Well Construction Example 1 Screen in Target Confined Aquifer C Confined Aquifer B Proper Well Construction Requirements In addition to the Virginia Department.

Slides:



Advertisements
Similar presentations
Groundwater What is it and why is it important?
Advertisements

Overview of the EPRI Groundwater Assessment Program
Groundwater and Wells Two types of wells:
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Water Underground.
The Proper Location and Construction of a Residential Water Well.
Sediment – Causes & Prevention Improving Water Quality- Well Rehab & Downhole Camera Applications Michael L. Vaught, PG Hydrogeologist Certified Well.
Discharge Monitoring Reports (DMRs)
ESS 454 Hydrogeology Module 4 Flow to Wells Preliminaries, Radial Flow and Well Function Non-dimensional Variables, Theis “Type” curve, and Cooper-Jacob.
Drilling Methods Rotary rigs –Most-used method for deep production wells –Uses a fluid (mud, water or forced air) to carry drill cuttings to surface Hollow-stem.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
The Ground Water Characterization Program Helping Secure Virginia’s Ground Water Resources For The Future The DEQ Office of Ground Water Characterization.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
Welcome Domestic Well Owners Workshop Sponsored by The Nevada Water Resources Association Spring 2011.
IMPORWARE EGYPT - WP2 Activities. Egyptian Environmental Affairs Agency (EEAA) Established according to the Law 4/1994 (later amended by Law 9/1999) for.
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
Factors that Influence the Occurrence of Nitrate in the Upper Willamette Valley Basic Groundwater Hydrology Understanding Nitrate and its Distribution.
Groundwater Math Math for Water Technology MTH 082 Lecture 2 Well Drawdown, Well yield, Specific Capacity, Well Disinfection Course Reader Week 2 Chapter.
Basic Geologic and Hydrogeologic Investigations
Yield Determination Purpose Groundwater Classification Yield Methods Recent Issues.
Manitoba Floodway Authority Manitoba Floodway Authority FLOODWAY EXPANSION GROUNDWATER ACTION RESPONSE PLAN 1. OVERVIEW GROUNDWATER IS A TOP PRIORITYGROUNDWATER.
Well Systems. Well System Capacity Well system capacity needs to be large enough to supply daily water need in 10 to 12 hours. Some designers assume 5.
After the Sanitary Survey
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
Radial Flow at a well Removal of groundwater faster than it can flow back lowers the water table near the well. The GWT becomes a radially symmetrical.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
CHAPTER SEVEN Groundwater
Who Can Plug an Abandoned Well. Overview Introduce the common methods used to construct wells. Discuss the different types of wells Discuss what types.
Groundwater Workshop Jackson, MS August 2015 Presented By: Mr. Bill Oakley, RPG Consulting Hydrologist & Mr. G. Mark Teague, RPG Consulting Geologist.
Water Well Design August 6, 2015 AL/MS AWWA
Hydrogeologic Data Collection for Water-Resources Evaluation in Bedford County, Virginia Brad White, Virginia Department of Environmental Quality, Ground.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
- Water beneath the Earth’s surface in sediment and rock formations.
Multi-Layered Aquifer Systems Chapter Nine Analysis and Evaluation of Pumping Test Data Revised Second Edition.
Water Well Design August 6, 2015 AL/MS AWWA Ralph Hayes, P.E., BCEE Engineering Director MSDH, Bureau of Public Water Supply.
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Problem 1a The table on the right shows the results of a formation sample hypothetical sieve analysis. (Grain sizes listed in the table are conjecture,
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Preparing a Site Conceptual Model. Typical Site Management Problems: Site complexities  Complicated hydrogeology  Multiple contaminants of concern (COCs)
Use of Depth-Dependent Sampling to Determine Source Areas and Short- Circuit Pathways for Contaminants to Reach Public-Supply Wells, High Plains Aquifer,
Debra Harrington and Haizhi Chen FDEP Groundwater Protection March, 2005 PROTOTYPE FOR SPRING SYSTEM ASSESSMENTS.
How does groundwater flow ? February 26, TOC  Definitions  Groundwater flow overview Equipotentials and flowlines  Wells  Laplace  Boundary.
Review Session 2 Flow to Wells
ICORR Technologies, Inc.
Is a Virtual Well Completion Report in California’s Future? Bob Pierotti Chief, Resources Assessment Branch Southern District.
Hydrology & Climatology (including Geohydrology) Louisiana Department of Environmental Quality 2010 Envirothon Training.
State Water Resources Plan October 28, Active monitoring and reporting of water resources Active SWCB Planning Efforts – Watershed plans.
COMMON PROBLEMS WHEN REVIEWING WATER WELL PLUGGING RECORDS.
Objective: conceptual model definition and steady state simulation of groundwater flow.
Location and construction of water wells
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Home Water Supply Basic Facts a Homeowner Needs to Know
Groundwater P = Q + ET + G +  S. Floridan Aquifer Extent.
GEOTHERMAL WELLS What is Geothermal Heating and Cooling? Conventional heating and cooling systems use air to transfer heat into and out of buildings. Geothermal.
GROUND WATER Introduction Sources and Discharge of Ground Water
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Groundwater P = Q + ET + G + DS.
HOS1010C - Introduction to Horticulture
Abandoned Wells Do you have an old well lurking in your yard?
Ground-Level Monitoring Committee Meeting
Chapter 9 Water Resources
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
NGWA 2004 Microbial GWQ Interest Group
How Well is Your Well? UIC Class I Well Construction Standards
July 1, 2019 City of Sunrise Floridan Aquifer Test Program Searching for Sustainable Water Quality and Yield Imagine the result.
Water Underground.
Presentation transcript:

