1 Airspace Change Process & Airspace Trials in the context of Modernising UK Airspace Darren Rhodes Civil Aviation Authority.

Slides:



Advertisements
Similar presentations
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.
Advertisements

B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Air Traffic Management
UK Performance-based Navigation (PBN) Implementation Status
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Information Management The ICAO Perspective
A unique TOOLSET for ENVIRONMENTAL SUSTAINABILTY ASSESSMENT TESA Tous droits réservés ©net-aviation.com.
Continuous Climb Operations (CCO) Saulo Da Silva
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
PBN Plan Development Aviation Industry Forum 18 November 2009.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
6th Framework Programme Thematic Priority Aeronautics and Space.
PBN Airspace Concept Process
Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.
17 January 2014 United Kingdom Future Airspace Strategy FAS VFR Implementation Group Launch Meeting Phil Roberts – SARG Hd AAA.
SESAR Single European Sky Air traffic management Research
FASVIG Introductory Meeting
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
AOA Ops and Safety Conference John Dow FAS Implementation Lead Airspace Regulation 22 June 2015.
NEW FLIGHT PATHS AND STANSTED SECOND RUNWAY PRESENTATION TO STANSTEAD ABBOTTS PARISH COUNCIL 17 JULY 2008.
NEW FLIGHT PATHS AND STANSTED SECOND RUNWAY PRESENTATION TO GREAT SAMPFORD PARISH COUNCIL 18 SEPTEMBER 2008.
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
NATS TCN AIRSPACE PROPOSALS + SECOND RUNWAY PRESENTATION TO STAPLEFORD ABBOTTS PARISH COUNCIL 7 JULY 2008.
Dublin Airport Stakeholders Forum 26 th November 2008 Irish Aviation Authority Dermot Mc Mahon.
Farnborough Airspace Change Proposal Briefing to FACC 26 th November 2014 TAG Farnborough Airport.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Future Airspace Strategy Brief Strategic Aviation Special Interest Group - SASIG 26 November 2010.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
NATS TCN AIRSPACE PROPOSALS PRESENTATION TO HELIONS BUMPSTEAD PARISH COUNCIL 24 APRIL 2008.
Farnborough Airspace Change Proposal Briefing to FACC 6 th March 2014 TAG Farnborough Airport.
Philip Graham Head of Secretariat Airports Commission June 2014.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 Future Airspace Strategy: Briefing to the DfT European ATM Stakeholder Forum 19 October 2010.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Sustainable Aviation: Cleaner, Quieter, Smarter
Airspace Update Gatwick Airport Airspace Seminar 2016 Charles Kirwan-Taylor Director of Corporate Affairs and Sustainability 1 Tuesday, 10 May 2016.
Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016.
UK Performance-based Navigation (PBN) Implementation Status
Workshop on preparations for ANConf/12 − ASBU methodology
PlaneWrong AGM Thursday 13th October
Operational Assessment of Service Delivery
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Airspace Change Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Delivering NATS ATM CO2 Targets
Performance Based Navigation at London Stansted
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Innovation for Regional Integration
National Airspace and Noise Policy
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV and RNP Strategy in Japan
Exit Capacity Substitution and Revision
Presentation transcript:

1 Airspace Change Process & Airspace Trials in the context of Modernising UK Airspace Darren Rhodes Civil Aviation Authority

2 How the airspace looks today Major Airport 2 nd Tier Airport Heathrow Hold

3 All other flights Heathrow Gatwick Luton Stansted London City British airspace Belgian airspace Dutch airspace French airspace How airspace looks today (2)

4 Airspace Designed For A Different Era  Yesterday  Today

5 UK Airspace Requires Modernisation  Deal with current hotspots of congestion  Enable and facilitate continuous improvement in safety  Implement Single European Sky (SES) and International requirements  Take advantage of technological developments to improve efficiency  Be responsive to Government policy and decision-making (references in 2003 Air Transport White Paper, Transport Select Committee Report into Airspace, the Aviation Policy Framework and the Davies Commission Interim Report)  Respond to the DfT Environmental Guidance and deliver environmental benefits  Provide flexibility within the system to enable future development and advancements

6 Purpose of the Future Airspace Strategy  The strategic drivers for FAS are: SAFETY, CAPACITY and the ENVIRONMENT  FAS is a strategic framework that will pull together a complex and diverse set of policy and regulatory issues that will enable balanced judgements to be made that are properly underpinned by cohesive and cogent policy formulation  This will, in turn, enable air navigation service providers (such as NATS) to create an airspace structure that is fit for the future, effective, efficient and ensures that the UK meets any international obligations that are placed upon it  There are environmental benefits that can be delivered but this needs some change to happen  It is not a detailed implementation plan, although such plans will be driven by the outcome of the FAS work  The Strategy sets the direction of travel – industry will have to deliver it within the context of the regulatory framework

