Waste measurement & improving performance trainer organisation location date.

Slides:



Advertisements
Similar presentations
Business Resource Efficiency and Waste (BREW) Programme Mark Atherton Head of Sustainable Development Northwest Regional Development Agency Nick Storer.
Advertisements

Introduction to Impact Assessment
Reducing construction waste through design Dave Marsh Construction Project Manager.
Site Waste Management Plans and the Code
EiS – Education iT Services Our passion in EiS is to make a real difference in education and ultimately childrens lives by providing innovative solutions.
Corporate Records Management (Practitioner) Information Governance Policy Team NHS Connecting for Health.
SUSTAINABLE DEVELOPMENT We have a plan ?. We knew we were in trouble and had to do something. Many parts of the organisation were doing good things (and.
Procurement Client-Based Approach Siân Mathews, Strategic Partnership Advisor, Skills Strategy 2011.
Food waste collections: Research and evidence Chris Mills Programme Area Manager- Food Waste Collections.
1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
Taking Action on Construction Waste South Ayrshire Council.
Waste prevention within FM Dr Leigh Mapledoram Products & Services, WRAP.
Sustainability Reporting Workshop: Carbon Management Plans and the Carbon Metric Click anywhere to move to the next slide Originally delivered in March.
The Team Janine Hamilton – Sustainable Procurement Project Manager Graduated from the University of Leeds in 2008 with a Sociology and Social Policy degree.
Diploma in Management & Leadership Briefing Session
Nigel Marsh, Global Head of Environment, Rolls-Royce plc
Return On Investment Integrated Monitoring and Evaluation Framework.
Strategic cost analysis 2
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
GREEN DRAGON ENVIRONMENTAL MANAGEMENT STANDARD Recognising Environmental Management & Tackling Climate Change Across Wales.
ISO Energy Management System Certification
Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.
Introduction to SMARTWaste Plan – benefits for Strategic Waste Planning Katherine Adams Centre for Resource Efficiency.
Supplier Engagement EAUC – EAF Programme. EAF Programme Background  Three year project  Reducing negative environmental and social impacts through purchasing.
Alan Hendry Envirowise Scotland Manager. TODAY’S OBJECTIVES  Introduce Envirowise  Introduce the Public Sector Supply Chain Project  Other examples.
WRAP and sustainable construction Mervyn Jones Head of Products and Materials WRAP 19 September 2012 SCI Network.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
SKA Rating – for SEDA Research Conference Promoting Good Practice Fit-outs for Offices David Somervell, Social Responsibility and Sustainability Futures.
DG Environment Green Public Procurement in UK Green public procurement (GPP) - Lead the change National Conference Barbara Morton 08 April 2010 Vilnius,
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Construction Commitments: Halving Waste to Landfill Workshops March 2009.
The CRC Energy Efficiency Scheme (CRC) Challenge Henry Garthwaite, Business Development Manager Carbon Trust Standard October 2009.
Waste Prevention - MSW & C&I Jamie Pitcairn and Simon Stockwell.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Integrating Safety Management Systems – Opportunities for Improvement
A Review of Waste Needs Assessment for New Waste Treatment Processes CIWM Cymru Wales & NW Centres Autumn Event 2010.
1 Perform! Benchmark™ - OVERVIEW & DATA CAPTURE INFORMATION Current State Benchmarking & Best Practices Analysis.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Leeds City Council’s Approach to Sustainable Procurement Tony.
Construction Commitments: Halving Waste to Landfill Workshops November - February 2009.
1 Perform! Benchmark™ - OVERVIEW Current State Benchmarking & Best Practices Analysis Tool for the Public Sector.
Sustainable Procurement What is Sustainable Procurement? Effective protection of the environment Prudent use of natural resources Social progress that.
Resource Efficient Construction Richard Buckingham Head of the Built Environment WRAP BASE London 11 th July, 2013.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Design and introduction of the Qualification Development Methodology David Tournay – Key Expert.
Process Quality in ONS Rachel Skentelbery, Rachael Viles & Sarah Green
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
An introduction to the Net Waste Tool An overview of its benefits and functions.
Embedding Carbon Management within Public Sector Organisations 17 th November 2015.
Sustainability reporting John Maddocks - CIPFA. cipfa.org.uk Sustainability accounting and reporting can … … ‘enable the systematic identification and.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
FRA34 Framework training and update. Agenda introductions Halving Waste to Landfill update design out waste tools – what's new? coffee break cost benefit.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
3 R’s of Sustainability SESSION 1: The What, Why and How of Sustainability PREVIEW ONLY.
Developing and Implementing Marketing Plans. Learning Outcomes To be able to discuss the meaning of a marketing plan (E) To be able to analyse the internal.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Commission of Inquiry into achieving best value in the procurement of construction. Andrew Smith Chair of NIEP Board National Improvement and Efficiency.
THE VALUE OF STRUCTURAL ENGINEERING TO SUSTAINABLE CONSTRUCTION
Selection of contractors & PAS91:
An Introduction to the Scottish Carbon Metric
Just Enterprise Business support and development services to enterprising third sector organisations across Scotland.
Our mission is to accelerate the move to a sustainable,
Resource Efficient Scotland
Supply Chain Challenge
Michelle Papayannakos
The CRC Energy Efficiency Scheme (CRC) Challenge
Presentation transcript:

