer Requests 500 of X by July 30 th etc  Create PRO in Preactor, takes minutes (or seconds!) to look at multi-level complex BoMs  PRO considers Lead Time of Buy items that are short (! Doing some MRP here!)  Schedule PRO (but note that they only exist in Preactor)  Publish the end dates via auto- to inform customer services  Manually create WO in Sage

CUSTOMER ENQUIRY PROCESS – PRO SYSTEM WITH DEFACTO UI ….this bit is the same as the previous slide…  Customer Requests 500 of X by July 30 th etc  Create PRO in Preactor, takes minutes to look at multi-level complex BoMs  Considers Lead Time of Buy items that are short (??MRP)  Schedule PRO  Publish the end dates via to inform customer services ….but now we create the WO as well…..  Automatically create the PRO as WO in Sage

PRODUCTS / BOM THAT ARE USED IN THE DEMO

Demonstration images: Operator uses DefCapture to sign on to their shift and to start their Works Order (or can resume the order they were on yesterday)

… which starts the clock ticking on the job they signed on to. In Preactor this is shown in the Active Jobs window:

… and the status shows as “Running”. The yellow bar shows that 160 out of 200 have been made so far

Here’s how we quickly found a promise date for a new sales order / quotation…. The SO Planning window finds a new quotation with 2 product lines….. The “Create PRO” button creates production orders for all levels of the BoM, and for both lines on the quote….

Preactor understands the BoM structure and works out when the PRO order can start, based on the supply from other WO or Purchase Orders or Initial Stock (IS-) In this case the bought item 07LNB99 will not arrive until June 4 th, meaning that production starts on the 9 th and ends on the 10 th

… shown in the main scheduler like this…

And the SO Planning window can be used to summarise the available dates for the quotation……… and to publish it via

generated…..

Lastly, because we asked for the PRO to be automatically created as WO in the ERP system we can see new Works Orders in Sage…. … these are lower level WO that were generated to cover shortages of dishes for the final assembly

SUMMARY  Two integration points between Defacto and Sl-ect to enhance the use of Preactor and Sage  DefCapture used to provide real time updates to the plan  Defacto Universal Interface (UI) module used to create WO in Sage  Preactor PRO system and the underlying scheduling tools quickly get an accurate answer to customer enquiries  Planning a sales order now takes minutes!