1. PROJECT GOAL Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure.

Slides:



Advertisements
Similar presentations
What does REMI say? sm Introduction to The Next Generation of Policy Insight.
Advertisements

For Missouri Commission PLEXOS Q&A for Missouri Commission.
Companies can suffer numerous problems due to poor management of resources and careless decisions. In real-world decision- making, many organizations lack.
CS511 - Spring 2006 Final Presentation Project 3 - Team 1 Ching Chang Panagiotis Papapetrou Raymond Sweha.
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
Marakas: Decision Support Systems, 2nd Edition © 2003, Prentice-Hall Chapter Chapter 1: Introduction to Decision Support Systems Decision Support.
Abstract The University Class Scheduler (U.C.S) is an innovative scheduling tool. It is intended to be used by major Universities to schedule classes into.
Major Exam II Reschedule 5:30 – 7:30 pm in Tue Dec 5 th.
Lecture 10 Comparison and Evaluation of Alternative System Designs.
1 Case Study: Starting the Student Registration System Chapter 3.
Southern Connecticut State University Exit Survey Eduardo Robalino Sponsor Klaus Peters.
Computer Skills Preparatory Year Presented by: L.Obead Alhadreti.
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
Figure 1 Personal Efforts Estimated Resources Financial Budget and Other Resources Table 1 Project Requirements Design Objective Concise, non-intimidating,
4/24/2007Iowa State University Program to Evaluate Alternative Energy Sources EE / CprE 492 May Team Members Christina Erickson Daniel Harkness Matt.
Research on cloud computing application in the peer-to-peer based video-on-demand systems Speaker : 吳靖緯 MA0G rd International Workshop.
Centre for Earth Systems Engineering Research Infrastructure Transitions Research Consortium (ITRC) David Alderson & Stuart Barr What is the aim of ITRC?
Table-Driven Acceptance Testing Mario Aquino Principal Software Engineer Object Computing, Inc.
WorkPlace Pro Utilities.
Computer-Based Trading Room Dec04-05 Client: ISU College of Business Advisor: Dr. Gerald B. Sheblé Team Members Steve Saillard Vipul Tiwari Dan Fitch Fahim.
Team 1 Jesus Weibo Mina Yunming. Client’s Needs  Short term, medium term, long term plans  Simulation of energy system to provide affordable future.
Reporting and Build Statistics Using Business Intelligence By Naga Sowjanya Karumuri Build Team, VMware, Cambridge Summer Internship 2008.
CPS120: Introduction to Computer Science The World Wide Web Nell Dale John Lewis.
Tutorial 10 Adding Spry Elements and Database Functionality Dreamweaver CS3 Tutorial 101.
Operating Room Instrument Rapid Delivery System sddec11-03 Group Members: Charles Ristau (Group Manager) Yik Sen Tan (Webpage Designer) Tariq Azmy (Secretary)
April 24, 2007 Nihat Cubukcu Utilization of Numerical Weather Forecast in Energy Sector.
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
Course Presentation EEL5881, Fall, 2003 Project: Network Reliability Tests Project: Network Reliability Tests Team: Gladiator Team: Gladiator Shuxin Li.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review SubTask CH TD Day-ahead Scheduling and Real-time Operations Tool Conventional.
Pump Controller Team Number: May06-12 Team Members Dwayne Stammer CprE Francois Munyakazi EE Dan Paulsen CprE/EE Faculity Advisor Nicola Elia Client Viking.
Microsoft FrontPage 2003 Illustrated Complete Using Office Components.
VISUAL STUDIO 2010 TEAM SYSTEM CAPABILITIES WITH DYNAMICS AX Advisor - Simanta Mitra Client - Shawn Hanson & Dave Froslie (Microsoft) Group - Dec10-08.
M ODELING THE E NERGY I NFRASTRUCTURE FOR THE S TATE OF I OWA DEC09-02 Mubarak Abbas (E E) Austin Lyons (E E) Muhammad Rahim (E E) Mohammed Ahmed (E E)
Problem Statement The energy and transportation demands continue to rise across the state of Iowa. An investment plan will need to be created for the.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Campus Locator – Cell Phone Interface (May06-05) Dr. John Lamont Prof. Ralph Patterson III Faculty Advisors Iowa State University Senior Design Client.
Data dissemination – UK experiences Iain MacLeay, Head of Energy Balances, Prices and Publications Department of Energy and Climate Change United Kingdom.
Selected Topics in Software Engineering - Distributed Software Development.
Problem Statement: Users can get too busy at work or at home to check the current weather condition for sever weather. Many of the free weather software.
CERN - IT Department CH-1211 Genève 23 Switzerland t DB Development Tools Benthic SQL Developer Application Express WLCG Service Reliability.
DATA, SITE AND RESOURCE MANAGEMENT SOFTWARE. A Windows application software designed for use with Stylitis data loggers. EMMETRON consolidates resources,
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
Syllabus Management System. The Problem There is need for a management system for syllabi that: Provides a simple and effective user interface Allows.
Systems Analysis and Design in a Changing World, Fourth Edition
Ashley Montebello – CprE Katie Githens – SE Wayne Rowcliffe – SE Advisor/Client: Akhilesh Tyagi.
When buying a product in today’s marketplace, an individual is faced with the challenge of remembering an abundance of information about the product that.
Expert System Job Offer Evaluation Software May Abstract The project’s focus is to decide what criteria should be used to determine which job offer.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Using GIS to Find Suitable Locations for Solar Power Plants Submitted By: Scott Peterson May 12, 2005 Texas A&M University Department of Civil Engineering.
Software Requirements: A More Rigorous Look 1. Features and Use Cases at a High Level of Abstraction  Helps to better understand the main characteristics.
The Canadian Approach To Compiling Emission Projections Marc Deslauriers Environment Canada Pollution Data Division Science and Technology Branch Projections.
Greater Des Moines Energy Center Combined Cycle Plant Diagram of a Combined Cycle Generator Abstract Combined-cycle generating units are being incorporated.
A.M.E.N. Autonomous Meteorological Embedded Network for Fire Fighting Fan Zhang, Dmitry Stomakhin, Flavio Sira, Brian Hansen.
OPERATING SYSTEMS CS 3530 Summer 2014 Systems and Models Chapter 03.
D R A T D R A T ABSTRACT Every semester each department at Iowa State University has to assign its faculty members and teaching assistants (TAs) to the.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Abstract Due to a change in demand, high voltage transmission circuits can become overloaded. Overloads are resolved by the dispatch of power based on.
1. Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure.
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
In today’s world of ever-increasing energy prices and environmental concerns, alternative energy sources are constantly being researched. This project.
ASP.NET Forms.
ANDROID APP FOR HIVETRACKS.COM SERVICE
Software Support Framework
Staff Scheduling at USPS Mail Processing & Distribution Centers
Tutorial 8 Objectives Continue presenting methods to import data into Access, export data from Access, link applications with data stored in Access, and.
Resources and Schedule
Presentation transcript:

1

PROJECT GOAL Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure. The website interaction will be simple and easy to use for the general public, but the implementation and results will give detailed and accurate investment planning for the next 40 years. 2

ALTERNATIVE ANALYSIS SOFTWARE  Electric Sector o NEMS o MARKAL/TIMES  Transportation Sector o CARVER2 o TRAGIS 3

MARKET SURVEY  Investment Planning for State of Iowa for Next Forty Years  Demonstrates Interdependency of Transportation and Electric Generation Sectors  Utilizes Analysis Software Available Only at Iowa State University 4

FUNCTIONAL REQUIREMENTS  Obtaining Data o Energy generation o Consumption o Transportation  Visualization of the Data o Publicly shown on our website o Gives visualization of current energy and transportation infrastructure 5

FUNCTIONAL REQUIREMENTS  Visualization of the Data cont. o Will extend the previous groups data o Shown on Iowa map with colored lines, coordinate locations, and pop out information for each point of interest  Future Analysis o Creates a long term infrastructure plan for the state of Iowa o Uses past and current information including predicted trends. o Shows a 40 year plan with constraints and input variables specified by the user 6

NON-FUNCTIONAL REQUIREMENTS  Budget limitation o All data collection efforts are limited by a $12,050 budget  Must be usable on any computer for a user of any skill level o This is done by simple input specifications the user can manipulate 7

