GSET Technical Seminar Series Space Telescope Science Institute November 21, 20051 Earned Value Management: An Introduction and Short Tutorial Wayne Baggett.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

Presenter: Sohel Akhter, PMP, CCNA,ISMS
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M30 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Degree and Graduation Seminar Cost Management
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Project Evaluation and Control
Project Evaluation and Control
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Understanding Earned Value Analysis
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Project Cost Management
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
Brookhaven Science Associates U.S. Department of Energy Facility Managers Meeting DOE-OECM Certification of Earned Value Management Systems April 27-28,
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
PMP Study Guide Chapter 11: Controlling Work Results.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Project Cost Management
CHAPTER:7 Project Cost Management
Earned Value Management
Project evaluation and control
Earned Value Management
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
Earned Value Management: An Introduction and Short Tutorial
فرآيند كنترل پروژه.
Project Cost Management
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Management: An Introduction and Short Tutorial Wayne Baggett

GSET Technical Seminar Series Space Telescope Science Institute November 21, Outline  What is Earned Value?  Government Requirements  Small Project Usage  Why Use Earned Value?  Earned Value in a Nutshell  Conclusions

GSET Technical Seminar Series Space Telescope Science Institute November 21, What is Earned Value? How does Dilbert know this?

GSET Technical Seminar Series Space Telescope Science Institute November 21, What is Earned Value?  Project Management Technique Integrates technical performance requirements, resource planning, and cost accounting with schedule Provides insight into project status Provides “early warning signals” for problems Provides a disciplined means of managing the project

GSET Technical Seminar Series Space Telescope Science Institute November 21, Government Requirements  OMB Circular A-11, Exhibit 300 (2004) Requires EVMS for all major acquisitions Agencies must have ANSI-compliant EVMS in place by December 31, 2005 EVMS data must be used to identify problems and provide realistic final cost estimates as a part of decision packages  Federal Acquisition Regulations (2005) amended to require contractor-maintained EVMS

GSET Technical Seminar Series Space Telescope Science Institute November 21, Government Requirements  These requirements apply to large projects or programs; DOD requires Contract Value ≥ $50M: validated ANSI-compliant EVMS, structured reports and reviews, ongoing surveillance $50M > Contract Value ≥ $20M: ANSI-compliant EVMS (validation not required), tailored reports and reviews, ongoing surveillance Contract Value < $20M: EVMS optional, ongoing surveillance  Very rigid, heavily constrained system at this level

GSET Technical Seminar Series Space Telescope Science Institute November 21, Small Project Usage  Small projects provide “the best opportunities for earned-value employment” Consider its use for “… all in-house funded developmental projects where a firm commitment is made to management.” “Software projects can especially benefit from the employment of a simple earned-value approach.” (Fleming and Koppelman, “Earned Value Project Management: A Powerful Tool for Software Projects,” Crosstalk, July, 1998, p. 19.)

GSET Technical Seminar Series Space Telescope Science Institute November 21, Small Project Usage  The Personal Software Process (PSP SM ) and Team Software Process (TSP SM ) use EVM PSP has practitioners estimate task efforts and track their actual efforts  Tasks estimated are very small – about 10 hours each  Data are used to improve future estimates TSP expands the use of EVM to the project level Use of PSP and TSP helps projects meet their commitments (Tuma, D. and Webb, D., “Personal Earned Value: Why Projects Using the Team Software Process Consistently Meet Schedule Commitments,” Crosstalk, March 2005, p. 17.) PSP and TSP are registered service marks of Carnegie Mellon University

GSET Technical Seminar Series Space Telescope Science Institute November 21, Small Project Usage  Several projects at STScI have used EVM: Most used a tailored version of EVM JWST S&OC development  FOS, PPS, PRDS JWST FITS Writer development INS Master Schedule development DMS Automated Test System development

GSET Technical Seminar Series Space Telescope Science Institute November 21, Why Use Earned Value?  Obligates planning to the level of task management Less likely to overlook work  Provides objective measures of progress  Allows early detection of budget and schedule problems  Allows an objective projection of eventual project cost and schedule

GSET Technical Seminar Series Space Telescope Science Institute November 21, Key to Earned Value Determine the value for every task prior to starting work!

GSET Technical Seminar Series Space Telescope Science Institute November 21, Guidelines for Setting/Earning Value  Use a consistent unit of measurement that makes sense for the project Dollars – required for large gov’t projects Hours – useful on small projects; PSP SM Arbitrary number – not recommended, but still used  Consider task duration  Select Earned Value Methods that are as objective as possible

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Methods MethodUsageExamples Equivalent Units Value based on completed portion of a large number of completed activities S/W Implementation, H/W Production 0-100Value earned upon completing work that starts and ends within one status period Outlines, Document Preparation, Formal Reviews 50-50Part of value earned when work starts and remainder when it ends, usually when work straddles two reporting periods; percentages are determined by the manager Short Engineering Analyses, System Design, Build and Acceptance Tests Interim Milestones Value earned at the completion of objective milestones; usually for work that straddles several consecutive status periods Long-Term Analyses, System Design, Requirements Definition Apportioned Effort Value earned is prorated based on a portion earned for another unit of work QA, Configuration Management, Database Management Percent Complete Value earned based on subjective estimate; usually for work that has no objective measure of completeness Long-Term Studies, Maintenance and Operations Level of Effort Value based on passage of time; usually for work that cannot be defined or measured Project Management, Receptionist, Help Desk Objectivity

