“Rethinking” Ancillary Services in ERCOT and Efforts to Incorporate “Loads In SCED” ERCOT Staff Operator Training Seminar Spring 2014.

Slides:



Advertisements
Similar presentations
Future Ancillary Services (AS) Workshop
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Loads Acting as a Resource Relationships with QSEs and LSEs
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
April 23, 2014 DSWG Loads in SCEDv1 Load Participation in SCED v1 Overview & Refresher ERCOT Staff.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Sai Moorty ERCOT Integration Options into ERCOT systems.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Overview of Revised Ancillary Services (AS) Framework Proposal
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Future Ancillary Service Team (FAST) and Technical Advisory Committee (TAC) Workshop #2 ERCOT Staff August 25,
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
August 8, 2013 Loads in SCED Workshop II Load Participation in SCED NPRR 555 ERCOT Staff Presentation.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
Responsive Reserve Service Deliverability Review September 15,
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Synchronous Inertial Response
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
ERCOT Public 1 Future Ancillary Services Team (FAST) and Technical Advisory Committee (TAC) Workshop ERCOT Staff July 25, 2014.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
NERC: Essential Reliability Services
Appeal of PRS Rejection of NPRR 667
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

“Rethinking” Ancillary Services in ERCOT and Efforts to Incorporate “Loads In SCED” ERCOT Staff Operator Training Seminar Spring 2014

Introduction This presentation an overview of the current effort to “rethink” the Ancillary Services in ERCOT and an overview of the efforts to incorporate “Loads in SCED”.

Objectives (part 1) At the completion of this course of instruction you will: Identify drivers for rethinking the Ancillary Services in ERCOT. Identify the AS products being discussed for a new AS framework.

Objectives (part 2) Identify Load Resources that can participate in Security Constrained Economic Dispatch (per NPRR 555). Identify Real-Time Market Energy Bid Characteristics for Load Resources participating in SCED.

Drivers for new AS Framework Current AS Framework has performed well but has issues Resources could provide some services more efficiently if the requirements were decoupled (PFR/ FFR/ Contingency Reserve) New service needed to ensure technical requirements are met that used to be provided, inherently, by generators (e.g. inertia) Awkward to fit capabilities of new technologies (e.g. CCGTs with duct firing, wind turbines) that could provide services efficiently Changes in market design and control systems(e.g. 5 minute dispatch, HRUC) have reduced the need for other services New regulatory requirements (BAL-003) Need for changes has been highlighted in discussion of Fast Responding Regulation Service (FRRS), NPRR 524(Resource Limits in Providing Ancillary Service), etc. Slide #5

Goal Future AS Framework Technology neutral Market-based Based on fundamental needs of the system, not resource characteristics Unbundled services Flexible for new technologies Pay for performance, where practical Co-optimized procurement Will evolve over time Current AS Framework Based on capabilities of conventional steam generating units Unique services bundled together due to inherent capabilities of conventional units Mix of compensated and uncompensated services New technologies are cobbled on, with difficulty This is key slide Transition Plan TBD Now 5+ Years

Scope of Proposed AS Framework Long-term Ancillary Services (AS) framework intended to guide: Decisions on near-term changes to current AS Requirements for changes to ERCOT systems (EMMS, etc.) Investment in new resources and new resource types by the mkt. Framework will be developed in phases, due to complexity of issues Current Phase will only address frequency control services Future Phases may address Voltage Support and other services Framework should eventually include roadmap for transition from current AS to future framework Prioritization of services to be transitioned Inter-relationship of services that must transition concurrently High-level consideration of ERCOT systems and market impacts

ERCOT proposes the transition to the following five AS products: Proposed AS Products ERCOT proposes the transition to the following five AS products: Synchronous Inertial Response Service (SIR), Fast Frequency Response Service (FFR), Primary Frequency Response Service (PFR), Regulating Reserve Up (RRU) and Regulating Reserve Down (RRD) Service, and Contingency Reserve Service (CR).

ERCOT Proposal This revised AS set adds and/or redefines specific AS products currently used by the ERCOT System and Subsumes different elements within the current Responsive Reserve Service into several of the newly defined services. Recognizes during the transition period from today’s AS to the future AS set, there may be the need for a Supplemental Reserve Service that would be similar to today’s 30-minute Non-Spin Service.