Waste measurement & improving performance trainer organisation location date

Aims Demonstrate how to forecast and measure waste, with minimum cost and effort, using publicly available tools Equip you with the knowledge and means to train others in your organisation

Agenda Why forecast and measure waste? How to forecast and measure waste Supply chain interfaces Learning objectives Overview of waste forecasting Waste planning & data capture Tracking corporate performance

Why measure and forecast waste?

why take action? Finance Achieve real cost reductions Reputation Achieve clear market recognition Environment Reduce negative environmental impact Policy Contribute to strategic objectives

Why take action? Reduce environmental burdens  less waste to landfill  less site traffic  lower carbon footprint Maintain reputation  demonstrate Corporate Responsibility  demonstrate efficiency and sustainable procurement Cut costs  lower tender prices if requirements are set and waste reduction is planned at an early stage

Landfill tax escalator £8 landfill tax escalator extended to 2014 (active waste) non-active frozen at £2.50/t (2010/11) aggregate levy frozen at £2/t (2010/11) government considering further restrictions on landfilling biodegradable waste and recyclable materials potential future landfill bans 2013£72/tonne 2012£64/tonne 2011£56/tonne 2010£48/tonne 2009£40/tonne 2008£32/tonne 2007£24/tonne

SWMP Regulation (England) Legal requirement on all projects in excess of £300k (increased requirements for those in excess of £500k) It should include: headline information about the project; the name of an individual responsible for waste; a forecast of the quantity of waste that will be generated; a set of clear actions to reduce waste, and to increase the level of recycling; the end destination for each waste stream and the recovery rate that will be achieved.

Skanska Bristol schools PFI Cost of waste disposal: £42/t well segregated £238/t poorly segregated Cost of waste: £274k estimated value of materials wasted at one school “Reducing waste became part of the way we did construction”

Waste and the supply chain

Supply chain interfaces Pre-construction Outline design Detailed design Construction Post-construction Tendering & appointment Prevent waste Forecast waste Reduce waste Increase RC Waste reduction Waste recovery Measure performance Review performance Benchmarking Model wording Net Waste Tool Designing out waste tools/guidance SWMP Tracker Reporting Portal SWMP Template

Forecasting and measurement tools Outline design Focus Waste prevention Reusing materials Detailed design Focus Reduce wastage Increase recycled content Construction Focus Achieve target wastage Waste recovery Measure performance Completion Focus Consistent performance benchmarking Designing out Waste Tools and guides Net Waste Tool Site Waste Management Plan Template and Tracker Reporting Portal

What do you want to achieve today?

