1 David Santoyo Petal meeting: 24 October 2014 Petal vs Services: design concerns.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
1 David Santoyo Petal Locking Points: AUW Nov 2014 Petal Locking Points.
N. Dhanaraj, Y. Orlov, R. Wands Thermal-Stress Analysis of CC1 Space Frame.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
A discussion paper for the Absorber Review pre-meeting on February 11 th 2003 On 3-D Fluid Flow calculations on the 22cm Absorber Window By Stephanie Yang.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Mounting Direction Water Cooler Best solution OK Risk of air bubbles in the system Heatsink Water channels Inlet Outlet.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
1 FEA of Towers for Dome C JL Dournaux / JPh Amans GEPI, Pôle Instrumental - Paris Observatory
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
HCCB TBM Mechanical Design R. Hunt, A. Ying, M. Abdou Fusion Science & Technology Center University of California Los Angeles May 11, 2006 Presented by.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
E. Da Riva/M. Gomez Marzoa1 WG4 Meeting - 27th June 2012 Air Cooling by means of carbon fiber structure Enrico DA RIVA (EN-CV-PJ) Manuel GOMEZ MARZOA (EN-CV-PJ)
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
What is Stave Carrier Frame Required to Do?
STRAW TRACKER SYSTEM CAD STATUS :
SHARE POINT 27/07/2016.
Update of MVD services and requests
Hcal Geometry and Assembly
Strip Petals: Local supports and prototype tests
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
? ENDCAP: Mechanics IFIC-Valencia.
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
WP9 ITS Mechanics and Cooling
C.Clerc ILD session, ALCPG /03/2010
Integration issues at IHEP
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
IFR detector mechanics
WG4 – Progress report R. Santoro and A. Tauro.
Hybrid Mechanical/Thermal Design ideas
SIT AND FTD DESIGN FOR ILD
Presentation transcript:

1 David Santoyo Petal meeting: 24 October 2014 Petal vs Services: design concerns

2 David Santoyo Petal meeting: 24 October 2014 Petal vs services From Afroditi (Nikheff) conclusions… (Itk General meeting sept-14) The current tube diameter seems not optimum… -“If tube diameter can’t be reduced because of welding concerns…” -“Other possibilities: put 2 (or more) petals in series and use same diameter tube as SS staves - double the flow can lift you out of the Stratified-Wavy flow regime…” It would be good also to understand… …how does affect to these simulations; the tube diameter and length for the service tray inlet pipes, capillaries and outlet pipes?…

3 David Santoyo Petal meeting: 24 October 2014 How does affect services to petals and vice versa? If for example, petals are cooled down in series, inlet and outlet pipes in service trays are reduced to half. This fact leads to two options: -x16 service trays serving 14 petals -Reduces service tray complexity and size comparing to previous designs… -Service trays close to horizontals could be rotated loosing symmetry… -Petals are inserted in angle with respect the disk plane… -Petals are not allowed having one EoP on each side… (…not space for petal insertion…) -x8 service trays serving 28 petals -Increases service tray complexity and size comparing to previous designs… -Allows not having services trays on the horizontal line… -Although the size of service tray increases as the number is reduced the space available for petal insertion increases. Petals are inserted in parallel to disks… -Petals could have one EoP on each side

4 David Santoyo Petal meeting: 24 October 2014 Service tray x8 Each x8 version service tray serves 28 petals increasing size and complexity respect the version x16 Cables preferred to be below tubes for reparability

5 David Santoyo Petal meeting: 24 October 2014 Service tray x16 Cables preferred to be below tubes for reparability Each x8 version service tray serves 14 petals

6 David Santoyo Petal meeting: 24 October 2014 Service tray x8 x8 service tray distribution This solution avoids having services on the horizontal (along the rails)

7 David Santoyo Petal meeting: 24 October 2014 Service tray x8 Space available to insert petals increases Petals are inserted parallel to disk plane

8 David Santoyo Petal meeting: 24 October 2014 How does the x8 version for service tray work? Petals connected in series on both sides of the service tray By removing every second service module, the space for petal insertion is increased

9 David Santoyo Petal meeting: 24 October 2014 Service tray x16 Rotation to avoid having services behind BH supports and routing funny pipe shapes Looses symmetry

10 David Santoyo Petal meeting: 24 October 2014 Pipe routing close to rails (x16 version) Problem routing pipes to petals close to rails All petals have same flavour All service trays have same flavour 16 in total

11 David Santoyo Petal meeting: 24 October 2014 Pipe routing close to rails (x16 version) Possible solution to route pipes to petals close to rails All petals have same flavour 12 service trays (single) + 2 service trays (double)

12 David Santoyo Petal meeting: 24 October 2014 Service tray x16 Space available to insert petals decreases Petals are inserted in angle with respect to disk plane

13 David Santoyo Petal meeting: 24 October 2014 Service tray x16 If petals must be inserted in angle the local supports should be adapted for that constrain

14 David Santoyo Petal meeting: 24 October 2014 FEA global structure: adding Si modules -Si wafers -0.3 mm g/cc -7 GPa -Thermal glue -0.2 mm g/cc GPa It’s been added the Silicone modules to the petals to check out how much they affect to the EC structure behaviour Petal local supports being studied

15 David Santoyo Petal meeting: 24 October 2014 EC Finite Element Model

16 David Santoyo Petal meeting: 24 October st CASE2nd CASE3rd CASE Max. VM structure2,34MPa4,25MPa5,29MPa7,43MPa5,54MPa8,1MPa Max. VM Petal2,1MPa4,03MPa5,15MPa7,26MPa5,4MPa7,92MPa Max. VM Blade1,92MPa2,62MPa1,98MPa2,05MPa1,65MPa1,37MPa Max. DX STATIC12,9um9,93um14um12,5um13,9um12um Max. DY STATIC19,5um16,5um23,8um22,7um23,1um21,1um Max. DZ STATIC3,17um2,64um4,4um4,08um3,85um5,08um 1st Frecuency Mode22,163Hz22,632Hz21,834Hz22,317Hz21,957Hz22,397Hz Max. DX PSD 3σ7,32um6,75um8,07um7.95um7,95um7,65um Max. DY PSD 3σ5,52um5,04um5,85um5.76um5,76um5,58um Max. DZ PSD 3σ9,45um8,43um9,75um8.58um9,78um8,55um How does affect Si wafers for EC structure analysis? PSD analysis

17 David Santoyo Petal meeting: 24 October 2014 Conclusions Services affect to petal design:  Insertion and assembly procedure  Local supports and constraints  Petal layout and EoPs Services affect to EC structure:  Thermal and humidity interfaces  Interaction with BH and supports  Structure stability It would be important to focus and also take some decisions as a group on the cooling system and services due to its implication in the overall design

18 David Santoyo Petal meeting: 24 October 2014 Backup

19 David Santoyo Petal meeting: 24 October 2014 FEM ENDCAP

20 David Santoyo Petal meeting: 24 October 2014 FEM ENDCAP

21 David Santoyo Petal meeting: 24 October 2014 FEM ENDCAP

22 David Santoyo Petal meeting: 24 October 2014 FEM ENDCAP