Fast Frequency Response Current Framework Proposed Framework 400-600 MW Regulation Regulation Fast Frequency Response Primary Frequency Response 2800 MW Responsive Contingency Reserve Supplemental Reserve Max 1500 (incl. 500 to RRS) Non-Spin Synchronous Inertial Response

Synchronous InertiaL Response (SIR) service

Synchronous Inertial Response (SIR) Service SIR is stored kinetic energy that is extracted from the rotating mass of a synchronous machine following a disturbance in a power system Maintain minimum Rate of Change of Frequency (RoCoF) Provide sufficient time from Point A to Point C, for Fast Frequency Response and Primary Frequency Response No triggering RoCoF protection of synchronous generators (generally 0.5 Hz/s)

Synchronous Inertial Response Service SIR has significant implications on the RoCoF during power imbalances; With increasing use of non-synchronous generation, changing load characteristics (less motor loads), increase in Combined Cycle units (lower inertia), the system SIR response is reduced: RoCoF increases, leaving insufficient time for PFR to deploy and arrest the system frequency excursion. High RoCoF may trigger generation RoCoF protection, tripping additional synchronous generators.

Synchronous Inertial Response Service So far, the RoCoF during high wind/low load condition was less than 0.2 Hz/s and the average time to reach frequency nadir during frequency events is 4 to 6 seconds. The system inertia available in the real time operations under current conditions is still sufficient. Studies based on 2012 system conditions indicated RoCoF as high as 0.4 Hz/s for two largest unit trip (2750 MW as per recently approved NERC BAL-003 standard).

SIR, Future work Monitor and project the trend of ERCOT system inertial response and RoCoF Identify the minimum needs of system inertia and duration between points A and C Gather data to determine each generator’s RoCoF tolerance Investigate capability and value of synthetic inertial response from renewable energy resources to contribute to system’s SIR

Fast frequency response (ffr) service

Fast Frequency Response (FFR) Service Need To changing frequency to supplement the inherent inertial response from synchronous machines To provide sufficient time for PFR to deploy and arrest fast frequency excursion in the event of sudden power imbalance Deployment and Performance Self deployment Provide full response within 30 cycles (0.5 secs.) at a specified frequency thresholds and sustained for at least 10 minutes FFR service will require a high resolution measurement

Fast Frequency Response (FFR) Service Discussion Presently there is no separate FFR Service in ERCOT, however up to 1400 MW of Responsive Reserve Service (RRS) procured from Load Resources (LR) satisfy FFR characteristics In the proposed AS framework FFR and PFR are highly interdependent and the required quantity of each service can vary based on the system conditions FFR and PFR work together to produce the desired system response FFR service cannot completely replace the PFR service A performance requirement needs to developed

Primary frequency response (Pfr) service

Definition of PFR Service Primary Frequency Response (PFR) is defined as the instantaneous proportional increase or decrease in real power output provided by a Resource in response to system frequency deviations. This response is in the direction that stabilizes frequency. Primary Frequency Response is attained due to Governor or Governor-like action PFR is instantaneous response relative to the frequency deviation, PFR is generally delivered completely within 12 to 14 seconds.

Primary Frequency Response (PFR) Service- Need ERCOT as a single Balancing Authority Interconnection with only limited interconnection to the other Interconnects is solely responsible for maintaining frequency to maintain reliability and meet NERC standard requirements. All of ERCOT’s frequency response can only come from Resources within the ERCOT Interconnection. The BAL-003 NERC Frequency Response Standard BAL-003 sets a Frequency Response Obligation (FRO) for each BA based on loss of two largest single units. The minimum FRO for ERCOT is 413 MW/0.1 Hz

Determination of the Amount of FFR and PFR Reserves The objective of Fast Frequency Response (FFR) and Primary Frequency Response (PFR) Reserves should be to ensure Frequency is arrested above UFLS threshold of 59.30 Hz and to meet NERC FRO Standard (BAL-003). Frequency Response Obligation (FRO) for ERCOT is determined based on instantaneous loss of two largest units (2750 MW). ERCOT must develop methodologies for the regular assessment of the needed concurrent amounts of both FFR and PFR.

Determination of the Amount of FFR and PFR Reserves How much PFR is needed will be based on minimum requirement for FFR while maintaining minimum PFR capability within Generators (for example, in the current RRS, Load Resources can provide up to 50% of 2800 MW RRS). System Load FFR PFR(5% Droop) <=35000 MW 840 MW(30% 0f 2800) 1960 MW 0 MW 4480 MW

Regulating Reserve (rr) service

Regulating Reserve (RR) Service – Up & Down An amount of reserve responsive to Load Frequency Control, which is sufficient to provide normal regulating margin. ERCOT generation is dispatched through Security Constrained Economic Dispatch (SCED) every five minutes to balance the generation and demand. The power imbalance between each SCED interval will cause frequency deviation that requires Regulating Reserve to compensate. This action will be provided by RR service.

