Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 ASAR On-board Instrument  Instrument Stability and Status  Instrument Adjustments  Tracking.

Slides:



Advertisements
Similar presentations
Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case.
Advertisements

RA-2 & MWR QWG meeting – ESA/ESRIN – 24 March, 2003 Envisat RA-2 and MWR Events since October 2002 Pierre Féménias ESA/ESRIN.
Page 1 ENVISAT Calibration Review, ESTEC, 9 September 2002 ENVISAT Calibration Review Objectives Prepared by: J. Louet.
Lorentz force detuning measurements on the CEA cavity
7. Radar Meteorology References Battan (1973) Atlas (1989)
M. Younis Design Optimization Aspects for Reflector Base Synthetic Aperture Radar Marwan Younis, Anton Patyuchenko, Sigurd Huber, and Gerhard Krieger,
MR P.Durkee 5/20/2015 MR3522Winter 1999 MR Remote Sensing of the Atmosphere and Ocean - Winter 1999 Active Microwave Radar.
Folie 1 Ambiguity Suppression by Azimuth Phase Coding in Multichannel SAR Systems DLR - Institut für Hochfrequenztechnik und Radarsysteme F. Bordoni, M.
Folie 1 Performance Investigation on the High-Resolution Wide-Swath SAR System Operating in Stripmap Quad-Pol and Ultra-Wide ScanSAR Mode DLR - Institut.
Roughness Correction Working Group Report July 21, 2010 Seattle 6 th Aquarius/SAC-D Science Team meeting.
A SINGLE FREQUENCY GPS SOFTWARE RECEIVER
Development of Active Phased Array Weather Radar
Surveillance Weather Radar 2000 AD. Weather Radar Technology- Merits in Chronological Order WSR-57 WSR-88D WSR-07PD.
Spaceborne Weather Radar
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Spaceborne Radar for Snowfall Measurements
Efficient design of a C-band aperture-coupled stacked microstrip array using Nexxim and Designer Alberto Di Maria German Aerospace Centre (DLR) – Microwaves.
1 ECE 480 Wireless Systems Lecture 3 Propagation and Modulation of RF Waves.
ENVISAT Validation Workshop - Frascati - 9–13 December 2002 Opening Session:  Welcome [G. Kohlhammer]  Workshop Objectives and Organisation [H. Laur]
WMO/ITU Seminar Use of Radio Spectrum for Meteorology Earth Exploration-Satellite Service (EESS)- Active Spaceborne Remote Sensing and Operations Bryan.
Distributed Adaptive Control and Metrology for Large Radar Apertures Principal Investigator: James Lux, P.E. (337) Dr. Elaine Chapin (334), Samuel Li (337),
Page 1 ASAR Validation Review - ESRIN – December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in.
25 Sept. 2006ERAD2006 Crossbeam Wind Measurements with Phased-Array Doppler Weather Radar Richard J. Doviak National Severe Storms Laboratory Guifu Zhang.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
OC3522Summer 2001 OC Remote Sensing of the Atmosphere and Ocean - Summer 2001 Active Microwave Radar.
International Ocean Vector Winds Science Team Meeting, Annapolis, May 2011 ASCAT backscatter processing status Julia Figa-Saldaña, Craig Anderson, Hans.
Polarimetric Solid State Radar Design for CASA Student Test Bed
Laser-Astrodynamics, Space Tests of Relativity, and Gravitational Wave Astronomy 3 rd International ASTROD Symposium – Beijing, China – July 2006 TIME.
SWOT Near Nadir Ka-band SAR Interferometry: SWOT Airborne Experiment Xiaoqing Wu, JPL, California Institute of Technology, USA Scott Hensley, JPL, California.
OSTST Hobart 2007 – Performance assessment Jason-1 data M.Ablain, S.Philipps, J.Dorandeu, - CLS N.Picot - CNES Jason-1 GDR data Performance assessment.
Phase and Gain stability of optical fibre link used in MeerKAT Author : Roufurd Julie Supervised by : Prof Michael Inggs SKA HCD bursary conference Dec.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
Page 1 ENVISAT Validation Review – Frascati – 9-13 December st Envisat Validation Workshop MERIS, December 2002 Conclusions and Recommendations.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
