Improvements for next parts PIMS production meeting 26-27 February 2013 Rolf Wegner.

Slides:



Advertisements
Similar presentations
HVAC523 Soldering.
Advertisements

Precooling: You can put the cooling elements in the transport box when you leave the main hospital, and store them in the transport box approx. 0-4 hours.
Cleanup, Disposal & Clearance Chapter 8 Lead Abatement for Workers Course 1.
Engineering Drawings & Measurements
The White Box Robert Pantanella And Cam Macones. Goal The goal of the experiment is to insulate a soda can filled with hot water when it is placed in.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
Marine Oily Handling Devices and Pollution Prevention Chapter 5 Lesson 1 Alfa – Laval Separator (II)
Diffusion Through a Membrane
Care of materials  Clay will clog sinks! They will explode! I’m NOT kidding! So, rinse your hands and tools first in the red buckets of water.  Return.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
Internal Envelope Vac Bagging Findhan Strain. Split Tooling 5083 Aluminium (cost) CNC’ed Finished with 800 grit Not well polished as good surface finish.
PROCEDURES TO USE A CHAIN SAW PPT PPT Procedures Refer to Owner’s Manual for important instructions. Locate and obey safety precautions.
Record each step of this experiment in your notebook.
M.Taborelli, 7/11/07 Recommendations for handling high precision accelerating structures (EDMS ) M.Taborelli Aim: avoid contamination of the parts.
TECH 104 – Technical Graphics Communication
Dr. subhash technical campus
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
Hard Floor Care VCT floor finish application This presentation is available for review at:
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Engineering perspectives on quadrants (1/2) Experience on our first quad (Higo) (2/2) Perspective on quad (Higashi) CLIC09, Oct T. Higo (KEK)
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Status of Activities at CERN
Good Operating Practice. The importance of GOP General Listeria -specific GOP Specific food GOP These are in addition to the guidance available on the.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Glass slide Micropipettes Starting Materials Cut along dotted traces Plexiglas square (1.1” x 1.1”) 0.2” Interface reservoir sleeves Drummond 1-5-µL micropipette:
Fabrication and measurement of RF components for CLIC study
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
 Segmented Bowl Senior Woodwork. Overview  Materials and machines  4 step procedure: layout, cutting, laminating, turning.  Final product.
Preparation of Supplies for Sterilization. Objectives Explain the steps involved in cleaning, disinfecting, wrapping, and packaging sterile packs and.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Hanyang University 1/18 Antennas & RF Devices Lab. MODERN ANTENNA HANDBOOK by CONSTANTINE A.BALANIS ch – Kim Sung Peel.
1. Swab throat. 5. Read Results Positive = 2 lines. Strep A Rapid Test Strip Procedure For details, consult Lab Manual located at: P:\Clinical\Lab Manual.
Regardless of the reason why you are going to move, may it be for personal reasons or for work reasons, moving will always be stressful and expensive.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Results of short module and qualification strategy
Assembly of Crab Cavities couplers in SM18 clean room
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
Automotive Engines Theory and Servicing
Activity Overview Create and characterize an image on the “retina” of the human eye model. Understand the function and limitation of the adaptive lens.
Fabrication of Nb and Cu SPL cavities and required tools CERN status
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Horizontal Installation Overview
Technical Drafting –p401 Before a technical object can be manufactured, its shape and dimensions must be determined. A technical drawing must be created.
Miniature Train Project
The Report Vacuum Forming
Automotive Engines Theory and Servicing
There are a lot of events in our lives that we think, “suck”, but that is not true. The only thing that sucks is a vacuum. By definition a vacuum is a.
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Improvements for next parts PIMS production meeting February 2013 Rolf Wegner

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner2 transport box boxes very well made ! styrofoam protection good bubble wrap ok but could protect more by using larger pieces

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner3 plastic bags filled with nitrogen needs to be improved => very important for rings and end discs as they are not foreseen to be cleaned at CERN

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner4 plastic bags filled with nitrogen examples of packed structures: plastic bag filled with nitrogen and heat sealed

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner5 cleaning please use demineralised water for rinsing (cleaning procedure EDMS , step 8: "Final rinsing with demineralised water and ultrasound, followed by rinsing with ethylic alcohol")

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner6 ring M_ good work !!! CF flanges very well packed! slotted rotatable UHV flanges (SPLACPMB0057, SPLACPMB0058) already included => excellent ! welding looks good

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner7 disc M_6-7 (CPL ?) 7 plenty of defects, only a few are shown here please handle parts carefully, particularly in CPL please include a visual inspection report as specified in the Quality Assurance report for each part

Reception of PIMS elements PIMS production meeting February 2013 Rolf Wegner8 disc M_6-7 8 joints for the vacuum test and for the cooling connection will be destroyed all 16 threads have this problem important to chamfer particularly this edge with R≤0.2, indicated on the drawings as well as stressed in the technical specifications

Assembly of PIMS elements PIMS production meeting February 2013 Rolf Wegner9 burrs a sharp edged ring (burr) has been seen here. Please take care to chamfer here as well with R≤0.2 as specified => problematic for our alignment tool for welding

Improvements for next parts PIMS production meeting February 2013 Rolf Wegner10 Points shown: please use more bubble wrap for better protection please use heat sealed plastic bags filled with nitrogen procedure: place PIMS element, evacuate as much air as possible out of the bag, fill bag with nitrogen (from the bottom), evacuate gas (air/nitrogen mixture; from the bottom) again, fill bag with nitrogen (from the bottom) again and finally heat seal bag please follow closely the cleaning procedure (EDMS ) please handle parts with care, particularly in CPL. So much effort is made in reaching the required tolerances… please chamfer all edges as specified (R≤0.2), particularly for cooling channels (re-machining of disc M_6-7) and alignment surface (outside) of rings

Improvements for next parts PIMS production meeting February 2013 Rolf Wegner11 Further points: please create a visual inspection report for every element, for example in a separate document (simple PowerPoint, etc.) radial scratches seen on faces of ring G_13-14 where joints for vacuum check are placed => will be problematic to test similar pieces (ring G_13-14 is used for machining tests, no vacuum test needed).