Regulating Reserve (RR) Service – Up & Down While not substantially changing from todays Regulation Service ERCOT is proposing to implement the following: LFC signals will be delivered by ERCOT to the QSE specifically for the Resource providing this service The deployment instructions should be determined by taking into consideration ramp rates, HSLs etc. of each of the individual Resources. Resources providing RR should be limited to min(NURR,NDRR)*5*0.70, where NURR and NDRR are Normal-Up Ramp Rate and Normal-Down Ramp Rate The pay for performance approach should reward those Resources that closely follow the ERCOT LFC signal ERCOT will re-visit its LFC and RLC to avoid deploying RR for more than 10 continuous minutes in one direction during normal operation.

Contingency reserve (cr) service

Contingency Reserve (CR) Service – Need & Purpose CR is to ensure that the Balancing Authority is able to restore Interconnection frequency within defined limits following a DCS event or large net load forecast error within 15 minutes and restore its Primary Frequency and Regulating Reserve. According to NERC BAL-002-1 Disturbance Control Standard (DCS), The minimum amount of CR required is equivalent to “Most Severe Single Largest Contingency”, in ERCOT’s case this is currently 1375 MW. ERCOT may additionally procure CR reserve to cover for large net load forecast errors. To ensure ERCOT can meet the standard, the CR must be fully deliverable within 10 minutes so that frequency can be restored to the pre-disturbance level within 15 minutes

Qualification Deployment Performance Contingency Reserve Qualification Resources providing CR should be qualified up to the MW value to which they are able to ramp within 10 minutes from the time of deployment. Deployment ERCOT will deploy CR for a sizable generation trip. Resources providing CR must telemeter their ramp-rates such that SCED can dispatch the full Resource CR responsibility within 10 minutes. Performance Resources providing CR must be able to deliver and sustain the reserve deployments for the full hour it is carrying that obligation.

Supplemental reserve (Sr) service

Supplemental Reserve (CR) Service SR service is needed to compensate for net load forecast error and/or forecast uncertainty on days in which large amounts of reserve are not available online Generation Resources capable of being ramped to a specified output level within thirty (30) minutes or Load Resources that are capable of being interrupted within thirty (30) minutes and that are capable of running (or being interrupted) at a specified output level for at least one (1) hour Supplemental Reserve Service would be similar to today’s 30-minute Non-Spin Service

Review of “Future Ancillary Services” ERCOT proposes the transition to the following five AS products: Synchronous Inertial Response Service (SIR), Fast Frequency Response Service (FFR), Primary Frequency Response Service (PFR), Regulating Reserve Up (RRU) and Regulating Reserve Down (RRD) Service, and Contingency Reserve Service (CR).

NPRR 555 LOADS IN sced

Targeted to be implemented by Summer 2014 NPRR 555: Loads in SCED 1.0 NPRR 555 provides a mechanism for demand response to contribute to price formation Targeted to be implemented by Summer 2014 Discussion about Loads in SCED version 2.0 in progress

High-level summary Eligibility to participate: LSE QSEs representing Load Resources capable of following 5-minute SCED base point instructions Existing or new single-site Controllable Load Resources (CLRs) SCED qualification will be a new attribute for redefined CLR Aggregate Load Resources (ALRs) composed of multiple sites within single ERCOT Load Zone (subset of CLR) New interface will allow QSEs to maintain ALR populations Will not support direct participation by third-party DR QSEs Will not support DR with temporal constraints or block energy bids If LR’s bid is on the margin, base point instructions could require LR to move up or down incrementally every 5 minutes to any level between its LPC and MPC SCED will honor LR’s telemetered ramp rates

High-level summary (cont.) QSEs with LRs in SCED will submit Bids to buy (not Offers to sell) Bids will reflect LR’s willingness to consume “up to” a specified five-minute Load Zone LMP May be a curve or a MW bid at single strike price Bid curve option could allow the QSE to submit bids with different strike prices for separate loads within the LR Bid will modify the SCED demand curve and have ability to set price SCED Generation to be Dispatched (GTBD) will be adjusted to accommodate LR participation This will ensure proper price formation and reduce the likelihood of oscillating dispatch instructions Bids from LRs capped at the System Wide Offer Cap This is to avoid stranded AS and PRC ‘Bid to buy’ creates settlement outcomes equivalent to the “volumetric flow” LMP minus G methodology endorsed by TAC, while avoiding need for ERCOT to “send back” the DR value to the LSE