Microwaves and Radar Institute Distributed Imaging with TSX and TDX Pau Prats, Paco López-Dekker, Francesco De Zan, Steffen Wollstadt,
SuperDARN operations Pasha Ponomarenko.
Design Features of a Boresighted GPM Core Radiometer Christopher S. Ruf Dept. of Atmospheric, Oceanic & Space Sciences University of Michigan, Ann Arbor,
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
Distributed Adaptive Control and Metrology for Large Radar Apertures PI: James Lux Co-Is: Adam Freedman, John Huang, Andy Kissil, Kouji Nishimoto, Farinaz.
Page 1 ASAR Validation Review - ESRIN – December 2002 IM and WS Mode Level 1 Product quality update F Introduction F IM Mode Optimisation F Updated.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13 December 2002 ASAR Validation Review AP and GM Level 0 Product Quality Birgit Schättler Remote Sensing.
ISRO RADAR DEVELOPMENT UNIT, BANGALORE. PRESENTATION TO CHAIRMAN - ISRO & MEMBERS - ISRO COUNCIL NRSA LECTUREGPM – GV MEETING # 2 ISRAD GROUND VALIDATION.
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
Estimation of wave spectra with SWIM on CFOSAT – illustration on a real case C. Tison (1), C. Manent (2), T. Amiot (1), V. Enjolras (3), D. Hauser (2),
InSAR Application for mapping Ice Sheets Akhilesh Mishra Dec 04, 2015.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Antenna Elevation Pattern Estimation from Rain Forest Data M. Zink ENVISAT Programme ESA-ESTEC.
ASI, February 2009 The GRAS Instrument C. Marquardt, Y. Andres, A. von Engeln, F. Sancho.
Doc.: IEEE /0632r0 Submission May 2015 Intel CorporationSlide 1 Experimental Measurements for Short Range LOS SU-MIMO Date: Authors:
Page 1 ASAR Validation Review - ESRIN – December 2002 Advanced Technology Centre ASAR APP & APM Image Quality Peter Meadows & Trish Wright  Properties.
1 A conical scan type spaceborne precipitation radar K. Okamoto 1),S. Shige 2), T. Manabe 3) 1: Tottori University of Environmental Studies, 2: Kyoto University.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
WP120 External Calibration of Spaceborne Microwave Remote Sensing System Sensors Objective:Evaluation of external calibration needs for a variety of microwave.
Imaging Radars: system architectures and technologies G. Angino, A. Torre Frascati, INFN, 2011, November 28th.
ERS-2 Scatterometer: Instrument and data performances assessment since the beginning of the mission R. Crapolicchio (1), G. De Chiara (1), A. Paciucci.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Systematic Product Analysis Christopher Buck ENVISAT Programme ESA/ESTEC.
Highly Accurate Wide-Range FM-CW Radar Altimeter
(2) Norut, Tromsø, Norway Improved measurement of sea surface velocity from synthetic aperture radar Morten Wergeland Hansen.
AAVS1 Calibration Aperture Array Design & Construction Consortium
Alternating Polarization ´Single´ Look Complex Product Status
A study on the coexistence between Direct Air to Ground Communication (DA2GC) and Radars in the 5 GHz band Peter Trommelen, Rob van Heijster,
Objectives Using a time series of data from radar sensors to detect and measure forest changes Combining different types of data, including: Multi polarisations.
Efficient Estimation of Residual Trajectory Deviations from SAR data
Light 24 GHz Multi-Channel RADAR System Aiding Unmanned Aerial Vehicle Navigation Soumyaroop Nandi.
Developed by Eastwood Im Jet Propulsion Laboratory
Open book, open notes, bring a calculator
Polarization Calibration
Final Project: Phase Coding to Mitigate Range/Velocity Ambiguities
Spaceborne Radar for Snowfall Measurements
Detecting phase Alexandra Andersson Jonathan Sladen
Electronically Steered Antennas
Presentation transcript:

Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 ASAR On-board Instrument  Instrument Stability and Status  Instrument Adjustments  Tracking Changes of Beam Patterns  Beam Pattern Maintenance Ramon Torres ENVISAT Programme ESA – ESTEC Noordwijk, The Netherlands

Page 2ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Instrument Stability  Relies on the RF Subsystem internal control and the temperature compensation scheme implemented in the Antenna Sub-arrays (Before use of the Internal Calibration correction)  ASAR Instrument has proven to be very stable in short and long term  Short term as demonstrated by the internal calibration pulses viewed through time  Long term as demonstrated by the use of the Module Stepping calibration mode

Page 3ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Reminder: ASAR Antenna  Major element in the ASAR end-to-end product quality  Active antenna with 320 individual subarrays  T/R module: Transmit/Receive in H and V polarisation  5 panels  4 tiles  16 subarrays  Control and operations at tile level  Temperature compensation scheme based on individual sub-array on-ground characterisation  Radar mode timing  Pattern definition at row level  8 Stripmap beams  5 ScanSAR beams

Page 4ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Antenna Temperature  Initial temperatures were lower than predicted  Increased operations from May 3 achieved realistic temperature conditions:  0  -6  for HR only  4  -10  for full  Low temperatures corresponding to instrument switchoffs

Page 5ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Short Term Stability – Internal Calibration Tx Main Rx Main Radiating Row T/R Module (1 of 32x10) Signal BFN Cal BFN Tx Aux Rx Aux Cal  Variations in Tx signal and Rx conditions during acquisition  Analysis of the internal calibration pulses  P1  Tx  P2  Rx  P3  RF s/s P2 P3 P1

Page 6ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Short term Stability  Instrument variations are taken into account by the ASAR internal calibration, nevertheless:  RF s/s conversion levels are extremely stable (P3 pulse July 21-August 9)  Variations of Tx and Rx characteristics due to temperature at antenna level are well handled by the temperature compensation scheme (P1 and P2 pulses for row 18, July 21-August 9) 

Page 7ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Long Term Stability  Long-term (along the instrument lifetime): Sub-array T/R module failures, drifts and degradation  ASAR monitors T/R modules for failures or drifts for eventual correction  Use of Module Stepping Mode:  Sampling all 320 T/R modules sequentially in less than 1 s (Tx/Rx Gain/Phase) anywhere in the orbit  Comparison with reference measurement  Statistical analysis of variations

Page 8ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Long Term Stability - Module Stepping Mode  Individual T/R Modules  Tx and Rx  H and V  Gain and Phase Tx Main Rx Main Signal BFN Cal BFN Tx Aux Rx Aux Cal T/R Module Radiating Row TxRx

Page 9ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Module Stepping - Last Results - TxH <> ± 1.5 dB <> ± 3.0 dB <> ± 10.0 dB >< ± 10.0 dB <> ± 5.65º <> ± 11.2º <> ± 22.5º >< ± 22.5º 

Page 10ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Module Stepping - Last Results - RxH <> ± 1.5 dB <> ± 3.0 dB <> ± 10.0 dB >< ± 10.0 dB <> ± 5.65º <> ± 11.2º <> ± 22.5º >< ± 22.5º

Page 11ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Module Stepping - Last Results - TxV <> ± 1.5 dB <> ± 3.0 dB <> ± 10.0 dB >< ± 10.0 dB <> ± 5.65º <> ± 11.2º <> ± 22.5º >< ± 22.5º 

Page 12ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Module Stepping - Last Results - RxV <> ± 1.5 dB <> ± 3.0 dB <> ± 10.0 dB >< ± 10.0 dB <> ± 5.65º <> ± 11.2º <> ± 22.5º >< ± 22.5º

Page 13ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Long-term Stability Tx HRx HTx VRx V Gain  0.25 dB0.40 dB0.30 dB0.49 dB Phase  2.9º3.4º3.2º3.4º  Analysis on the T/R modules from Sep/02 to Nov/24  Close to the LSB step both for gain and phase  Tx / Rx difference from Rx gain droop not compensated in calibration modes:  0.22 dB (Rx gain droop)  0.25 dB (gain control) 

Page 14ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Instrument Adjustments  Early corrections:  On board beam coefficients for ScanSAR modes  Up and down converter levels  Sub-array gain and phase offsets  Timing parameters  Wave Mode exit timing  Control Software patches from operational failures  Historical Swath parameters  N-2 echo-shift  Wave mode telemetry  Alternate Polarisation mode annotation  Global Monitoring mode exit  Parameter optimisation from calibration activities:  Receiver gain adjustments  Image and WideSwath bandwidths  WideSwath timeline