Overview of waste forecasting

Benefits of waste forecasting Estimating waste streams and allows you to identify: –Opportunities to reduce wastage and save money –Opportunities to segregate and reduce disposal costs –Opportunities to increase recovery

Net Waste Tool Users:Design team – Quantity Surveyor When:RIBA stage C to E (or equivalent) Inputs:Basic cost plan data Cost:A few hours effort, depending on project size Benefits: Identify opportunities to reduce cost of waste Identify opportunities to increase RC and re-use Provide waste forecast data for the SWMP Use results to demonstrate CSR

Example The principal contractor used the Net Waste Tool to: forecast waste arisings understand the cost of waste set actions to reduce waste arisings increase the segregation and recovery of waste

Material selection – Tya, your original title was Recycled content!

Inputs Project details (e.g. value) Project quantities (e.g. floor area) Programme Choose component specifications (e.g. 100m2 of 12mm plasterboard) Upload actual waste data post- construction

Input options OR enter quantity from cost plan Accept the Tool’s quantity estimates (e.g. based on floor area entered) The objective is to produce a ‘best fit’ analysis using the data you have available

Outputs Detailed spreadsheet of data for SWMP Headline results: - waste arisings - waste to landfill - cost of waste - recycled content - KPIs (improvement) Graphs showing results as you work through the analysis (baseline, good practice and targeted)

Net Waste Tool – hands on

Quick Quiz Does the NW Tool assess recycled content? What other outputs does the Tool provide? If you don’t have a cost plan, can you still use the Tool? What did the Net Waste Tool used to be called? Who should use the Tool and when?

Use your own project data or an example project Work on your own or in pairs

Access the tool at:

Waste planning & data capture

Waste planning – what, when and who? Pre-construction Outline design Detailed design Construction Post-construction Tendering & appointment Capture waste prevention actions Forecast waste and record actions Monitor performance and record actual wastage Performance review and benchmarking Client Contractor Design team or contractor QS Architect Contractor and client SWMP Template

What issues do you face?

SWMP Template - benefits goes beyond compliance, so can be used for projects across the UK; clear demonstration of compliance with the SWMP Regulations 2008; Applicable to all sizes of project and all types of construction; enable users to progress from Standard to Good and Best Practice and demonstrate this; data only has to be entered once and are then taken forward automatically to subsequent Steps; and Net Waste Tool waste forecast can be used in the SWMP Template.

Inputs and outputs

WRAP/Envirowise SWMP Template (v2.0) Users:Client & Principal Contractor When:As early in the project as possible Inputs: Waste forecasts Actual waste arisings Waste destinations Cost:A few hours, depending on project size Benefits: Meet the legal requirement (England only) Identify Good & Best Practice opportunities Assign responsibilities for waste management actions Identify areas for improvement & lessons learned

SWMP Template demonstration

Use your own project data or example data

Guidance freely available

How to access resources

Tracking corporate performance

Supply chain interfaces Pre-construction Outline design Detailed design Construction Post-construction Tendering & appointment Prevent waste Forecast waste Reduce waste Increase RC Waste reduction Waste recovery Measure performance Review performance Benchmarking Model wording Net Waste Tool Designing out waste tools/guidance SWMP Tracker Reporting Portal SWMP Template

SWMP Tracker Aggregate and analyse data from multiple SWMPs: 1.upload SWMPs 2.select which SWMPs to aggregate 3.download an Excel based report 4.Send data directly to the Halving Waste to Landfill Reporting Portal.

SWMP Tracker demonstration

Insert a slide covering the reporting portal – just a link to say where it is. Hopefully most people will attend the later session so no need to cover in any detail.

Q&A

User guidance E-learning module Quick start guide Brochure Dataset Data report Workbook