High-level summary (cont.) LR benefits and opportunity: Avoided cost of consumption above specified price Price certainty due to ERCOT dispatch Eligibility to provide Non-spin Treated similarly to Offline Generation providing Non-spin Energy Bids ≥$180 will need to be released to SCED within 20 minutes following dispatch NPRR 555 also proposes that any CLR providing RRS also must be dispatched by SCED Market impacts: LR Bids may set price in the RTM No make-whole payments No load ratio share uplifts to market for DR value SCED will dispatch LRs for power balance and congestion management using the applicable Load Zone Shift Factor

LRs in Ancillary Services & SCED RRS and Non-Spin from CLR will be deployed via economic dispatch of DR capacity via SCED CLR will have RTM Energy Bid that covers the RRS and/or Non-Spin capacity released to SCED Also can optionally bid additional DR capacity for SCED dispatch SCED will only consider CLR for dispatch if its telemetered Resource status is ONCLR or ONRGL Cannot be OUTL if carrying AS responsibility unless QSE moves responsibility to a different Resource No change to existing participation in RRS by UFR-type Load Resources UFR-LR-RRS may still be deployed manually in EEA 2 Prices will be at SWCAP any time this happens because Gen-RRS is deployed first No change to existing ERS

CLR with Bid to Buy: SCED Objective & Power Balance SCED optimization will minimize cost of dispatch of supply and maximize revenue from demand while meeting Power Balance Minimize { Sum(OfferPricegen * BasePointgen) – Sum(BidPriceLR * BasePointLR) } BasePointgen is instruction on how much to produce BasePointLR is instruction on how much to consume NPFLR is current telemetered real power consumption All Resources can follow 5 minute SCED Base Points Power Balance Constraint: Supply=Demand Supply = Sum (BasePointgen) Demand = GTBD = Inelastic Demand + Elastic Demand Inelastic Demand = GTBD - Sum(NPFLR) Elastic Demand = Sum (BasePointLR) Sum (BasePointgen) = GTBD - Sum(NPFLR) + Sum (BasePointLR)

Example of SCED outcome: CLR with Bid to Buy G1 Offer to Sell: 60,000 MW @ $50/MWh G2 Offer to Sell: 2,000 MW @ $300/MWh LR Bid to Buy: 1,000 MW @ $200/MWh  willingness to consume up to 1,000 MW if LMP at or below $200/MWh No ramp rate limitations for any Resource All Resources follow 5 minute SCED Base Points LR Base Point is instruction on how much to consume   t t+5 t+10 t+15 t+20 t+25 LMP 50 200 300 Inelastic Demand 58,500 59,700 60,050 60,125 59,075 NPF_LR 1,000 925 GTBD 59,500 60,700 60,350 59,425 BP_G1 60,000 BP_G2 125 BP_LR

RTM Energy Bid Characteristics The RTM Energy Bid is CLR specific The RTM Energy Bid is used only in the Real-Time Market (SCED) The RTM Energy Bid must be submitted before the end of the Adjustment Period for a given Operating Hour Bid price cannot exceed SWCAP Regulation Up & RRS capacity on bid curve shall be priced at SWCAP Non-Spin capacity on bid curve shall be priced no lower than $180/MWh

RTM Energy Bid Characteristics The RTM Energy Bid is submitted as a curve having up to 10 points (MW/price combinations) The MW range on the bid curve goes from zero to total demand response capability First bid MW point is at zero MW (left-most point on the bid curve) Last bid MW point is the total demand response capability (right-most point on the bid curve) The prices on the bid curve from 0 MW to last bid MW are monotonically non-increasing going from left to right Price at 0 MW is highest Price at last bid MW is equal to or lower than price at 0 MW Price in between 0 MW and last bid MW are monotonically non-increasing

RTM Energy Bid Characteristics The RTM Energy Bid can be submitted with a fixed not-to-exceed price for an “up to bid MW” This is a submission of a bid curve with two (MW/price) points having the same price for both MW points. The first MW point is at 0 MW (left-most point) The last MW point is the total demand response capability (right-most point)

RTM Energy Bid Characteristics: Example Bid Curve $/MWh SWCAP SWCAP RTM Energy Bid RegUp RRS NSpin 180 MW Total Demand Response Capability