Well Construction Example 1 Screen in Target Confined Aquifer C Confined Aquifer B Proper Well Construction Requirements In addition to the Virginia Department of Health requirements. > Conduct Geophysical logging (Spontaneous Potential, Single Point Resistance, 16/64 Short and Long Normal, Natural Gamma) and complete geologist's logs during well drilling (required for all permitted wells) >Install gravel packs and grout for observation wells and production wells in a manner that prevents leakance between aquifers. Gravel pack should be terminated close to the top of well screens and should not extend above the top of the target aquifer as shown in Example 1. Bentonite plugs between screened intervals should be used. DEQ staff need to review the geophysical logs and driller’s logs to determine the gravel pack intervals prior to well construction (See contacts below.) >Ensure that Well Completion forms (GW2s) are completed by the driller and retained by owner and driller. > Document Pump intake settings and do not set the pump intake (1) below the top of the uppermost screened confined aquifer or (2) below the bottom of an unconfined aquifer. Evaluate the effect of the allowable pump intake level on needed production and pumping water levels in the well as part of the well performance evaluation. DEQ should be contacted to help evaluate the geophysical logs and determine the aquifer top and allowable pump intake limit. Two weeks notification of the drilling schedule is needed to schedule DEQ assistance. -Collect the GPS location for the well and include the Lat/Long and reference datum (i.e. NAD 27, WGS 84) on the Well Completion Form Who to Contact for Additional Information: Ground Water Groundwater Withdrawal Permitting: Characterization: Craig Nicol Scott Bruce (804) (804) Groundwater flow through well screen Grout Gravel Pack Note: This construction is recommended even if your facility or public system, etc. does not currently need a withdrawal permit since it can prevent future permitting problems. Confined Aquifer A Unconfined Aquifer Confining unit VDH DEQ

Confined Aquifer A DEQ Factsheet: Groundwater Well Installation in Groundwater Management Areas Well Construction to Avoid - Example 2 Improper Well Construction Unconfined Aquifer Confining unit Screen in 1st Target Aquifer Confined Aquifer B Confining unit Screen in 2 nd Target Aquifer Confined Aquifer C Flow through well screen -Extending the Gravel pack beyond the top of the screened interval and/or extending the gravel pack into other aquifers as shown in Example 2 -Including multiple aquifers in the well screen or extending the well screen through multiple aquifers or as shown in Example 2 and 2a Wells with this type of construction often do not meet regulatory requirements due to the unintended impact on overlying aquifers and the pump intake limit may be impacted limiting capacity. This means the well may have to be abandoned and a new well constructed. Even if the wells may be usable, this construction can cause the need for expensive and complex aquifer testing in order to obtain a permit, and for the pump intake limit to be shallow (above Aquifer A in Example 2) Other Common Well Construction Problems -No geophysical log : Geophysical logging data is necessary for permit issuance in almost every case. Collection of geophysical and geologist's logs must be performed during well drilling and cannot be collected once the well is completed. Drilling an additional bore hole and conducting geophysical logging may be necessary if geophysical data is not available for the location. -No well completion form : This information is necessary to issue a permit. If the depth of the well, the screened intervals, the grout depth, and the gravel pack extent are not documented, a camera survey may be necessary to determine the basic well construction. -No documentation of the Pump Intake depth It is illegal for a pump intake to be set (1) below the top of the uppermost confined aquifer in use or (2) below the bottom of an unconfined aquifer. If the pump depth is not documented, the pump may have to be pulled to determine the depth or to raise the pump. Raising the pump can reduce the well yield, sometimes significantly. Flow through gravel pack from overlying aquifers Grout Extended Gravel Pack Page 2 February 2014 Confining unit Flow through well screen 2a: Shows screening through multiple aquifers and through confining unit