Petal needs in B180 ● Petal schedule is far behind stave schedule ● Most likely no full Petal before production starts ● We may want to test smaller structures.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

1 Liverpool Production Status Week of 23 February 2007.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Lesson 7: The Voting Process. Opening Discussion Have you ever voted for something before? How was the winner decided? Did you think the process was fair?
DIAMOND ACTIVITIES DESY Zeuthen Wolfgang Lange. MOTIVATION and PEOPLE: Calorimetry in an environment with high radiation doses (TESLA beam cal) Beam diagnostics.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Y. Unno, 2007/2/26 sLHC sensor R&D Module Plans (Nobu) Manufacturing plans, including financing (Nobu) Sensor Specs (Nobu)
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Prototype sector Ian Wilmut Dec What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Irradiations/ Birmingham Status Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting 16/01/141.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz PXD support (IFIC - Valencia) 26/7/2011.
Astroparticle Physics at DESY IceCube CTA Recommendations.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
Panja Luukka1 Silicon beam telescope for CMS SLHC detector studies (SiBT Panja Luukka, Sandor Czellar, Jaakko Härkönen, Eija Tuominen, Jorma.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz 8 th International Workshop on DEPFET Detectors and applications.
Estimated schedule, costs and number of ABC130 needed Tony Affolder.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
ATLAS-UK Tracker Upgrade OverviewR.Nickerson Programme StatusI.Wilmut [hat 2] WP2Peter Phillips WP3Bart Hommels WP4Tim Jones WP5Craig Buttar [hat 3] B180Todd.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Electrical Measurements on stave S4028 Claudia, Fabrizio, Illona After loading, we have done a quick test (RECV) using a single module setup (MAC-based)
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
VELO Replacement Girish Patel University of Liverpool.
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Introduction: Meeting schedule, AUW agenda, etc
PIXEL CAEN Installation Status
Micromegas Vertex Tracker Status Report
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Database requirements from ITk-Strips for DAQ loads
LOI Backup Document: R&D
Work packages status in Torino and perspectives
A Long Term Study of Charge Multiplication
Design and fabrication of Endcap prototype sensors (petalet)
ROD assembly and test in US
EUDET Extended SC meeting 31 August 2009
Presentation transcript:

Petal needs in B180 ● Petal schedule is far behind stave schedule ● Most likely no full Petal before production starts ● We may want to test smaller structures addressing Petal specific issues, eg Petalino 8.60 cm 8.07 cm Use 4” wafers. Eventually use real size sensors (either wedge or barrel- type) Carlos Lacasta & Uli Parzefall

Petal needs in B180 ● The small object we will make (now dubbed Petalino) won't be ready before fall of 2011 ● Full size wedges will not be ready before 2012 ● We would be interested, however, on a small corner with access to a DAQ setup for running the Petalino ● Dark box ● HSIO access ● Cooling (chiller with circulating anti-freeze, access to Nitrogen ) ● Thermo-Mechanical tests are being done in IFIC-Valencia, NIKHEF and DESY ● If fancy equipment available, a disk (or disk sector) mock-up would be interesting but it would require 64 dummy petals.... Carlos Lacasta & Uli Parzefall

Forward Efforts relevant to B180 ● Some groups (DESY, Freiburg, NN) will build a limited number of barrel modules ● Have bought sensors ● Receive hybrids from Liverpool ● Original motivation is to gain experience ● These modules will be contributed to the STAVE 09 programme Carlos Lacasta & Uli Parzefall

Manpower Contribution from Forward Groups ● Poll for contributing effort was made after last EC sensor meeting ● Received the expected contributions listed below ● NB: for the analysis students involved this is meant to be service work (class 3 OTP), and it should be recognised as such ● DESY (Zeuthen): ● PhD student from April 2011 for 3+3 months, 0.8 FTE (Conrad Friedrich) ● Berlin (Humboldt), works closely with DESY-Zeuthen: ● Postdoc June-July 2011 with 0.5 FTE (Malik Aliev) ● Freiburg ● PhD student from about now for 6months 0.3 FTE (Liv Wiik) Carlos Lacasta & Uli Parzefall