R EPROCESSING S PENT N UCLEAR F UEL IN I NDONESIA : A N O VERVIEW OF A REVA ’ S O PPORTUNITY FOR FDI.

Slides:



Advertisements
Similar presentations
Denmark: The Current Global Leader in the Wind Energy Field.
Advertisements

New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Li $ LG Chem of South Korea FDI in Bolivia’s Lithium Industry LG Chem Global Strategy Team Scott He Harvey Hong Arash Parham Kenneth Turner.
Indonesian Energy Overview Beijing, Outline  Indonesia: A Brief Introduction  Energy Demand & Supply  Current National Energy Policies and Plans.
Nuclear Renaissance and Nonproliferation in North-East Asia Hua HAN Associate Professor School of International Affairs Beijing University.
1. 2 The Problem 75% of our energy expenditures leave the state, versus growing jobs, incomes and revenues here at home. Indiana already imports essentially.
Regional Emission-free Technology Implementation (RETI): Diversifying the U.S. Electricity Portfolio Marc Santos 2008 ASME WISE Intern University of Massachusetts.
Advancing the Commercialization of Small Modular Reactors Michael Kurth American Nuclear Society & Washington Internship for Students of Engineering.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
Resource and Energy.
Clear Thinking on Nuclear: New Plant Construction Nuclear energy is dependable, affordable, and environmentally sound. Nuclear energy is needed to meet.
The Global Energy Picture.
Non-renewable Power Resources: Nuclear Power
Nuclear Energy and Australia Presentation by Prof Jim Falk, Australian Centre for Science, Innovation and Society.
Biomass to Energy Projects in Indonesia CDM & Sustainable Development January 25 –26, 2006 Shangri-la Hotel, Jakarta -Indonesia Iwan Sutanto, PT. LUNTO.
Nuclear Power Isar Plant - Germany Diablo Canyon - California.
Arguments Against Nuclear Power Development in Iran May, 2003.
BUSINESS OPPORTUNITIES IN ROMANIA’S ENERGY SECTOR A Market Briefing U.S. Commercial Service Bucharest June 2, 2010.
Non-renewable Energy Source. Non-renewable Sources Non-renewable energy source: An energy source that either cannot be renewed, or that takes millions.
Gas Development Master Plan Scenarios for the GDMP Capacity Building Workshop Bali, 1-2 July 2013.
Chapter Ten Copyright, John Wiley and Sons, Inc. Chapter Ten three Learning Concepts – Chapter Understand the factors that managers must consider.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Federal Energy and Environmental Regulation Agencies and Laws
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
0 - Press Conference - Introduction by Mr. Willy Bosmans, President of Eurogas 19 May, 2005, Hotel Hilton Vienna.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Energy: Responsibility for the Future Vujica Lazovic, PhD 5 th VIENNA ECONOMIC FORUM Investment Possibilities in The Countries from The Adriatic to The.
April 29, 2015 Lucinda Smith Climate Action Plan Process.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
Energy Sources: Overview
Japan’s Nuclear Energy Program
The Nuclear Renaissance Dr. Charles K. Ebinger Director, Energy Security Initiative Brookings.
R I Facer, NENP-NPTDS, IAEA
Office of Nuclear Energy U.S. Department of Energy
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
NUCLEAR POWER PLANT FINANCING IAEA - Infrastructure Technical Meeting Vienna, November 2007 Fanny Bazile Forecast Director Nuclear Energy Division.
Environmental Report – Are they Creating Transparency on Environmental impacts/costs? By Dr Chris Anastasi Member of EURELECTRIC Working Group Environmental.
International Energy Markets Calvin Kent Ph.D. AAS Marshall University.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
STRUCTURE OF PRESENTATION 1. Energy Policy goals and Review remit 2. Key challenges 3. Conclusions and Impact 4. Next Steps/Issues 1.
Natural Resource Partners L.P. SMH Capital Investor Growth Conference New York, NY November 8-9, 2007.
Coal as a Future Generation Fuel Chris M. Hobson S enior Vice President and Chief Environmental Officer December 3, 2009.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
Potential Regional Nuclear Spent Fuel Management and Regional Uranium Enrichment /Reprocessing Paths for Asia Jungmin KANG CISAC, Stanford University 2007.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
The Nuclear Fuel Cycle 1. NUCLEAR FUEL Nuclear fuel is the energy source of nuclear reactors and an essential element of the reactor core. The heat energy.
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
Nuclear Energy and Waste By: David Long ( ); Chris Marcyniuk ( ); Adam Foster ( ) IMS3 Sustainability.
We have now made biomass for renewable energy our core business The Group has been involved in the last 30 years in various business in the trading.
World Resources An Overview Types of Resources CAPITAL RESOURCES The money and machines used to produce goods or services.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
U.S. Energy Information Administration Independent Statistics & Analysis Future Prospects for Oil Production for New America Foundation July.
Power Generation
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Chapter 8 Energy and Civilization: Patterns of Consumption Energy and Civilization: Patterns of Consumption.
Energy Transition: Reforms, Investment and the Post-Paris Agenda Dr. Robert Ichord CEO, ICHORD VENTURES, LLC February 4, 2016.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Smart Cities - Driving a New Economy – March 2016 David Lynch General Manager, Research and Development Enerkem biorefineries: A Smart City Solution for.
3SW – Quiz#1 Vocabulary – Energy Resources. 1. Non- Renewable An energy resource that takes __________________ of years to form from the remains of plants.
Greening the Grid with America’s Nuclear Power Plants.
IAEA International Atomic Energy Agency Sustainable Uranium Resources Development Business Model Canvas for MONGOLIA / MINISTRY OF MINING Presented by.
AREVA’s Reactor Projects: Building on Experience Kathy Williams, Chief Financial Officer AREVA Inc. July 29, 2014.
Global Energy Problems and Counter Policies and Measures of Korea
NS4960 Spring Term 2017 Korea: Energy Policy
Greenhouse Gas Emissions
Japan’s Nuclear Energy Program
NS4960 Spring Term 2018 Korea: Energy Policy
Presentation transcript:

R EPROCESSING S PENT N UCLEAR F UEL IN I NDONESIA : A N O VERVIEW OF A REVA ’ S O PPORTUNITY FOR FDI

P ROJECT B RIEF & F INAL D ECISION Proposed Project Build and operate a 200 tonne uranium nuclear fuel reprocessing and treatment facility in Indonesia by 2027 Final Decision Project is infeasible due to inordinately high risks and uncertain returns Relevant Stakeholders PT PLN: Indonesian state-owned electric utility KEPCO: Korean Electric Power Company Investment Criteria Investment Rationale Proposed scope, structure, and costs Investment Risks

C OMMERCIAL N UCLEAR P OWER V ALUE C HAIN Front End: Mining, conversion, and enrichment AREVA and KEPCO have a joint venture to develop a uranium mine in Niger. KEPCO will use this mine to supply the nuclear power stations it has built around the world. Reactors & Services: Construction and operation of plants KEPCO entered into a memorandum of understanding to build turnkey nuclear power plants for PLN, the state-owned electric utility which will transmit and distribute the electricity generated by the power plant. Back End: Fuel recycling, reprocessing, and treatment Reprocessing and treatment creates new energy resources from 96% of the content of spent nuclear fuel and stores the remaining 4% (final waste). Areva is the world leader in nuclear fuel recycling; KEPCO does not offer this service line.

I NVESTMENT R ATIONALE Indonesian growth potential and current macroeconomic stability Elevation to G-20 status in 2009 Favorable FDI investment climate Commitment to nuclear energy: 4 commercial nuclear power plants (first by 2017) Good fit with Areva’s growth strategy to grow its Back-End Division Sources: CIA World Factbook, IMF, OECD

I NDONESIA ’ S E NERGY N EEDS & A MBITIONS Energy Needs >90% current energy needs primarily fulfilled by natural gas, oil, and coal Electricity demand is expected to grow 6 - 7% annually Renewable energy sources must account for 5% of supply by 2025 Nuclear History Research reactors since 1957 Member of the IAEA since 1957, signed non-proliferation treaty in 1970 Passed the Nuclear Policy Act in 1997, establishing a framework for commercial nuclear operations KEPCO to build 4 commercial reactors Sources: John Chipman, “Preventing Nuclear Dangers” and Indonesian Institute for Energy Economics, “Indonesian Energy Overview,” PowerPoint presentation, July 2007

Project: Build 200 tonne uranium nuclear fuel processing facility Investment vehicle: Joint Venture FDI Domestic ownership of nuclear FDI must be ≥5% Proposed joint venture partner: PLN Primary customer: PLN Estimated cost: US$5b to US$10b Financing: Public-Private Partnership Project start: 2022 Project duration: 5 years Operations start: 2027 Projected annual revenue: $250 m Projected annual net income: $35 m P ROJECT S COPE, S TRUCTURE & C OSTS

I NVESTMENT R ISKS