Sheltering in buildings from toxic outdoor releases R. Carrié, R. Goyet, and D. Limoges CETE Lyon SETRIC workshop Mitigation : from experts to local authorities.

Slides:



Advertisements
Similar presentations
1 Shelter-in-Place A Practical Guide. 2 Chemical Fire Aboard Train Prompts Evacuation in Kentucky City Danville, KY - Portions of Danville, Kentucky were.
Advertisements

Museum Presentation Intermuseum Conservation Association.
Hazardous Materials Are... Substances that because of their chemical nature, pose a potential risk to life, health, or property if they are released or.
PowerPoint ® Presentation Chapter 14 Homeland Security Homeland Security Building Layout Specific CBR Attack Prevention Recommendations Securing Outdoor-
Disaster Planning What Supervisors Need to Know. Session Objectives You will be able to: Recognize the types of workplace disasters you may face Understand.
Valley City State University | Facilities Services
Emergency Management Planning Louis Stokes Cleveland, Department of Veterans Affairs Medical Center JCAHO Environment of Care Series Fiscal Year 2009.
3 1. Fire & Lifesafety codes for Small Business 2. Fire Protection Plan 4. Evacuation Plan & Drill 5. Personnel & Personal Preparedness Alert.
Think Safe. Act Safe. Be Safe. Monthly Safety Spotlight, March 2010: Emergency Preparedness and Continuity Planning Preparing ahead of time helps you cope.
OVERCOMING CHALLENGES IN EMERGENCY MANAGEMENT NAWIC May 2013.
MU Building Emergency Coordinator Training
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Codes and Standards to be followed in the design and construction of the Green Energy facility National Fire Protection Assoc (NFPA); American Gas Association.
Phone: Fax: Emergency Mgmt.: Fire Safety: 15 Edgewood Avenue Atlanta, Georgia website:
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
City of Radcliff Preparing for Weather Emergencies.
SHELTER IN PLACE DRILL TRAINING Preparation for April 2008 Drill.
Emergency Evacuation.
Southwest Florida Local Emergency Planning Committee COMMUNITY Sheltering-In-Place during a chemical incident.
Shelter-In-Place 4 th QTR HazMat Ops. You want me to what? Some kinds of chemical accidents or attacks may make going outdoors dangerous. Leaving the.
Building 90 BET Meeting S.Synarski 6/11/14. Agenda Reminder: Sign up for Lab Alert (2 min) October Drop, Cover, Hold, Evacuate Drill: Oct 16, 10:16am.
FLOOR WARDEN TRAINING Presented by State Risk Management 2011.
1 Chemical Hazards. 2 Purpose of Lectures on Chemical Safety To understand the hazardous properties of chemicals prior to their use. To transport / handle.
Fire Prevention and Safety Health Science Class. Rationale: Fires may occur at any time, as a result of overloading wiring, smoking, improper chemical.
The City of Roseville Emergency Operations & Evacuation Plan
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Sheltering in Place – External Chemical Spill Cass/Clay County Health Emergency Preparedness Coalition.
PERMIT REQUIRED CONFINED SPACES PERMIT REQUIRED CONFINED SPACES.
CHDCCS Business Service Center, Information Technology and Financial Planning Employee Safety Training March 29, 2002.
Drill of the Month Safety Officer’s Role March 2010 Maryland Fire and Rescue Institute.
Preparing Your Business for Emergencies: A Step-by-Step Guide.
EMERGENCY EVACUATION TRAINING
You need to have them in place, You hope you don’t need to use them.
Phone: Fax: Emergency Management: Fire Safety: 15 Edgewood Avenue Atlanta, Georgia website:
Employee Emergency Action Plans and Exit Routes Training Program.
Kanawha County’s Emergency Preparedness Plan. Planning is bringing the future into the present so you can do something about it now. Alan Lakein Time.
Healthy people/Healthy communities Disaster Planning and People with Disabilities.
Phone: Fax: Emergency Management Director: Fire Safety Officer: 15 Edgewood Avenue Atlanta,
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
A Major Business Disruption A Strategy for Minimising the Downtime Anthony Hegarty Mitigating Risks.
INTRODUCTION TO LAW, PUBLIC SAFETY, CORRECTIONS AND SECURITY.
Unit Objectives  Describe the types of hazards to which your community is vulnerable.  Describe the functions of CERTs.  Identify preparedness steps.
School Emergency Response Training. Unit 1: Objectives  Describe the types of hazards most likely to affect your home and community.  Identify steps.
Dr. Charles W. Beadling Central Asia Regional Health Security Conference April 2012 Garmisch-Partenkirchen, Germany.
OSHA Office of Training and Education1 Safety and Health Programs.
04-1 u Chapter 4 –Protective Actions Haz Mat Incident Considerations.
UNION MIDDLE SCHOOL EMERGENCY PROCEDURES. WHY DO WE TALK ABOUT EMERGENCY PROCEDURES? You need to know that we do everything we can to make sure that school.
Permit-Required Confined Space Safety
1 Confined Space Safety 2 Why Are Confined Spaces Dangerous? Hazards are not obvious Lack of ventilation Difficult for: –Employees to exit –Rescue teams.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
Hazardous Materials Business Plan Training Topic 2
PROTECTIVE ACTIONS AND REENTRY. Protective Actions Promptly and effectively implemented or recommended for implementation to minimize the consequences.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Safety in your Home and at School
Work LESSON 4: EMERGENCIES AT WORK. Emergencies What is an emergency? An emergency is any unplanned event that threatens employees, customers,
Writing an Emergency Operations Plan Why do we need to plan? Spring 2008.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
SITE EMERGENCY RESPONSE All sites are different. Different chemicals. Different configurations. Advance planning and training is necessary to protect worker.
Are you ready? Citizen Emergency Preparedness.  You are responsible for your own safety EVEN during an emergency.  You are expected to be self sufficient.
APPLIED SAFETY & HEALTH Samuel Nii Tettey (Ergonomist)
PUT A PLAN IN PLACE.  What should we do to prepare our trainee and their families or care providers?
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Fire Safety & Disaster Planning
North Central Florida Local Emergency Planning Committee
Occupational Radiation Protection during High Exposure Operations
Coordinating with Station Emergency Response Agencies
Disaster Preparedness
Chapter 9 Safety Permit Systems
North Central Florida Local Emergency Planning Committee
Presentation transcript:

Sheltering in buildings from toxic outdoor releases R. Carrié, R. Goyet, and D. Limoges CETE Lyon SETRIC workshop Mitigation : from experts to local authorities 30 June – 1 July 2005

A concern for local authorities Risk prevention Urban planning and city code Preparation to crisis Information to the public Take measures to provide shelter in buildings owned or managed by the local authority (ex. schools, daycare centres, office buildings, residences, etc.) Train the public (safety drills) Financial compensations (together with industry and state authority) Share experience with other local authorities concerned Crisis management Provide shelter in buildings owned or managed by the local authority Temporary transfer of personnel (ex. city police) After a crisis Learn lessons

Background Toxic release Chemical, biological, or radiological contaminants may be accidentally released outdoors near SEVESO industrial sites Outdoor concentration Determined from risk assessment For each contaminant, a perimeter is defined based on health effects

Objective of shelter-in-place To protect immediately people from outdoor toxic release for a short time => To maintain a breathable atmosphere in one interior room Can be active (ex. active pollutant filtration in mechanical systems) or passive (rely on building airtightness)

Effectiveness of shelter-in-place Examples : Pensacola, FL – 1977 –Amonia vapour release from railroad tank –2 deaths, 46 injuries –Breathable and survivable atmosphere was maintained in confined houses (residents were not harmed) Texas City, TX – 1987 –Hydrogen fluoride release –3000 people evacuated –500 treated for burns and respiratory problems –People who stayed in their homes were not injured Pittsburg, CA – 1998 –Chlorine release (400 kg) –7000 people sheltered in place –1 employee injured –No injuries offsite

The role of building airtightness

Accompanying measures To be efficient, shelter-in-place strategy must entail : Information and communication –Why and how to shelter-in-place Emergency warning systems and safety drills –Tests of warning systems –Safety drills Procedures during and after an emergency –Specific procedures (ex. open doors and windows) –Listen to the radio (France Bleue Régions)

Practical experience School canteen (Salaise sur Sanne, FR) Primary school (Jarrie, FR)

School canteen Principal characteristics 1200 m away from phosgene (carbonyl chloride) 1300 m away from amonia 1800 m away from methyl chloride Objective Provide shelter for 234 persons Means Identify rooms potentially used as shelters Conduct adaptive measures Control shelter airtightness Work undertaken Selection of school canteen as shelter among 3 candidates Verification of of airtightness of concrete structure Replacement of exterior doors Verification of ventilation, heating, and electricity systems Emergency shut-off and motorized fire valves Re-designing of pathways to shelter Emergency cabinet with tape, radio, safety flashlights, games, food, water) Airtightness : n 10 < 0.5 Vol/h at 10 Pa –Measured : 0.4 vol/h at 10 Pa Cost : 75 Euros / m 2 (2002) Commissionning : May 2002

School canteen

Procedure Emergency warning sirens Gathering of pupils in shelters Close airlocks Shut off ventilation system and fire valves Listen to the radio Manually tape joints Entertain pupils and wait for end of emergency End of emergency : open airlocks

Primary school Principal characteristics 250 m away from chlorine container Old buildings (1930) not adapted for sheltering Objective Provide shelter for 315 persons Means Specially-built shelters to protect both from over- pressure and toxic release Quality management during construction work Shelter characteristics 3 reinforced concrete shelters Supply-exhaust ventilation system, with emergency shut-off and motorized fire valves Airtightness : n10 < 0.4 Vol/h at 10 Pa –Measured : 0.05 to 0.18 vol/h at 10 Pa Sanitary equipment included Telephone link between shelters Can be used for gymnastics or library (little furniture) Commissioning : October 1994

Primary school Procedure Emergency warning sirens Gathering of pupils in shelters Close airlocks Shut off ventilation system and fire valves Listen to the radio Entertain pupils and wait for end of emergency End of emergency : open airlocks

The role of local authorities on measures to provide shelter Call for tenders Define requirements Require that a quality management procedure be implemented Select main contractor Construction work If relevant, conduct simulation of shelter-in-place before construction work The contractor : –proposes technical solutions –carries out the construction work according to the quality procedures Commissioning Third-party measurements Visual inspections

Conclusion Sheltering-in-place is an effective measure against outdoor toxic release If there are requirements on airtightness, quality management should be implemented The sheltering time cannot be too long Accompanying measures (ex. safety drills) are essential