7 Performance Based Navigation (PBN)  A key enabler that allows us to define routes differently and not to be reliant on fixed, ground-based navigation aids (VORs, NDBs, etc).  Aircraft Flight Management System (FMS) capable of flying the aircraft very accurately along these routes in a wide range of weather (wind) conditions.  Good for concentration  Could be good for dispersion/relief but there are not an unlimited set of options.  Allows us to modernise the airspace through systemisation – removes need for ATC intervention (radar vectors) which in turn has SAFETY and CAPACITY benefits.  PBN enables us to design-in Continuous Climb profiles (4-D tunnels in the sky)  Focus on better climb and descent profiles has ENVIRONMENTAL benefits  BUT……  Concentration can create noise canyons  Not an unlimited set of route options (waypoint capacity and safety (confusion) aspects)  Not all aircraft capable to the same PBN standard (RNAV5, RNAV1, RNP 0.3, etc)

8 Gatwick  conventional navigation tracks 14 Nov – 10 Dec 2014

9 Gatwick  RNAV departures 14 Nov -10 Dec 2014

10 RNAV – Fixed Radius Turn

11 Current Environmental Guidance  Based on the Aviation Policy Framework (APF) and the Environmental Guidance to the CAA consulted upon by the DfT in 2013 and published in January  Requires airspace designers to have regard for the following altitude-based priorities:  Above 7000’ AMSL focus on CO2 emissions.  4000’-7000’ – focus on noise & CO2 emissions.  Below 4000’ – focus should be noise.  Daytime noise 16hr Leq  Night time SEL noise footprints  Current policy is on concentration and not dispersion of aircraft.  Where possible major concentrations of people should not be over-flown.  Requires the CAA to have regard to AONBs and National Parks but does not preclude their over-flight (where it is impracticable to do otherwise or where as a consequence you might not achieve the preceding requirements).  Recognises the operational benefits of Continuous Descent and Continuous Climb profiles.  Specific procedures for Noise Designated Airports (LHR, STN, LGW)

12 Airspace Trials  What are they?  temporary, with a defined end date. Approved by the CAA on safety and operational grounds.  Why are they used?  designed to validate proposals for new routes, the use of new technologies or operating procedures  to develop the evidence base in relation to their impact on the environment  provide a valuable contribution to the efficiency and effectiveness of the UK airspace network  key component of the successful implementation of the Future Airspace Strategy

13 Airspace trials consultation/engagement arrangements  Because trials are short term or temporary by their nature:  Usually not be necessary or appropriate for the airspace change sponsor to consult on their proposals or to undertake the airspace change approval process  Impact of the proposed change on the environment should be considered by the sponsor prior to implementation and this information used to help the CAA to determine what level of consultation/engagement is required by the trial sponsor

14 What Has Happened & When?  Gatwick  RNAV departures ACP  Consultation conducted 19 July 2012 to 19 October 2012 (responses by 12 Nov)  Airspace Change Decision published 14 August 2013  Introduced 14 November 2013  Post Implementation Review has begun, to be completed as soon as practicable.  Trials  ADNID departure trial started at Gatwick on 17 February 2014 – finished on 8 August 2014  Gather data on ability to create bigger angular separation between successive departures to the south-west of Gatwick on westerly runway.

15 What Has Happened & When? (2)  Gatwick (continued)  ACP consultation  NATS’ Consultation on London Airspace Management Plan (LAMP) Phase 1a (15 October January 2014 – included Gatwick local area details below 4000ft)  Gatwick Airport LAMP Phase 1a Local Area Consultation (23 May August 2014)  Decision not to go ahead with Gatwick area proposals until later in the LAMP programme. (Decision taken September 2014)  2nd runway  Gatwick’s consultation on 2nd Runway 4 April – 16 May 2014

16 What Has Happened & When? (3)  Heathrow  Rolling programme of departure trials affecting routes to the south-west and south-east of Heathrow commenced 16 December  westerly DOKEN and easterly MIDHURST trial 16 December 2013 to 15 June 2014  test use of PBN on a single departure route  easterly trial Phase 2 28 July to 26 January Suspended 12 November  to assess the impacts of multiple routes using precision based navigation  westerly trial Phase 2, 25 Aug 2015 to 26 Jan Suspended 12 November  testing of departure routes and respite  easterly trial Phase 3, Feb 2015 to Aug Postponed  to test advanced airspace design based on learning from previous departure trials.  westerly trial Phase 3, Mar 2015 to Sep Postponed  to test advanced airspace design based on learning from previous departure trials.

17 Thank You Questions