INPUT FILE DESCRIPTION  Electric Generation o Coal, Natural Gas, Nuclear, Hydro, Solar, Wind etc.  Electric Transmission o 115KV, 161KV, 230KV, and 345KV  Transportation o Passenger, Commodity, Railroad, River 8

FILE LIST  NETPLAN files include o Capacity o Node List o Emissions o Life Span o Investment Costs o Arc List o Fuel Type 9

ELECTRIC GENERATION  Generation sites of 20MW and up will be modeled  Each power plant will be denoted by a node  Nodes are connected with arcs to transmission nodes and transportation nodes  Excel files were created with the necessary information to run NETPLAN 10

CONSTRAINTS/CONSIDERATIONS  Uses GoogleEarth for part of the visualization for input and output files o GoogleEarth allows easy modeling of Iowa infrastructure and is free for all users  Generation and Transportation Cutoffs o Unable to include every generation plant, transmission line, or highway o Generation cutoff – 20MW o Transmission cutoff – 115kV 11

12

DESIGN PROCESS 13.csv data files Nodes map Created Iowa Data Our senior design team will collect data of Iowa’s energy infrastructure and transportation. The data will be as points were formatted in Excel spreadsheets.

DESIGN PROCESS 14 KML files stored in ISU server NETPLAN KML files will stored on ISU’s server ready to read by the Google Earth implementation in our project’s website. Transmissions lines will not display as point, but will mapped out with Photoshop and save as KML file on ISU’s server as well.

DESIGN PROCESS 15 NETPLAN Website The output will be mainly from NETPLAN and will be in three difference forms Visual in Google Earth, graphic in chart area relationship, and Data table in excel.

INPUT SPECIFICATION 16 Input menu will appear from design’s website will allow users to choose different energy Investment scenarios also to run NETPLAN software

DESIGN SPECIFICATION 17  Languages: Java, HTML, and C++  Software: CPLEX and NETPLAN  Technologies: Google Earth and Graphic User Interface (GUI)  Server: ISU Linux server

NETPLAN RESULTS  Once NETPLAN runs it will show the projected investment o Displays the resiliency of the system  These are influenced by the users initial specifications o Displays investment planning and emissions o Output displayed by events  Such as load increases 18

TEST PLAN 19  Create Base Case for Iowa Infrastructure o Current Generation and Transportation  Simulate Investment Strategy for Iowa with Specified Parameters Using NETPLAN o Parameters Changeable by User  Load Growth, Emissions, etc.  Display Results on Website

20  Using multiple software and computer language  Google Earth map requires Google Earth plug- in to be embedded in the website  Finding most recent data  Restricted data  Working with NESCORE21 research group  Using newly developed software NETPLAN

RESOURSCES AND COST ESTIMATE 21  The software license will cost approximately $4,000  If it include labor hours, there almost 400 hours of work in $20/hour rate that will total of $8,000  Poster $50 Total cost ≅ $12,050 “including Labor”

PROJECT SCHEDULE 22 Spring Semester

PROJECT SCHEDULE 23 Fall Semester

CURRENT PROJECT STATUS 24  Base Case/NETPLAN o Transmission, Generation, and Transportation files have been completed o Natural Gas, Generation Investment, and Transportation Investments are in progress o Passenger Transportation modeling is currently being adapted into NETPLAN  Website Construction o General website has been created o GUI for public interaction will be started once base case is successfully demonstrated

TASK RESPOSIBILITY AND CONTRIBUTION 25 NameTaskTotal Hours Michael HealyData development, analysis, and documentation 45 Deogratius MpingeSoftware design and documentation 51 Spenser MussmannData development, analysis, and develop investment decision 57 Abdelmagid YousifSoftware design and develop investment decision 57 Total 210

PLAN FOR NEXT SEMESTER 26  Writing the codes to run NETPLAN form the website  Improve Google Earth map view  Proposed solution for long-term (40+ years) energy investment  Deliverable: website, documents, and poster

QUESTIONS? 27

REFERENCES 28 Senior design team Dec10_12 Wind picture Transmission lines picture Plug in car picture in-electric-car-technology.jpg Highway picture dict/photofiles/list/4592/6074highway.jpg Electric train picture train.jpg Power plant picture content/uploads/2008/11/south-platte-river-power-plant.jpg

29