RTM Energy Bid Characteristics There is no mitigation of the RTM Energy Bid in SCED Step 2 For each SCED run, the RTM Energy Bid is right shifted so that the last MW on the bid curve coincides with the telemetered Maximum Power Consumption (MPC) By this right shift of the bid curve, if the telemetered Low Power Consumption (LPC) is less than the first point of the right-shifted RTM Energy Bid, then ERCOT shall create a proxy bid extension from LPC to this right-shifted first point of the bid curve with a price of SWCAP

RTM Energy Bid: Example Bid Curve Right Shift for SCED Use $/MWh RTM Energy Bid MW Total Demand Response Capability Proxy Bid extension $/MWh SWCAP SWCAP Right shifted RTM Energy Bid MW LPC MPC

(No Non-spin responsibility) Scenario 1 ALR CLR (No Non-spin responsibility) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW DR-capable ► ► ► $1,000 $50 MPC LPC → For any SCED intervals that the LR’s bid to buy is greater than the five-minute Load Zone LMP, SCED Base Point will instruct the LR to consume at its telemetered Maximum Power Consumption, subject to ramp rate limitations from its current consumption level (NPF) 10 MW Firm

(No Non-spin responsibility) Scenario 2 ALR CLR (No Non-spin responsibility) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW DR-capable ► ► ► $1,000 $1,500 LPC LPC → For any SCED intervals that the LR’s bid to buy is less than the five-minute Load Zone LMP, SCED Base Point will instruct the LR to consume at its telemetered Low Power Consumption, subject to ramp rate limitations from its current consumption level (NPF) 10 MW Firm

(No Non-spin responsibility) Scenario 3 ALR CLR (No Non-spin responsibility) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW DR-capable ► ► ► $1,000 $1,000 LPC≤ BasePoint ≤ MPC LPC → For any SCED intervals that the LR’s bid to buy is equal to the five-minute Load Zone LMP, SCED may dispatch the LR in either direction (up or down) in increments as small as 0.1 MW, within the bounds of the LR’s telemetered Maximum Power Consumption and Low Power Consumption, subject to its telemetered ramp rate limitations from its current consumption level (NPF) In this scenario, the LR sets the Load Zone LMP 10 MW Firm

(5 MW Non-spin responsibility; 5 MW additional DR capability) Scenario 4a ALR CLR (5 MW Non-spin responsibility; 5 MW additional DR capability) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW add’l DR-capable ► $1,000 ► ► $1,500 LPC+5MW subject to ramp rate limitations from its current consumption level (NPF) 5 MW Non-spin ► $5,000 LPC → 5 MW Firm

(5 MW Non-spin responsibility; 5 MW additional DR capability) Scenario 4b ALR CLR (5 MW Non-spin responsibility; 5 MW additional DR capability) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW add’l DR-capable ► $1,000 LPC≤ BasePoint ≤ LPC+5 subject to ramp rate limitations from its current consumption level (NPF) ► ► $5,000 5 MW Non-spin ► $5,000 LPC → 5 MW Firm

Drivers for moving to a new Ancillary Services Framework includes the following: The Generation mix in ERCOT is changing new regulatory requirements A new framework should allow better use of the capabilities of existing and new Resources Better specifications and performance based pay would likely lead to a more efficient way to acquire and deploy AS All of the above

The proposed AS products (currently in discussion) within the new AS framework does NOT include:   (SIR) Synchronous Inertial Service (FFR) Fast Frequency Response (PFR) Primary Frequency Response ERS (QFR) Quick and Flexible Ramping

The objective of Fast Frequency Response (FFR) and Primary Frequency Response (PFR) Reserves should be to ensure Frequency is arrested above UFLS _________ __ _____ __ and to meet NERC FRO Standard (BAL-003).   threshold of 59.30 Hz threshold of 59.70 Hz threshold of 59.91 Hz threshold of 59.80 Hz

The following are eligible to participate as a Load Resource in SCED (per NPRR 555).   Existing or new single-site Controllable Load Resources Aggregate Load Resources (ALRs) composed of multiple sites within single ERCOT Load Zone Load Resources with temporal constraints or block energy bids Both a and b

Which of the following are true about Load Resources participating in SCED: QSEs with LRs in SCED will submit Bids to buy (not Offers to sell) Bids will reflect a LR’s willingness to consume “up to” a specified five-minute Load Zone LMP Base Point instructions could require a LR to move up or down incrementally every 5 minutes to any level between its LPC and MPC (subject to ramp rate limitations) All of the above

Questions? ON OFF