Page 15ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Adjustments: Early Corrections  ScanSAR beam coefficients wrongly burnt in the on-board EPROMs  upload of new  Up and down converter levels too low for Module Stepping mode  upload of new  Gain and phase offsets to correct on-ground deviations and post-launch drifts  upload  Timing parameters not compatible with orbit data  upload of new  Wave Mode exit timing not compatible with complete vignette termination  MPS control

Page 16ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Adjustments: Parameter Optimisation  Receiver Gain for all modes and beams in order to maximise the dynamic range  Image Mode Bandwidth increased to maximum 16MHz for all beams  WideSwath Bandwidth increased:  WideSwath Timeline modified by reducing the number of pulses per burst to improve azimuth ambiguities: SS1SS2SS3SS4SS SS1SS2SS3SS4SS

Page 17ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 On-board Software Patches  Historical Swath Parameters  Switchdowns  Uploaded 02-Aug Anomaly solved!  N-2 Echo Shift  Large shifts in images  Uploaded 05-Sep Anomaly solved!  Wave Mode telemetry handling between vignettes  Switchdown  Uploaded 17-Oct Anomaly solved!  Alternate Polarisation Annotation of the SWST changes  Shift between polarisations  Uploaded 11-Nov Anomaly solved!  Global Monitoring exit  Switchdown  Uploaded completed 9 December at 18:56:16. GM operating correctly from 9 December at 19:02:30 

Page 18ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Tracking Beam Pattern Changes  Estimation based on Module Stepping results and the radiation model of each sub-array based on  On-ground characterised embedded row pattern for elevation  Uniform distribution for azimuth  Generation of antenna radiation patterns:  full elevation and azimuth pattern for ambiguity analysis  swath elevation pattern for tracking changes  swath azimuth pattern for Doppler estimation and descalloping  A single MS generates the full set of antenna patterns (Tx/Rx and Hpol/Vpol)

Page 19ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Synthesis of Elevation Patterns  IS1 Pattern:  Elevation VV  Measured Pre-launch  Estimated Rainforest  Simulated from MS  Elevation HH  Measured Pre-launch  Estimated Rainforest  Simulated from MS  Conclusion:  MS agrees with RF within ± 0.2 dB  Same order as pre- launch patterns

Page 20ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Synthesis of Azimuth Patterns  June 2002 image mode IS3 over Edam, Zwolle and Swifterband  Very good correlation between simulated data and transponder flyovers  Better than 2 db at the level of – 20db (  0.02db)  IS1 synthesised from MS  Mispointing agrees with doppler

Page 21ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Pattern Estimation: Conclusions  Rainforest estimation:  Estimation approach based on combinations of pattern estimates in different modes (IM&WS) with a standard deviation of ~0.1dB  Long process as it requires several acquisitions per beam and polarisation  Synthesis from Module Stepping results:  Very good tool to track variations of the antenna radiation patterns  From a 1-second acquisition full set of radiation patterns can be generated as frequently as needed (no orbit constraint)  Elevation patterns can be simulated with an error of 0.2dB due to limited quality of ground characterisation data  Embedded row patterns measured with only 14 tiles and insufficient control of T/R modules  Azimuth patterns and pointing can be simulated better than 0.02dB and 0.01  

Page 22ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Antenna Elevation Pattern Maintenance Antenna IMBF Test Results Reference Module Stepping Antenna IMBF Test Results Rainforest Patterns Module Stepping Module Stepping Module Stepping Module Stepping Offset/K0 Correction TRM Drifts TRM Failures MS Analysis Offset/K0 TRM Drifts TRM Failures Offset/K0 MS Analysis Rain Forest TRM Drifts TRM Failures Offset/K0 New Coefficients Rain Forest (TSS Failures) Rain Forest Far sidelobes MS Analysis Far sidelobes 

Page 23ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 Antenna Azimuth Pattern Maintenance Antenna IMBF Test Results Reference Module Stepping Antenna IMBF Test Results Synthesised Patterns Module Stepping Module Stepping Module Stepping Module Stepping Offset/K0 Correction TRM Drifts TRM Failures TRM Drifts TRM Failures Offset/K0 Transponder TRM Drifts TRM Failures Transponder (TSS Failures) MS Analysis Offset/K0 MS Analysis Offset/K0 MS Analysis New Coefficients 