GSET Technical Seminar Series Space Telescope Science Institute November 21, Example: Planned vs. Actuals $13,000 under budget! Current Date

GSET Technical Seminar Series Space Telescope Science Institute November 21, Example: Earned Value BAC=$200 SV=EV-PV=($30) CV=EV-AC=($17) PMB PV EVAC

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Concepts  Planned Value (PV) – planned cost of doing the scheduled work (formerly BCWS)  Earned Value (EV) – planned cost of the work completed (formerly BCWP)  Actual Cost (AC) – actual cost of the work completed (formerly ACWP)  Performance Measurement Baseline (PMB) – the time-phased budget plan against which performance is measured

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Concepts (cont.)  Schedule Variance (SV) – measures how project is doing relative to the schedule SV = EV – PV Positive  Ahead of Sched., Negative  Behind Sched.  Cost Variance (CV) – measures how project is performing; productivity measure CV = EV – AC Positive  Efficient, Negative  Inefficient

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Concepts (cont.)  Budget Variance (BV) – measures how project is doing against the budget BV = PV – AC Positive  Under Budget, Negative  Over Budget  Budget At Completion (BAC) – sum of the planned value plus the Undistributed Budget

GSET Technical Seminar Series Space Telescope Science Institute November 21, Example: Earned Value VAC=BAC-EAC=($33) EAC=AC + ETC=$233 ETC=(BAC-EV)/CPI=$146 SPI=EV/PV=0.70 CPI=EV/AC=0.81

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Concepts (cont.)  Schedule Performance Index (SPI) – measure of schedule compliance: is work being done at the planned rate? SPI = EV/PV 1  Faster than planned  Cost Performance Index (CPI) – productivity measure: is the work costing what was expected? CPI = EV/AC 1  Efficient

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Concepts (cont.)  Estimate To Complete (ETC) – estimate of the effort required to complete the project from the current date ETC = (BAC – EV)/CPI  Estimate At Completion (EAC) – the estimated total cost of the project EAC = AC + ETC

GSET Technical Seminar Series Space Telescope Science Institute November 21, Earned Value Concept Summary AcronymDefinitionEquationInterpretation PVBudgeted cost of task(none) EVEarned value for task(none) ACActual cost of task(none) SVSchedule VarianceSV=EV - PV >0 = Ahead, <0 = Behind BVBudget VarianceBV=PV - AC >0 = Under, <0 = Over CVCost VarianceCV=EV - AC >0 = Productive, <0 = Unproductive BACBudget At Completion BAC= UB +  PV “UB”=Undistributed Budget SPISchedule Perf. IndexSPI=EV/PV >1 = Faster, <1 = Slower CPICost Perf. IndexCPI=EV/AC >1 = Efficient, < 1 = Inefficient ETCEstimate to CompleteETC=(BAC-EV) /CPI EACEstimate At CompletionEAC=AC+ETC VACVariance at CompletionVAC = BAC - EAC >0 = Under, <0 = Over

GSET Technical Seminar Series Space Telescope Science Institute November 21, Costs of EVMS  Marginal cost of using EVMS is estimated at less than 1% to a few% of total contract cost Based mainly on large DOD contracts with experienced EVMS users Some costs are unnecessary according to EVMS criteria, but effort is put into those activities anyway  Expect costs to be higher at STScI due to inexperience in using EVM and our culture Mitigated by our implementation Christensen, David S., “The Costs and Benefits of the Earned Value Management Process,” Acquisition review Quarterly, Fall, 1998, p. 373.

GSET Technical Seminar Series Space Telescope Science Institute November 21, Benefits of Earned Value  It is a single management control system that provides reliable data.  It integrates work, schedule, and cost using a work breakdown structure.  The associated database of completed projects is useful for comparative analysis.  The cumulative cost performance index (CPI) provides an early warning signal.  The schedule performance index provides an early warning signal. Christensen, David S., “The Costs and Benefits of the Earned Value Management Process,” Acquisition review Quarterly, Fall, 1998, p. 373.

GSET Technical Seminar Series Space Telescope Science Institute November 21, Benefits of Earned Value  The CPI is a predictor for the final cost of the project.  It uses an index-based method to forecast the final cost of the project.  The “to-complete” performance index allows evaluation of the forecasted final cost.  The periodic (e.g., weekly or monthly) CPI is a benchmark.  The management by exception principle can reduce information overload. Christensen, David S., “The Costs and Benefits of the Earned Value Management Process,” Acquisition Review Quarterly, Fall, 1998, p. 373.

GSET Technical Seminar Series Space Telescope Science Institute November 21, “The most common problem product teams face is unreasonable schedule pressure. … When teams are forced to work to unreasonable schedules, they are unable to make useful plans. Every plan they produce misses management’s edicted schedule and is therefore unacceptable. As a result, they must work without the guidance of an orderly plan. Under these conditions, the team will generally take much longer to complete the project than they otherwise would.” Watts Humphrey, “Pathways to Process Maturity: The Personal Software Process and Team Software Process,” SEI Interactive, June 1999.