1 SLEEVE Discussion Ianos Schmidt – U.Iowa Ugur Akgun – U.Iowa John Neuhaus – U.Iowa Lucien Cremaldi - U.Miss David R Winn – Fairfield And help from many.

Slides:



Advertisements
Similar presentations
CASTOR at CMS Enhancing Forward Physics
Advertisements

Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
CMS Hadronic Forward Calorimeter Restoration of Functionality Iowa, BU, FNAL severe descoping of HF in 2002 $$ for HB, tracker tail catcher for late developing.
HE Calorimeter Upgrade Studies HE Calorimeter Upgrade Studies Proposing to replace HE scintillators with quartz plates for high luminosity LHC runs 1.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
A Muon Veto for the Ultra-Cold Neutron Asymmetry Experiment Vince Bagnulo LANL Symposium 2006 Outline ● UCNA Experiment ● Muon background ● Proposed Veto.
03 Aug NP041 KOPIO Experiment Measurement of K L    Hideki Morii (Kyoto Univ.) for the KOPIO collaborations Contents Physics Motivation.
1 MICE Beamline PID w Aerogel Counters Lucien CremaldiAerogel R&D and Test Beam Ghislain GregoireDesign and Simulation Don SummersAerogel Procurement &
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
HCAL Fall Meeting 10/15/2005, Fermilab 1 Quartz Plate R&D Status F. Duru, S. Ayan, U. Akgun, J. Olson, A. Albayrak, Y. Onel The University Of Iowa V.Podrasky,
Update on Quartz Plate Calorimetry Y. Onel HCAL GENERAL MEETING March 27,
1 - Candidate Materials - Optics Tests - Background Tests - HV Tests - Radiation Resistance/Aging - Test Beam Rig SLEEVE Update - DRW 30 Oct 2010 D.R.
Study of HF pmt high tail signal FNAL: Jim F, Rick Vidal Iowa: Ugur Akgun, Asli Albayrak, Warren Clarida, Antony Moeller, Yasar Onel, Justin Parsons, Taylan.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
HF Sleeve Raddam Test Plans Ugur Akgun. Outline We started sleeve raddam in Iowa, ASAP. 11 different types of Tyvek from DuPond, two different thickness.
Spasimir Balev /CERN/ mrad 3 LKr simulation: – very slow, so only events with interesting topology are fully simulated: –  + with.
CMS Hadronic Endcap Calorimeter Upgrade Studies
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
Status of Aerogel detector for high pT upgrade at PHENIX Budget from US-J project for next two years : (1) 400 liters of Aerogel (2) 600 photomultiplier.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
1 SLEEVE Discussion Ianos Schmid – U.Iowa Lucien Cremaldi - U.Miss David R Winn – Fairfield And help from many 30 Oct 2010 Agun, Winn.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Scintillation Detectors
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
Quartz Plates R&D Status F. Duru, S. Ayan, U. Akgun, J. Olson, Y. Onel The University Of Iowa V.Podrasky, C. Sanzeni, D.R.Winn Fairfield University L.
HE CALORIMETER DETECTOR UPGRADE R&D Y. Onel for University of Iowa Fairfield University University of Mississippi.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Powdered TPB vs TPB Embedded in Plastic Matrix Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting Pasadena, Feb
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
E. A. Albayrak, HCAL Meeting, Fermilab, Nov HE CALORIMETER DETECTOR UPGRADE R&D STATUS E. A. Albayrak for The University Of Iowa Fairfield University.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
1 MICE Beamline PID w Aerogel Counters Ghislain Gregoire, Don Summers, Lucien Cremaldi*, MICE Collaboration Meeting, FNAL, Jun 06.
Radiation Hardness of new generation of plastic scintillators
03/22/2007HCal Electronics Meeting HO LIGHT GUIDE SIMULATIONS Justin Parsons, University of Iowa Jim Freeman, FNAL HO LIGHT GUIDE SIMULATIONS 1.
Area of a Right Angled Triangle
Quartz Plates R&D Status By F. Duru, S. Ayan, U. Akgun, J. Olson, Y. Onel The University Of Iowa V.Podrasky, C. Sanzeni, D.R.Winn Fairfield University.
KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)
HP SURVEY INSTRUMENT CALIBRATION AND SELECTION PRINCIPLES OF RADIATION DETECTION AND QUANTIFICATION CHAPTER 5 – REVIEW AND SUMMARY January 13 – 15, 2016.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
HF Calorimeter PMT Upgrade R&D Yasar Onel for University of Iowa, Fairfield University, INFN, Trieste.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
JASMIN December Counter Experiments (T-972/994) Toshiya SANAMI on behalf of JASMIN Counter team JASMIN Counter team H.Arakawa, M.Hagiawara, Y.Iwamoto,
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
Progress Report from Material Radiation Testing at NCSR Demokritos 28 February 20111Nick Gazis, CERN-BE/RF & NTU-Athens Input from: G. Riddone, A. Samoshkin,
Iowa PMT Test Station Ugur Akgun 1. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
Preliminary results from the attenuation scans in BGO crystal. 1 F.Lacava CERN
HF “Slice test box” installation
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
- Radiation Resistance/Aging - Test Beam Rig
SuperB meeting, Frascati
HF “Slice test box” fabrication and installation
ROBOX modification plans
MICE Beamline PID w Aerogel Counters
HE Calorimeter Upgrade Studies
HCAL Commissioning and Related Activities
HE Calorimeter Upgrade Studies
and their missing lengths
Presentation transcript:

1 SLEEVE Discussion Ianos Schmidt – U.Iowa Ugur Akgun – U.Iowa John Neuhaus – U.Iowa Lucien Cremaldi - U.Miss David R Winn – Fairfield And help from many 30 Oct 2010 Agun, Winn

2 Summary Tyvek, Teflon reflectors – Large body HEP experience. reflectivity >95% ~HEM. BUT: high resistive/dielectric strength, semi-specular. CMS operational tests simplest Tyvek and Teflon sleeve mockups: signal >93% of HEM signal, and low background from the sleeve itself (<10% of previous sleeve). See Taylan Yetkin talks. Test Data: radiosource, HV, n &  raddam (see U.Akgun talk) Tests: Tyvek, Gore DRP teflon v. good HEM replacement.

3 Sleeve Drawing – I.Schmidt GOAL: Reduce Sleeve Length to ~6 mm And Reduce internal Telescoping length To minimum: This is OK!

4 Sleeves Ianos Schmidt - Iowa A). Round Tyvek sleeve (For PMT’s presently used in HF) – kapton tape. B). Tyvek in adhesive lined polyolefin shrink tubing shaped by shrinking over mandrel. (concept worked well but adhesive glows under UV). C). White polyolefin shrink tubing. Investigating tapes, glues, snaps; square round adapters -heat-shrink, plastic pre-forms/armatures, separate square, round collars. (Iowa, Miss, Fairfield) ABC

5 Candidates TYVEK 1025 D(**)TYVEK inkjet sheet TYVEK 1073 DTYVEK inkjet banner TYVEK 1085 DTYVEK TY31 TYVEK 1056 DTYVEK cc sleeve TYVEK 1443 RGORE DRP -- 3 mm TYVEK 1079GORE DRP mm TYVEK Vivia% Cotton paper Polyethelene (HDPE)Teflon Baselines: Tyvek 1085D Gore DRP 0.5

6 Teflon vs Tyvek: Comments Teflon: slightly more UV(?)-Vis reflective; Slightly less Cerenkov than Tyvek. Less rad-hard; Activation/Fluorine evolutes; Reactions: F(n,  /  /T/p, nn,..); F( , n/e/..)+  ; Corona islands (10 18  -cm); Gore Reflector seem to scintillate or Cerenkov on back side; Thickness a problem; Expensive. Comments Tyvek: possible >Cerenkov; less specular in base-type than Teflon; No issues of neutron interaction; Very Radhard. Bottom Line: Down Select Tyvek (?)

7 Sleeve Background Tasks: Ru 106 source – more energetic – Redo beta light generation tests, but with…. Real sleeve prototypes: square or round for R7600; Gore DRP teflon, and tyvek –. Need R7600+ Base: Fairfield, Mississippi Re-Measure tickets as function of angle 90 o -1 0 Neutron response F(n,x), C(n,x) Test Beam: Feb FNAL M-Test Beam – Need time x task and team members

8 Plans T> 02/11 (Raddam: Co60, n completed! See U.Akgun talks). n-interaction tests: neutron source CERN, Fermi, ? – F 19 (n,α)N MeV , F 19 (n,  )F MeV , F 19 (n,p)O , 1.3 MeV , …….(n+p->p+n? gamma?) Beam Tests - February: – a) Direct compare teflon vs tyvek vs HEM sleeves on C- light(bundle, calo proto) through HEM guide -> R7600. – b) Muon HEM+sleeve scan: ~0 0 ->120 o Forming into sleeves: Procedures & Shapes – Glues (ex:magnet epoxies), tapes, plastic armatures (mylar, kapton +adhesives) – for no Scintillation!

9 Sleeve Summary Gore DRP, Tyvek Sleeve Materials for Downselect – Low to negligible ionizing-background light generation – Adaptable to square (if necessary – downselect!) – Preserves Signal (at worst 93%). – HV-safe for HFPMT at 6mm. R7600 in test next 2 months. Point Designs Sleeves progress per loaded schedule. Fasteners/adhesives for fabrication under study. Beam Tests February: Gore DRP-Tyvek DownSelect n-signal/activation next 3 months (if Gore DRP). Preliminary planning for manufacture and install