AUTOMATIC RAILWAY GATE CONTROL SYSTEM

Slides:



Advertisements
Similar presentations
WELCOME.
Advertisements

M3 - 1 The Road to Skilled Driving April 2006 Chapter 2 Signs, Signals and Roadway Markings.
Delivering Engineered Solutions Optonator ® the fibre optic railway “detonator” (Once started the PowerPoint show will advance the slides automatically.
Chapter 7 Negotiating Intersections
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
Collision Mitigation break system (CMS) What is CMS? How it works System Configuration Warning Devices Collision Avoidance Maneuvers Conclusions.
Automated train station. Introduction My project is about a automated railway system.The basic idea is to use the Grove kit to determine the time,to play.
Innovative Safety Initiative Award 2013 Jointly Organized by DEVB, CIC and HKCA CHUN WO-CRGL-MBEC JOINT VENTURE Contract No. HY/2009/19 Central- Wan Chai.
Understanding the Virginia Driver’s Manual
EX-1 Intersections & Interchanges Improved Traffic Signal Control Ramp metering Intersection Collision Avoidance Systems Automated Enforcement.
I see you… INTELLIGENT TRANSPORTATION SYSTEMS AS A MEANS OF AUTOMATIC ROAD ENFORCEMENT BY: KEVIN NICOLI.
Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre.
Indian Institute of Technology Hyderabad REMOVEDOR DE OBSTACULOS Anuj Arora Chinmay Jindal Shubham Kaushik.
Automatic Gate system for Railways
Office of Traffic, Safety and Technology Chapter 9 New Technologies Traffic Signs 101 November 20, 2014.
Software Safety: Examples, Definitions, Standards, Techniques Tom Hobson (tdh06u)
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
Future Road Map – Modern Control, Command Signalling Systems BY Anshul Gupta DRM, Adra, South Eastern Railway Secretary, Institution of Railway Signal.
Smart Car This project provides smart car assistance to the driver in taking smart and fast decision to avoid any accidental situations during driving.
By Anthony Moody Rhys Porter Nicolas Wilson.  Background  Objectives  Design  Normal Operation  Logic  Failure  Issues and solutions  Improvements.
Driver’s Education Chapter 7 Negotiating Intersections 12/11/12 What do you think the difference is between a controlled and uncontrolled intersection?
Graphic Equalizer Table Top View
IHRA-ITS UN-ECE WP.29 ITS Informal Group Geneva, March, 2011 Design Principles for Advanced Driver Assistance Systems: Keeping Drivers In-the-Loop Transmitted.
Autonomous Brake Light Communication Phil Osteen Robot Name: Traffic Flobot EML 5666C, IMDL November 25, 2008.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
ROLE OF SIGNALLING IN RAILWAYS
AUTOMATIC RAILWAY GATE CONTROLLING AND TRACK SWITCHING
WHO HAS THE RIGHT-OF-WAY? Definition of right-of-way The right of one roadway user to go first or to cross in front of another; right-of-way must be.
Robocon 2007, Hong Kong University of Science & Technology Robocon 2007 Electronics Quickstart! Session 1 Hello! Microcontroller. Prepared by KI Chi Keung.
SUBMITTED BY LENIN C INTRODUCTION Railways - cheapest mode of transportation. Aims to avoid accidents. Using simple electronic components- automate.
Understanding the Virginia Driver’s Manual
Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre.
Lesson- 13– Road Safety Rules.
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
Learning from incidents: Ufton LC Near Miss ES LXA PICOP.
1. 2 The electrocardiograph (ECG) is an instrument, which records the electrical activity of the heart. Electrical signal from the heart characteristically.
Communication Based Projects Ideas for Engineering Students.
CE2303 Railway Engineering
S0LAR AUTOMATIC RAILWAY TRACK CRACK DETECTING VEHICLE
Bullfighting Autonomous Robot “BULL” IMDL Spring 2010 Aminatu Oyebanjo April 8, 2010.
Automatic Railway Gate Control System
Brian Kary Freeway Operations Engineer. Active Traffic Management.
Fire Fighting Robotic Vehicle. Introduction:  It is designed to develop a fire fighting robot using RF technology for remote.
Vehicle Management System Adopted successfully with I.D., wireless Vehicle Management Systems (VMS) for Parking, Residential Societies.
Output and Actuator Output: Any signal or information, digital or analog that has been decided in a system by a systematic processing way is known as.
CRUISE CONTROL DEVICES Presented by Anju.J.S. CRUISE CONTROL DEVICES.
Under the Guidance :- Mr.B. Suresh Babu (M.Tech) ELECTRONICS AND COMMUNICATION ENGINEERING Project Batch:- 18 D. Siva Sumanth (060429) K. N. V. Subrahmanyam.
Submitted By:.  Smart room is used mainly to reduce human efforts  Its also help to reduce the unnecessary power losses  Number of people in the hall.
WATER LEVEL INDICATOR AND AUTOMATIC MOTOR SWITCHING SYSTEM
TThe main purpose of this project is to provide cost effective safety measure at level cross TThis project is a part of complete system for monitoring.
SMART HOME SYSTEM. Group Members Shakib Muazzam (CSE) Jamil Arifin (EEE) Azima Islam Fariha (CSE) Abed Al Shihab
Railway Level Crossing Gate Operation Remotely by Android.
Montana Driver Education and Training Traffic Control Devices and
ANTI-COLLISON AND BRAKING SYSTEM
PRESENTED BY: SHAHIN HUSSAN
Virginia Driver Responsibilities: Licensing Responsibilities
Autonomous CAR.
Smart Car Robot Prepared by Supervised by Mai Asem Abushamma
Design and Control of an LED-based Intelligent Lamp using Microcontroller Presenters: Taslim Ahmed ( ) Samar Chowdhury ( ) Khokan Das ( )
Automatic Railway Gate Control System
Informal Document: ACSF Rev.1
INTELLIGENT ENERGY SAVING SYSTEM USING PIC MICROCONTROLLER
Automatic Emergency Braking Systems (AEBS)
Automation & Security Pvt. Ltd.
Signs, Signals and Roadway Markings
Signs, Signals, and Roadway Markings
Lesson Plan Day 4 >Chapter 7- Power Point > Driver’s education notes: Steering straight backward, Changing lanes, Hand over hand steering, Push Pull steering,
Flagging This presentation was prepared by Rich Lobdell for High Plains Power. The information herein is not intended to be complete in all aspects.
KEYLESS ENTRY PUSH TO START BACK UP CAMERA.
Informal Document: ACSF-10-08
Presentation transcript:

AUTOMATIC RAILWAY GATE CONTROL SYSTEM

Project Synopsis: Railway safety is a crucial aspect of rail operation system worldwide. The purpose of our project is to design an AUTOMATIC RAIL CROSSING SYSTEM. This system is capable of closing the gate/barrier when a train is going to cross the road and the system will be restored to its initial condition after the train leaves. Thus it saves time and man power and reduces the chance of error.

Railroad Crossing Through Ages: Previously, no gate or barrier was used at rail crossings. After some period, flagmen were posted to rail crossings to warn the traffic about the incoming train. Generally they used flag or lamp to do their job. Later manually controlled barricades were introduced. The gates were intended to be a complete barrier against intrusion of any road traffic on the railway.

Disadvantages Of Manual Rail Crossing: Manual rail crossings need a lot of man power to do the job of signaling and operating the barrier. So manual rail crossing is not cost efficient. Most of the time this procedure is not time efficient. Often train arrives a long time after the gate has been closed. Manual system is erroneous, and can cause severe damage which may worth a heavy loss of life and capital.

Automatic rail crossing: To avoid human error and to enhance efficiency, railway crossing system can be controlled in an automated manner. In an automatic rail crossing system a train which approaches the gate is detected by a sensor, and also the speed of the train is noted. Then the time taken by the train to reach the road is calculated and the gate/barrier is closed down accordingly. Also the departure of the train is detected by another sensor and the gate/barrier is restored to its initial position.

Now we are going to present our automatic rail crossing system

Equipments: Microcontroller Unit ATMEGA16 LM324 OPAMP An LCD Display LEDs AND Light Dependent Resistors(LDR) LM324 OPAMP DC Stepper Motor (5 wire unipolar type) ULN2003A (motor driver) Resistances for proper biasing, control and safety measure An LCD Display

Equipments: Microcontroller Unit ATMEGA16 LEDs AND Light Dependent Resistors(LDR) LM324 OP-AMP DC Stepper Gear Motor (5 wire unipolar type) ULN2003A (motor driver) Resistances for proper biasing, control and safety measure An LCD Display

Algorithm: Train Sensed Micro controller Barrier Closed Departure Sensed Micro controller Barrier Opened

FEATURES OF THE SYSTEM: Automatic Train Sensing Traffic Signal Control Warning Buzzer Obstacle Detection Gate Malfunction Detection Auto Communication With Train

BLOCK DIAGRAM

METHOD OF TRAIN DETECTION : Train approaching sensor Train detected by LDR

Gate Control: No Train Green Signal On

Gate Control: Train Detected Yellow Signal On

Gate Control: Train Approached Red Signal On

Signals Sent to The Train: When there is no crossing ahead. When the train is approaching a rail gate When train crosses a rail gate

Signals Sent to The Train: If an obstacle is detected on the line after the gate is closed In case of a gate failure

Limitations Light Sensors were used. No wireless communication with train is done in this project.

Future Improvements Backup motor system can be added. Automatic train deceleration. Effective wireless communication.

THANK YOU Prepared by Md. Asif jahangir chowdhury (0606047) Md. Rifat alam (0606052) Tanjil amin (0606053) Shahriar jalal nibir (0606059)