Green Building Design - Gold LEED Award TOYOTA Corporate Real Estate & Facilities Torrance, CA Project Team Owner: Toyota Motor Sales Construction Manager.

Slides:



Advertisements
Similar presentations
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Advertisements

Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Skyscraper Construction
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
th Street - Matarozzi/Pelsinger Building By Eric Bobrow.
The Medical Office Building Brendon Burley Structural Option April 11, 2005 Advisor: Dr. Thomas Boothby.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Plantronics Secret Green buildings for developing, manufacturing and marketing green products A complete Green Life Cycle.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
How did we create the first LEED Platinum Student Union in California?
1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Houston Independent School District James A. Berry Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS Berry Elementary is an environmental sciences magnet.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
NEW HARMONY APARTMENTS DAVIS, CA. NEW HARMONY APARTMENTS OWNER: MUTUAL HOUSING CALIFORNIA TEAM: KUCHMAN ARCHITECTS PC - ARCHITECT BARRISH PELHAM & ASSOCIATES,
Houston Independent School District Robert L. Frost Elementary School PROJECT PROFILE PROJECT DESCRIPTION Frost Elementary is a new replacement school.
Toyota Corporate Real Estate and Facilities Jennifer Drilling Construction Management April 15, 2003 Senior Thesis Presentation.
Green Building Demonstration Project Adam Saling City of San Diego.
PROJECT HIGHLIGHTS Energy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
Reading Structural Drawings
Steve Horseman – Grainger Industrial Supply, District Sales Manager for the State of Kansas The Four Corners of Sustainability.
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Construction Drawing Occupational Safety and Fundamentals
N O R T H A M E R I C A C O M M E R C I A L TDP
ENVELOPE. LIGHTING.
International Newspaper Group 2008 Gannett’s Green Campaign.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
LEED TOYOTA CORPORATE REAL ESTATE AND FACILITIES Jennifer Drilling 2003 Senior Thesis Construction Management Pennsylvania State University GOLD Leadership.
Green Dorm Group 6 Bethany Corcoran Andrew Ehrich Eric Stoutenburg Kimberly Walton.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
UNIVERSITY SCIENCES BUILDING Kathryn Gromowski | Structural Option Northeast USA Senior Thesis 2011Faculty Advisor: Andrés Lepage.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Energy Independence Outcomes Increase to 2,300 Tons of Heating and 2,000 Tons of Cooling Thru Geo-Exchange Create Jobs to Stimulate Economic Activity.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
U.S. General Services Administration EPA New England Regional Laboratory Best Practices and Lessons Learned John F. Buckley, Project Manager
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
Fun Facts: James M. Bennett High School
By Adam Beneroff Manitoba Hydro Place.
David Anderson Mechanical Option
Grunenwald Science and Technology Building
GREEN DORM Group 6 Bethany Corcoran Andrew Ehrich Eric Stoutenburg
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Biobehavioral Health Building, University Park, PA
Acterna Headquarters John M Sekel Germantown, Maryland
The Bond Street Wharf Baltimore, Maryland
Lehigh Valley Heritage Center
Located at Tufts University in Boston, Massachusitts
Project: 250 West Street, Columbus, Ohio
Presentation transcript:

Green Building Design - Gold LEED Award TOYOTA Corporate Real Estate & Facilities Torrance, CA Project Team Owner: Toyota Motor Sales Construction Manager Agency: HB & A Construction Manager Agency: HB & A General Contractor: Turner Construction General Contractor: Turner Construction Architect: LPA Architect: LPA Structural Engineer: Culp & Tanner Structural Engineer: Culp & Tanner Structural Steel Subcontractor: Orange County ErectorsStructural Steel Subcontractor: Orange County Erectors Tilt-Up Concrete Subcontractor: Guy Yocam ConstructionTilt-Up Concrete Subcontractor: Guy Yocam Construction Mechanical/Plumbing Engineer: GlumacMechanical/Plumbing Engineer: Glumac HVAC Subcontractor: Key Air Conditioning Inc.HVAC Subcontractor: Key Air Conditioning Inc. Electrical Engineer: KonsortiumElectrical Engineer: Konsortium Electrical Subcontractor: Sasco electricElectrical Subcontractor: Sasco electric General Overview Dates of Construction: Aug.1,2001 – March 1, 2003 Dates of Construction: Aug.1,2001 – March 1, 2003 Primarily Office Space ; Additional dining and car showroomPrimarily Office Space ; Additional dining and car showroom Conglomerate of 5 main buildings connected through a lobby with two Central Plants Conglomerate of 5 main buildings connected through a lobby with two Central Plants 3 stories totaling 644,000SF3 stories totaling 644,000SF Electrical/Lighting System All buildings topped with Photovoltaic Panels- will be the largest array in California – 620,000 kwh annual production All buildings topped with Photovoltaic Panels- will be the largest array in California – 620,000 kwh annual production Two Central Plant buildings house all main electrical equipment with two separate electrical utility servicesTwo Central Plant buildings house all main electrical equipment with two separate electrical utility services 277 V Distribution 277 V Distribution Open Offices constitute most floors- contain Linear Indirect Pendants, T5 standard fluorescents Open Offices constitute most floors- contain Linear Indirect Pendants, T5 standard fluorescents Motion Sensors and Photocells usedMotion Sensors and Photocells used Structural System Tilt-Up Cast-In-Place Concrete Exterior and Interior Panels (45’ height x 30’ long) braced by steel flange beams - allowed bays of Open Office spaceTilt-Up Cast-In-Place Concrete Exterior and Interior Panels (45’ height x 30’ long) braced by steel flange beams - allowed bays of Open Office space Spread Footing FoundationsSpread Footing Foundations Heavily enforced seismic considerationsHeavily enforced seismic considerations Mechanical System Jennifer Drilling Construction Management Penn State Architectural Engineering Special Features Project Delivery “Shelter In Place” Security system locks down indoor environment and protects from outdoor disaster“Shelter In Place” Security system locks down indoor environment and protects from outdoor disaster Use of reclaimed water; two separate storm drain systemsUse of reclaimed water; two separate storm drain systems Heavily recycled content of interior materials in buildingHeavily recycled content of interior materials in building 97% of Construction Waste Recycled97% of Construction Waste Recycled Energy Performance optimized to exceed California Title 24 State Energy Code by over 42%Energy Performance optimized to exceed California Title 24 State Energy Code by over 42% Electrical Car Stations on-siteElectrical Car Stations on-site Tobacco Smoke Control and Carbon Dioxide MonitoringTobacco Smoke Control and Carbon Dioxide Monitoring Over 75% of indoor space has a view to the outdoorsOver 75% of indoor space has a view to the outdoors 2 Central Plants provide exit ability from part of facility”2 Central Plants provide exit ability from part of facility” Direct Absorption Chillers, 2700 tons cooling loadDirect Absorption Chillers, 2700 tons cooling load VAV Boxes with reheatVAV Boxes with reheat System provided with Air/Dirt SeparatorSystem provided with Air/Dirt Separator GC/Owner:GC/Owner: Cost Plus Fee Cost Plus Fee Architect/Engineer:Architect/Engineer: Lump Sum Lump Sum Sub/GC:Sub/GC: Lump Sum Lump Sum